FreeTender
Accepting bidsgrantEuropean Union

PV based electrification of the economy: Designing & optimising PV systems supporting industrial electrification and promoting participation in electricity markets (EUPI-PV Partnership)

Issued by European Commission · via EU Funding & Tenders Portal

Published
13 Nov 2026
Closes
1 Dec 2027
Reference
HORIZON-CL5-2027-07-D3-17
Location
European Union
Sector
Energy & Power

At a glance

European Commission in European Union has published a funding call in energy & power: “PV based electrification of the economy: Designing & optimising PV systems supporting industrial electrification and promoting participation in electricity markets (EUPI-PV Partnership)”. Submissions close on 1 December 2027, 383 days from today. Quote reference HORIZON-CL5-2027-07-D3-17 in any correspondence with the buyer. FreeTender has recorded 422 notices from this buyer since 2026, 406 of them currently open. There are 18 open energy & power notices in European Union on FreeTender. Bids are submitted to the buyer through EU Funding & Tenders Portal, not through FreeTender.

Key requirements

Taken from the notice by FreeTender. The tender document on the official portal is binding — check it, and any corrigendum, before you bid.

To bid on EU public procurement

Most EU buyers ask for the European Single Procurement Document (ESPD) as a self-declaration with the bid. Submission is on the e-procurement platform named in the notice.

Details

Expected Outcome:

Large PV systems such as utility scale PV are evolving towards higher voltage architecture (>=3kV) with the objective to minimize losses and improve system efficiency at lower costs. The intention is to integrate also storage into such (hybrid) PV systems offering flexibility. It is consequently essential to build a blueprint for the implementation of high voltage large PV systems and the development of Direct Current (DC) networks around strategic end users for high voltage demand (industrial sites, servers, electric vehicle charging stations…). Understanding the factors that influence the performance and economics of these system architectures will help system planners evaluate the potential benefits of such hybrid resources that could support an increasing future industrial electrification. Another crucial challenge to address in ensuring the continued growth of new investments in solar PV, is the increasing occurrence of zero or negative prices in the electricity market, which dramatically hurt the profitability of operating solar PV assets. To tackle this challenge, PV participation to ancillary services is a way forward, which would reduce significantly system operating costs and PV curtailment and improve system reliability and PV profitability. The coupling/pooling with other generation assets or storage/demand assets is also to be considered. Project results are expected to contribute to all of the following expected outcomes as indicated for the proposed scope (high voltage DC PV systems or PV participation in electricity markets):

Scope 1: High-voltage DC PV systems:

  • Highly efficient PV systems, optimal utilisation of generated PV electricity, energy savings;
  • Decreased levelised cost of electricity (LCOE) and affordable electricity for industrial users.

Scope 2: PV participation in electricity markets:

  • Increased social profitability of PV by participation to ancillary services;
  • Energy efficient, cost competitive and flexible contribution of PV systems to the energy markets.

All proposals are expected to support the execution of the solar energy joint research and innovation agenda.

Scope:

Proposals are expected to cover at least one of the following scopes:

Scope 1: High-voltage DC PV systems:

  • Design higher voltage system architectures and evaluate the efficiency benefit;
  • Develop the blueprint for an AC (Alternating Current)/DC hybrid solution for managing end user loads, achieving high levels of efficiency;
  • Demonstrate a high voltage >3kV operating in DC grids for industrial installations hybrid system;
  • Investigate the impact of higher voltage on PV modules.

Scope 2: PV participation in electricity markets:

  • Demonstrate integrated management of PV generators for dynamic and/or nodal pricing;
  • Pool PV with other consumption/production assets to participate in balancing mechanisms; assess the viability of these systems and demonstrate business models and financing schemes;
  • Demonstrate reliability, procurement driven risk mitigation and better system availability through digitalization.

Whenever the expected exploitation of project results entails developing, creating, manufacturing and marketing a product or process, or in creating and providing a service, the plan for the exploitation and dissemination of results must include a strategy for such exploitation as well as a strong business case and sound exploitation strategy. The exploitation plan should include preliminary plans for scalability, commercialisation, and deployment (feasibility study, business plan) indicating the possible funding sources to be potentially used (in particular the Innovation Fund). This topic implements the co-programmed European Partnership for Innovation in Photovoltaics (EUPI-PV). As such, projects resulting from this topic will be expected to report on the results to the European Partnership for Innovation in Photovoltaics (EUPI-PV) in support of the monitoring of its KPIs. Technology Readiness Level - Technology readiness level expected from completed projects Activities are expected to achieve TRL 6-8 by the end of the project – see General Annex B. Activities may start at any TRL.

Submissions open on 04 August 2027.

Part of call HORIZON-CL5-2027-07

Type of action: HORIZON Innovation Actions

Programme period: 2021 - 2027

Priorities: AI, RePowerEU, DigitalAgenda, PART-COPROGR

"> General conditions

1. Admissibility Conditions: Proposal page limit and layout

described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes.

Proposal page limits and layout: described in Part B of the Application Form available in the Submission System.

2. Eligible Countries

described in Annex B of the Work Programme General Annexes. A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide .

3. Other Eligible Conditions

In line with the “ restriction on control in innovation actions in critical technology areas ” delineated in General Annex B of the General Annexes, entities established in an eligible country but which are directly or indirectly controlled by China or by a legal entity established in China are not eligible to participate in the action.

If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).

described in Annex B of the Work Programme General Annexes.

4. Financial and operational capacity and exclusion

described in Annex C of the Work Programme General Annexes.

5a. Evaluation and award: Award criteria, scoring and thresholds

are described in

Context for bidders

We hold 422 notices from European Commission, going back to August 2026 — 406 of them still open. They buy mostly in IT & Telecom, Water & Environment and Healthcare & Pharma. There are 18 open Energy & Power tenders in European Union. This one closes in 383 days.

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this energy & power opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Energy & Power tenders

All Energy & Power tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →