Details
DEPT OF DEFENSE · DEPT OF THE AIR FORCE · AIR EDUCATION AND TRAINING COMMAND · FA3300 42 CONS CC is soliciting Amendment 0001- Conex Refurbishment, Officer Training School (OTS), Maxwell AFB. Solicitation number FA330026P0819. Classified under NAICS 238350 — Finish Carpentry Contractors. Product/service code J054 — MAINT/REPAIR/REBUILD OF EQUIPMENT- PREFABRICATED STRUCTURES AND SCAFFOLDING. Place of performance: AL, USA. Responses are due by 08 September 2026 18:00 UTC. Posted on SAM.gov, the US federal contract opportunities system; registration is required to bid.
Statement of Requirements Conex Refurbishment, Officer Training School (OTS), Maxwell AFB
- Purpose: The purpose of this requirement is to obtain comprehensive restoration services for 27 Conex containers located at the Vigilant Warrior (VW) training site. The restoration is necessary to eliminate significant safety hazards posed by severe wood deterioration, restore the environmental integrity of the containers, and ensure their operational effectiveness for training over 5,000 cadets annually.
- Description of Items: The contractor shall provide all necessary personnel, supervision, materials, equipment, tools, and services to perform complete restoration and repair of the 27 Conex containers. The work includes, but is not limited to, the following:
- Structural Component Restoration
- Assess and replace all deteriorated wood framing, flooring, and structural elements.
- Ensure all replacement materials meet or exceed original load-bearing specifications and comply with military construction standard UFC 1-200-01.
- All structural modifications must be certified by a licensed structural engineer.
- Window and Door Frame Restoration
- Restore window and door frames to provide a complete weatherproof seal when closed.
- Hardware must enable secure locking mechanisms to prevent unauthorized access.
- Materials used must resist corrosion and deterioration in outdoor environments.
- Environmental Protection Systems
- Achieve complete weather resistance to prevent water, snow, and wind infiltration.
- All joints, seams, and penetrations must be properly sealed.
- All openings must be sealed to prevent the entry of rodents, birds, and insects.
•
- Delivery Requirements:
- The contractor shall provide a detailed construction phasing plan to the government for approval. The plan must ensure that a minimum of 70% of the containers remain operational at all times. No more than 12 containers may be out of service simultaneously without prior government approval.
- The work will be performed on-site at the Vigilant Warrior training site located in Elmore County, Alabama. The address is: 407 Lakeland Drive, Titus AL.
- Installation Requirements: The contractor will be responsible for the installation of all new materials and components as part of the restoration services. When material replacement is required, the contractor shall procure and install materials as per specifications approved by Officer Training School (OTS).
- Standard Warranty: The contractor shall provide any Original Equipment Manufacturer (OEM) standard commercial warranty applicable to the products being purchased at no additional cost to the Government. Warranty shall include, as a minimum, technical support, troubleshooting assistance, and replacement of faulty equipment. The contractor must provide a 48-hour response for any warranty issues that affect training operations. All materials shall demonstrate a minimum 15-year service life, with a manufacturer's warranty of a minimum of 10 years on primary structural components.
•
- Prior to project acceptance, the contractor shall provide the customer with all manufacturer warranties as needed for any component incorporated into this project such as equipment manuals, literature, and other documentation on all equipment.
- Prior to project acceptance, the contractor shall provide the written procedures, points of contact within the company, and required information for all warranty services prior to project acceptance. This information shall include written confirmation of the warranty period, phone numbers and contact information/procedures for technical support, troubleshooting assistance, and replacement of faulty equipment.
- General Information: Items must be brand new. Refurbished items are not authorized.
- Reporting: The contractor is required to provide monthly progress reports detailing progress, materials used, quality control activities, and any safety incidents.
- Quality Control: The contractor shall establish and maintain a Quality Control Program. A Quality Program Plan (QPP) must be submitted within 30 days of contract award. This program will include inspection hold points at 25%, 50%, and 75% completion for each container, with government inspection rights at each phase.
Statement of Requirements Conex Refurbishment, Officer Training School (OTS), Maxwell AFB
- Purpose: The purpose of this requirement is to obtain comprehensive restoration services for 27 Conex containers located at the Vigilant Warrior (VW) training site. The restoration is necessary to eliminate significant safety hazards posed by severe wood deterioration, restore the environmental integrity of the containers, and ensure their operational effectiveness for training over 5,000 cadets annually.
•
- Description of Items: The contractor shall provide all necessary personnel, supervision, materials, equipment, tools, and services to perform complete restoration and repair of the 27 Conex containers. The work includes, but is not limited to, the following:
- Structural Component Restoration
- Assess and replace all deteriorated wood framing, flooring, and structural elements.
- Ensure all replacement materials meet or exceed original load-bearing specifications and comply with military construction standard UFC 1-200-01.
- All structural modifications must be certified by a licensed structural engineer.
- Window and Door Frame Restoration
- Restore window and door frames to provide a complete weatherproof seal when closed.
- Hardware must enable secure locking mechanisms to prevent unauthorized access.
- Materials used must resist corrosion and deterioration in outdoor environments.
- Environmental Protection Systems
- Achieve complete weather resistance to prevent water, snow, and wind infiltration.
- All joints, seams, and penetrations must be properly sealed.
- All openings must be sealed to prevent the entry of rodents, birds, and insects.
• •
- Delivery Requirements:
- The contractor shall provide a detailed construction phasing plan to the government for approval. The plan must ensure that a minimum of 70% of the containers remain operational at all times. No more than 12 containers may be out of service simultaneously without prior government approval.
- The work will be performed on-site at the Vigilant Warrior training site located in Elmore County, Alabama. The address is: 407 Lakeland Drive, Titus AL.
•
- Installation Requirements: The contractor will be responsible for the installation of all new materials and components as part of the restoration services. When material replacement is required, the contractor shall procure and install materials as per specifications approved by Officer Training School (OTS).
•
- Standard Warranty: The contractor shall provide any Original Equipment Manufacturer (OEM) standard commercial warranty applicable to the products being purchased at no additional cost to the Government. Warranty shall include, as a minimum, technical support, troubleshooting assistance, and replacement of faulty equipment. The contractor must provide a 48-hour response for any warranty issues that affect training operations. All materials shall demonstrate a minimum 15-year service life, with a manufacturer's warranty of a minimum of 10 years on primary structural components.
• •
- Prior to project acceptance, the contractor shall provide the customer with all manufacturer warranties as needed for any component incorporated into this project such as equipment manuals, literature, and other documentation on all equipment.
- Prior to project acceptance, the contractor shall provide the written procedures, points of contact within the company, and required information for all warranty services prior to project acceptance. This information shall include written confirmation of the warranty period, phone numbers and contact information/procedures for technical support, troubleshooting assistance, and replacement of faulty equipment.
•
- General Information: Items must be brand new. Refurbished items are not authorized.
- Reporting: The contractor is required to provide monthly progress reports detailing progress, materials used, quality control activities, and any safety incidents.
- Quality Control: The contractor shall establish and maintain a Quality Control Program. A Quality Program Plan (QPP) must be submitted within 30 days of contract award. This program will include inspection hold points at 25%, 50%, and 75% completion for each container, with government inspection rights at each phase.
Amendment 0001 - Please see updated SOR, Combo Solicitation and Questions/Answer
Context for bidders
We hold 11 notices from DEPT OF DEFENSE · DEPT OF THE AIR FORCE · AIR EDUCATION AND TRAINING COMMAND · FA3300 42 CONS CC, going back to August 2026 — 11 of them still open. They buy mostly in Construction & Infrastructure, Facility Management & Cleaning and Manufacturing & Supply. There are 516 open Construction & Infrastructure tenders in United States. This one closes in 2 days.
More from this buyer
- Eaker Center Electrical Outlets RFQ — Install of Elect-Elct EQ· closes 16 Sept
- Visual (AV) Requirement_Maxwell AFB_Solicitation — Video Recording and Reproducing Equipment· closes 17 Sept
- FY26 AFROTC CPR Instructors — Education/Training- General· closes 10 Sept
- FY 26 SOS HVAC Duct Cleaning RFQ· closes 19 Sept
- AMENDMENT 0001- FY26 AFJAGS Duct Cleaning· closes 8 Sept
Similar Construction & Infrastructure tenders
- Repair Elevator at B606, Cfac — Repair or Alteration of Office Buildings· closes 11 Sept
- HVAC Quarterly Maintenance for Region 9 PAO· closes 12 Sept
- National Park Service - Independence National Hist· closes 22 Sept
- 1333MF26Q0087 Amendment — Maintenance of Other Administrative Facilities and Service Buildings· closes 12 Sept
- FEMA Region 2 Naval Weapons Station Earle Building C-54 HVAC Rooftop Units Replacement and Mini Split Units for Server Room & Warehouse· closes 11 Sept
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Construction & Infrastructure tenders
- Notice for Shifting of Wadala Branch (1102)State Bank of India · India
- Replacement of 2 HP single phase Submersible pump motor set for Staff quarter at Mithanpura Muzaffarpur under Muzaffarpur BABSNL — Bihar · India
- Construction of a toilet at the Nageshwar Kapali Temple in Queens Park Colony, Ward No. 08Directorate Urban Administration and Development · Join Director-Indore Division - UAD · Dhar -Nagar Palika Dhar - UAD · India
- 2ND Call of MRF/Compost Plant Construction and Machinery Installation Work in Billowa Under SBM 2.0Directorate Urban Administration and Development · Join Director-Gwalior Division - UAD · Gwalior -Nagar Parishad Bilaua - UAD · India
- E Tender for Construction of outdoor Basketaball Lawn Tennis Court and Volleyball Court 2026 Ist CallDirectorate Sports and Youth Welfare · India
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →