FreeTender
Accepting bidsrfpBangladesh

Request for Proposal: First (1st) and Second (2nd) Floor Renovation Works for ADB Bangladesh Resident Mission (BRM) Office

Issued by Asian Development Bank · via ADB — Asian Development Bank (institutional procurement)

Published
2 Oct 2026
Closes
26 Oct 2026, 23:59 UTC
Reference
rfp-brm-fit-out-1st-2nd-floor-brm-office
Location
Bangladesh
Sector
Construction & Infrastructure

Details

ASIAN DEVELOPMENT BANK Bangladesh Resident Mission (BRM) First (1st) and Second (2nd) Floor Renovation Works for ADB Bangladesh Resident Mission (BRM) Office REQUEST FOR PROPOSAL The Asian Development Bank (ADB) invites you to submit a competitive proposal for the First (1st) and Second (2nd) Floor Renovation Works for ADB Bangladesh Resident Mission (BRM) Office. The Works shall be delivered in all respects and installed in ADB in accordance with the specifications outlined in Appendix 1 – Work Performance Statement. In case of an international company, a Joint Venture with a local company meeting this requirement is required. (iv) Demonstrate financial capacity to fulfil the requirements of the scope. The bidder shall demonstrate financial capacity by meeting either of the following requirements: a. Access to an available bank -certified credit line, net other commitments of at least $500,000 equivalent, issued within 90 days prior to the bid submission deadline. The above link contains a guide on company registration in Coupa which is required to access and download the tender documents.

Issued: 2 October 2026

Closing: 26 October 2026

Institutional (corporate) procurement by the Asian Development Bank, Manila. Full terms are in the attached notice.

Context for bidders

We hold 19 notices from Asian Development Bank, going back to June 2026 — 6 of them still open. They buy mostly in Financial & Professional Services, Construction & Infrastructure and Energy & Power. There are 830 open Construction & Infrastructure tenders in Bangladesh. This one closes in 24 days.

Similar Construction & Infrastructure tenders

Documents

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Construction & Infrastructure tenders

All Construction & Infrastructure tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →