FreeTender

This tender closed on 8 September 2026 — kept here for reference.

Bids are no longer accepted. Scroll down for this buyer's record and what they have open now, or browse Construction & Infrastructure tenders · latest notices worldwide

ClosedtenderUnited States

Nolin River Lake Fuel Tank Painting and Signage

Issued by DEPT OF DEFENSE · DEPT OF THE ARMY · USACE · LRD · W072 ENDIST LOUISVILLE · via SAM.gov — US federal contract opportunities

Published
28 Aug 2026
Closed
8 Sept 2026, 14:00 UTC
Reference
W912QR26QA100
Location
United States
Sector
Construction & Infrastructure

Details

DEPT OF DEFENSE · DEPT OF THE ARMY · USACE · LRD · W072 ENDIST LOUISVILLE is soliciting Nolin River Lake Fuel Tank Painting and Signage. Solicitation number W912QR26QA100. Classified under NAICS 238320 — Painting and Wall Covering Contractors. Product/service code Z1NZ — MAINTENANCE OF OTHER UTILITIES. Responses are due by 08 September 2026 14:00 UTC. Posted on SAM.gov, the US federal contract opportunities system; registration is required to bid.

****Amendment 0001 START**** Solicitation W912QR26QA100 is hereby amended as follows on 28 August 2026: Due to a due Date error and additions to the Scope of Work, the following changes have been made.

  • The deadline to submit a quote has been adjusted to 8 September 2026 at 10:00AM EDT on the 1449.
  • Additions have been made to the Scope of Work concerning Paint color and finish, CLIN 005 signage, the existing coating and coating requirements.

*NOTE: The due date for quotes is updated to 08 September 2026 at 10:00AM ET.*

*NOTE: All amendments shall be signed and submitted with the quote.* (Amendment 0001 )

*NOTE: ALL contractors must resubmit their quote by the stated deadline in order to be considered*

*NOTE: The due date for quotes has been updated. Quotes are now due on 08 September at 10:00 AM ET.

****Amendment 0001 END**** This Request for Quote (RFQ) is for the contractor to preform Fuel Tank Painting and Signage at Nolin River Lake, in accordance with the attached Scope of Work (SOW). The contractors work and responsibility will include all planning, programming, administration, management, supervision, communications, and inspection necessary to ensure that all work is conducted in accordance with the contract requirements and all applicable Federal, State and Local laws and regulations. All work will be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein. The Contractor shall begin work within 14 days of the Notice of Award. All work shall be completed at Nolin River Lake within 60 calendar days from the start of work. One award will be made with this Solicitation. Location: Nolin River Lake 2150 Nolin Dam Road Mammoth Cave, KY 42259This procurement is 100% set-aside for Small Business, NAICS 238320 (Size Determination $19M). Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor. One award will be made from this Solicitation. Note: The contract award will be based on Lowest Price to the Government. Quotes are due on 04 September 2026 at 10:00 AM Eastern Time. Local Time shall be considered the LRL HQ and not the project site in reference to block 8 of the solicitation Electronic submittals will be accepted. You must submit your quote through PIEE (directions are attached). Fax, telephones, or mailed submittals will not be accepted. For contractual questions, please contact Kellsie Peacher by e-mail at [contact details removed]. **ALERT: All contractors must be registered in the System for Award Management (www.SAM.gov) prior to contractors submission. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic Funds Transfer System for Award Management, which indicates All payments by the Government under this contract shall be made by electronic funds transfer (EFT). Those not currently registered can obtain registration by going to the website http://www.SAM.gov. Effective June 29, 2018 vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter. However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 days of activation or the vendor risks no longer being active in SAM. Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity Identifier. The new registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards. Remember, there is no cost to use SAM. To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.sam.gov). PLEASE NOTE: SAM is completely free of charge for both registrants and users.

This notice has closed — what to do next

We hold 23 notices from DEPT OF DEFENSE · DEPT OF THE ARMY · USACE · LRD · W072 ENDIST LOUISVILLE, going back to August 202623 of them still open. They buy mostly in Construction & Infrastructure, Manufacturing & Supply and Facility Management & Cleaning. There are 704 open Construction & Infrastructure tenders in United States.

Browse all open Construction & Infrastructure tenders →

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Construction & Infrastructure tenders

All Construction & Infrastructure tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →