Consulting for the preparation of the second generation of Departmental Road Plans and the National Rural Departmental Road Plan 2027
Issued by Inter-American Development Bank (IDB) · via IDB — BID for the Americas (Inter-American Development Bank)
- Published
- 9 Sept 2026
- Closes
- 23 Sept 2026, 02:09 UTC
- Value
- USD 1,80,000
- Reference
- UR-T1359
- Location
- Uruguay
- Sector
- Construction & Infrastructure
Details
The Inter-American Development Bank (IDB), in coordination with the Office of Planning and Budget (OPP), the 19 Departmental Governments of Uruguay and national authorities, is calling on consulting firms to submit proposals to design and develop the second generation of the Departmental Road Plans (PVD) and the National Rural Departmental Road Plan for the decade 2027–2036.
1. Objectives and technical scope
Strategic update and diagnosis: Evaluate the implementation of the first generation of road plans and update the diagnosis of the departmental rural network, linking the state of the road and service levels with the logistics and transport costs of the country's main production chains.
Technical Policy and Economic Evaluation: Establish criteria to define technical solution families according to traffic, loads, soil support, drainage, and climate vulnerability. Perform aggregated and reproducible economic assessments (using HDM-4 or other tools) to calculate life-cycle costs, benefits, and decision thresholds.
Investment and cross-cutting portfolios: Formulate flexible strategic portfolios for investment, pre-investment and maintenance at the departmental and national levels, incorporating cross-cutting approaches to climate resilience, road safety, accessibility, inclusion and digitalisation.
2. Governance, fiscal strategy and institutionality
Articulated institutional arrangement: Propose a mechanism for the selection, prioritization and approval of interventions that formally integrates the Ministry of Economy and Finance (MEF), the OPP, the Departmental Governments and the Sectoral Commission on Decentralization, ensuring a national logistical vision.
Fiscal and financing strategy: Design a medium-term strategy connected to the national and subnational budget cycles, which serves as an input to define the components, indicators, and priorities of the IDB's next financing operations (CCLIP).
Information and follow-up system: Define a permanent system of information, monitoring, supervision and updating for the management of the integral cycle of road projects.
3. Expected results and outputs
Output 1 — Work plan: Operational document with the final schedule, risk matrix, institutional engagement strategy and methodological approaches for the review and development of the study components.
Output 2 — Diagnosis, evaluation and intermediate results: Evaluation of the first generation of developing countries, updated national and departmental diagnosis, preliminary version of the methodology tested in a pilot, progress of the fiscal strategy and preliminary validation of the project portfolio.
Output 3 — Final outputs (PVDs and PNRC 2027–2036): Final consolidation of the 19 Departmental Road Plans, the National Plan 2027–2036, the final prioritization methodology, economic evaluations, institutional arrangement, and all geospatial archives (GIS) and replicable databases.
Note: Interested companies should review the requirements on the BEO Bidder Portal.
Executing unit: Inter-American Development Bank (IDB)
IDB project: UR-T1359
Contact: [contact details removed]
Financed by the Inter-American Development Bank (IDB).
Context for bidders
We hold 48 notices from Inter-American Development Bank (IDB), going back to August 2026 — 18 of them still open. They buy mostly in Financial & Professional Services, Water & Environment and Social Development & Inclusion. There are 2 open Construction & Infrastructure tenders in Uruguay. This one closes in 14 days.
More from this buyer
- Consulting for the strengthening of the system of physical and financial monitoring of public investment in Honduras· closes 15 Sept
- Support for green/sustainable bond readiness, framework development, post-issuance verification, and capacity building· closes 17 Sept
- Specialized consultancy for the evaluation of candidates for the Board of the Strategic Fund of Paraná and Mapping of Executive Profiles for Invest Go· closes 10 Sept
- Strengthen institutional capacities through specialized training in skills for the technical teams of the Chilean Protection Service· closes 11 Sept
- Standards alignment, taxonomy and key performance indicator advisory, and certification-readiness review for the Jamaica Agrifood Resilience Instrument· closes 10 Sept
Similar Construction & Infrastructure tenders
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Construction & Infrastructure tenders
- Proposed Construction of ICT HUB at Chepsigot ASS.Chiefs OfficeKeiyo South constituency · Kenya
- Proposed Construction of 4 Door Pit Latrine for Boys at Nakuse Primary SchoolDCC TURKANA SOUTH SUBCOUNTY · Kenya
- Civil Works — Cleaning of garbage/malba, internal alteration of wall , internal & external painting, PVC flooring and dressing nearby area of old CCN building for renting out to LIC HFL in T.E. campus at Motihari.BSNL — Bihar · India
- Replacement of 2 HP single phase Submersible pump motor set for Staff quarter at Mithanpura Muzaffarpur under Muzaffarpur BABSNL — Bihar · India
- Long Term Agreement (LTA) for Water Supply to UNIFIL Positions 2-45, 6-50, 6-52, 5-20 and 5-22 in South LebanonUnited Nations Procurement Division · Lebanon
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →