Efficient energy input from renewable sources and energy management in the process industries (IA) (Processes4Planet and Innovative Advanced Materials for the EU partnerships)
Issued by European Commission · via EU Funding & Tenders Portal
- Published
- 3 Oct 2026
- Closes
- 2 Feb 2027
- Reference
- HORIZON-CL4-2027-02-MAT-PROD-32-two-stage
- Location
- European Union
- Sector
- Energy & Power
Details
Expected Outcome:
- A significant decarbonisation of processes (measured by the reduction of GHG emissions from the overall system) with broad applicability and economic viability.
- Facilitation of the transition from fossil-based energy inputs for: • low/medium thermal energy demands by introducing renewable-based alternatives and heat upgrading.
- High-temperature processes, by innovative technologies for electrified and hybrid high-temperature processes, high temperature energy storage.
- Clean energy usage is given a boost through innovative advanced materials, system concepts and technologies for energy integration and energy storage, supporting resilience against energy supply variations
- Combination of significant energy savings and integrated management of energy systems and production processes
Scope:
Most processes in the process industries require significant energy inputs which currently lead to substantial GHG (greenhouse gas) emissions by the process industries. The reduction of the CO2 footprint can be achieved by several measures, e.g. electrification or use of other renewable sources of energy, lowering of the energy demand, increasing energy efficiency, and energy integration. This topic aims to lead to significant steps in reducing the CO2 footprint by technological innovations, at least by 20%. A key problem in the use of renewable energy sources is their fluctuation over time. Projects should take this into account and develop solutions that aim for energy efficiency and include novel storage technologies of relevance to the process industries. Pure demand-side management by production schedules adapted to the supply of electricity from renewable sources is not within the scope of the call. In situations where full electrification is not feasible or competitive in the foreseeable future, sustainable hybrid solutions play a crucial role. These solutions enhance flexibility, allowing industries to manage the variability in the availability of affordable renewable electricity, which is expected to fluctuate significantly in the medium term. E.g., preheating processes can utilize fossil-free energy sources such as solar heat, geothermal heat, heat pumps, resistive or induction heating, and electric boilers. This initial stage can be followed by further heating using fossil-based methods initially, and later transitioning to renewable-based combustion processes to achieve the required process temperatures. To enhance resilience, the capture, storage, and management of energy flows should be tailored to the needs of the process industry. This may include research and innovation in safe and sustainable innovative advanced materials for (latent or sensible) energy storage, e.g. phase change materials and heat storage via chemical energy carriers beyond E-fuels. Proposals under this topic should address several of the following:
- Advancements in the use of energy from renewable sources in production processes with improved energy efficiency.
- Integrated energy systems with novel storage elements to enable a smooth operation of the plants despite variations in the availability of energy from renewable sources.
- Solutions for low/medium temperature (100 - 500 °C) energy inputs in energy intensive industries including hybrid solutions and a progressive reduction of the use of fossil carriers of energy.
- Solutions for high temperature (> 500 °C) energy inputs in energy intensive industries, including high temperature electricity driven processes, and high temperature energy storage.
- Application of high-performance insulation materials and new innovative advanced materials that can improve heat capture, storage, and retrieval, particularly for scalable high-temperature applications. Such materials should minimize the use of critical raw material, enabling effective recycling.
Projects should include demonstrations at pilot scale, preferably in real industrial environments, to validate the proposed technologies and processes under real-world industrial conditions Proposals related to innovative advanced materials development should address the most relevant gaps to focus on in the frame from materials design to technology deployment and ensure adequate feedback loops between different steps to drive forward innovative solutions which can be easily deployed. Scalability and requirements from application/industry need to be considered early on in the innovation process. The inclusion of a GHG avoidance methodology [1] is recommended and should provide detailed descriptions of baselines and projected emissions reduction. Proposals should include a business case and exploitation strategy, as outlined in the introduction to this Destination, underlining how the proposal will serve the purpose to boost industrial decarbonisation technologies supply chain in Europe. As project output an elaborated exploitation plan should be developed, including preliminary plans for scalability, commercialisation and deployment (feasibility study, business plan and financial model) indicating possible private and public funding sources (e.g. Innovation Fund, InvestEU and cohesion policy funds). Societal- and environmental impact as well as implications for the workplace (including skills and organisational change) should be outlined. This topic implements the co-programmed European partnerships Processes4Planet and Innovative Advanced Materials for the EU. Technology Readiness Level - Technology readiness level expected from completed projects Activities are expected to start at TRL 4-5 and achieve TRL 6-7 by the end of the project – see General Annex B.
[1] That could follow Innovation Fund methodology: https://ec.europa.eu/info/funding-tenders/opportunities/docs/2021-2027/innovfund/wp-call/2021/call-annex_c_innovfund-lsc-2021_en.pdf
Submissions open on 13 October 2026.
Part of call HORIZON-CL4-2027-02-two-stage
Type of action: HORIZON Innovation Actions
Programme period: 2021 - 2027
Priorities: PART-COPROGR, PART-COPROGR, DigitalAgenda, AI
"> General conditions
1. Admissibility Conditions: Proposal page limit and layout
Applicants submitting a proposal for a blind evaluation (see General Annex F) must not disclose their organisation names, acronyms, logos nor names of personnel in the proposal abstract and Part B of their first-stage application (see General Annex E).
In order to include a business case and exploitation strategy, as outlined in the introduction to Destination 'Leadership in materials and production for Europe', the page limit is exceptionally extended by 3 pages (for second-stage proposals).
described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes.
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System.
2. Eligible Countries
described in Annex B of the Work Programme General Annexes. A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide .
3. Other Eligible Conditions
described in Annex B of the Work Programme General Annexes.
4. Financial and operational capacity and exclusion
described in Annex C of the Work Programme General Annexes.
5a. Evaluation and award: Award criteria, scoring and thresholds
The first-stage proposals of this topic will be evaluated blindly.
are described in An
Context for bidders
We hold 353 notices from European Commission, going back to August 2026 — 350 of them still open. They buy mostly in Water & Environment, Forestry & Wildlife and IT & Telecom. There are 16 open Energy & Power tenders in European Union. This one closes in 122 days.
More from this buyer
- Expert network on Critical raw materials (CSA)· closes 2 Feb
- Open grounds for future pre-commercial procurement of innovative security technologies· closes 4 Nov
- Advancements in Direct Air Capture· closes 31 Mar
- Facilitate the engagement of European stakeholders in international digital standardisation (CSA)· closes 18 Mar
- Unleashing the potential of sustainable small-scale aquatic food production and recreational fisheries for prosperous local communities· closes 23 Sept
Similar Energy & Power tenders
- Advanced Distribution Management Systems (ADSM) for more efficient and flexible distribution grids· closes 1 Dec
- Innovative microgrids for improved energy system integration and efficiency in urban contexts· closes 7 Oct
- Co-funding Strategic Energy Technology (SET) Plan renewable fuel value chains at EU, national, regional, and local level· closes 31 Mar
- PV based electrification of the economy: Designing & optimising PV systems supporting industrial electrification and promoting participation in electricity markets (EUPI-PV Partnership)· closes 1 Dec
- Factory processes and automation for de- and re-manufacturing (RIA) (Made in Europe partnership)· closes 2 Feb
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this energy & power opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Energy & Power tenders
- Electrical Works — Replacement of Faulty Cables at Mini Sectratial , Ganeshgarh, SDCA Padampur & Shifting/ITC of DG sets at New Locations/Room at Chunawad ,Kaliyan in OA SriGanganagarBSNL — RAJASTHAN · India
- Electrical Works — Call basis Repairing/Servicing of Different Capacity DG Sets in Leased Out Sites under SDCA Lunkaransar, City, Khjauwala and Poogal in Bikaner OABSNL — RAJASTHAN · India
- Electrical Works — Shifting/Loading/Unloading & Installation & Commissioning & other misc Works of DG sets from BTS sites to Hub sites in OA NagaurBSNL — RAJASTHAN · India
- Electrical Works — Dismantling , Shifting and ITC of 15 KVA DG set in same campus at BTS site Jharia under OA ChuruBSNL — RAJASTHAN · India
- Electrical Works — Shifting of 50 KVA DG set from TE building Rarah including repairing and re-installation at TE Behror under BA AlwarBSNL — RAJASTHAN · India
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →