FreeTender
Accepting bidstenderUnited Kingdom

Proactive Replacement of Streetlighting - Winscombe

Issued by Winscombe and Sandford Parish Council · via UK Find a Tender Service

Published
3 Nov 2026
Closes
30 Nov 2026, 12:00 UTC
Value
GBP 8,400
Reference
ocds-h6vhtk-0796e9
Location
United Kingdom
Sector
Energy & Power
Type
goods

At a glance

Winscombe and Sandford Parish Council in United Kingdom has published a tender in energy & power: “Proactive Replacement of Streetlighting - Winscombe”. Submissions close on 30 November 2026, 26 days from today. The stated value is GBP 8,400. Quote reference ocds-h6vhtk-0796e9 in any correspondence with the buyer. One document is attached to this notice. There are 120 open energy & power notices in United Kingdom on FreeTender. Bids are submitted to the buyer through UK Find a Tender Service, not through FreeTender.

Details

1. Short Description / Scope of Works

The Contracting Authority is seeking expressions of interest for a comprehensive "source and erect" contract to execute the proactive replacement of 10 streetlighting units across designated locations in Winscombe, North Somerset. The successful contractor will be responsible for the decommissioning and safe disposal of existing assets, the supply of all specified components (luminaire, photo-electrical control unit, columns, and bracket arms), and the complete mechanical installation and erection of the new assemblies. All physical civil works, structural installations, and equipment supply fall under this contract scope. All specialized, live electrical grid interventions directly involving the Distribution Network Operator (DNO) network must be priced entirely separately as a distinct, unbundled cost element.

2. Technical Specifications

Bidders must source and install components meeting or exceeding the following criteria:

  • Luminaires: DW Windsor Kirium Pro 1 (or a fully certified technical equivalent offering matching lumens, optical distribution, and energy-efficiency profiles).
  • Control Systems: Integrated Part-Night photoelectric control cells (PECUs) designed to automatically calibrate energy-saving dimmed or off schedules during designated off-peak overnight windows.
  • Physical Supporting Infrastructure: Supply and installation must accommodate varying structural constraints per asset location, requiring:
  • Galvanised steel columns
  • Wooden pole mountings/interfaces
  • Outreach bracket arms

3. Specific Asset Locations

Works are strictly restricted to the following 10 structural assets situated within the BS25 area: Location Asset / Column Identifiers Quantity Church Road, Winscombe C1, C2, C4, C5, C6, C7, C8, C9, C10 (9 Units) The Square, Winscombe C1 (1 Unit)

4. Exclusion of Live DNO Works (Pricing Clarification)

For the avoidance of doubt, any physical electrical connection, disconnection, transfer, or contestable/non-contestable grid works required from the regional Distribution Network Operator (National Grid Electricity Distribution) must be itemised individually. Contractors must present all specialized DNO-specific line items quoted separately within their commercial submission. The main evaluation will distinguish core delivery costs from localized statutory utility fees.

Context for bidders

There are 120 open Energy & Power tenders in United Kingdom. This one closes in 26 days.

Documents

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this energy & power opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Energy & Power tenders

All Energy & Power tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →