Advanced Distribution Management Systems (ADSM) for more efficient and flexible distribution grids
Issued by European Commission · via EU Funding & Tenders Portal
- Published
- 26 Sept 2026
- Closes
- 1 Dec 2027
- Reference
- HORIZON-CL5-2027-07-D3-26
- Location
- China
- Sector
- Energy & Power
Details
Expected Outcome:
Project results are expected to contribute to all the following expected outcomes:
- Enhanced reliability, resilience, controllability and efficiency of electricity distribution grids. Congestion in distribution grids is managed effectively;
- Distribution system operators (DSO) leverage modern digital solutions and employ improved systems to effectively manage their grids and improve interoperability with TSOs and other DSOs;
- Vendor-agnostic reference architectures, solutions and tools are developed to help advancing the ADSM design and operation and effectively manage a broad range of grid services.
Scope:
Projects are expected to address all the following items:
- Design and test innovative solutions, architectures, technologies and processes for advancing the way the ADSM are designed and operated;
- Provide ADSM software platforms that improve grid performance, controllability, and help integrating distributed energy resources (DERs) in an efficient way, while reducing congestion and improving grid flexibility;
- Advance forecasting solutions for energy supply, demand, and flexibility made available to the system operator; provide advanced analytics and visualisations;
- Advance interoperability, both with TSOs and other DSOs, as well as with the DERs at the edge of the grid;
- Leverage modern solutions, notably digital twins and artificial intelligence. Use security-by-design and advanced protection mechanisms against cyber threats. Use and/or develop, to the greatest extent possible, open-source software solutions and or software modules;
- Develop a manual and propose best practices on this matter to be used by other DSOs (including instructions to operate the system). Identify remaining gaps and further needs for research and development.
The demonstration, test and validation of the activities should be carried out in at least two pilots in different EU Member States or Associated Countries. Projects are expected to include at least three Distribution System Operators (DSOs) and at least two universities and/or research organisations. Additionally, collaboration is encouraged with the following entities:
- at least one supplier of technology and solutions for ADMS;
- at least one transmission system operator, which manage grids that are connected to the grids operated by any of the DSOs that are partners in the project;
- (at least) one project funded under the separate call ‘Advanced TSO control rooms to enhance grid control and resilience’ with the view to strengthen TSO-DSO coordination and support interoperable solutions. To that end, the project proposals are expected to describe a credible mechanism to do so.
This collaboration (minimum number of entities) is sought per project in total and does not necessarily apply per each pilot in particular. Selected projects are expected to contribute to the BRIDGE initiative [1] and actively participate in its activities. null Activities are expected to achieve TRL 6-8 by the end of the project – see General Annex B. Activities may start at any TRL.
[1] https: //bridge-smart-grid-storage-systems-digital-projects.ec.europa.eu/
Submissions open on 04 August 2027.
Part of call HORIZON-CL5-2027-07
Type of action: HORIZON Innovation Actions
Programme period: 2021 - 2027
Priorities: RePowerEU, DigitalAgenda, AI
"> General conditions
1. Admissibility Conditions: Proposal page limit and layout
described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes.
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System.
2. Eligible Countries
described in Annex B of the Work Programme General Annexes. A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide .
3. Other Eligible Conditions
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).
In line with the “ restriction on control in innovation actions in critical technology areas ” delineated in General Annex B of the General Annexes, entities established in an eligible country but which are directly or indirectly controlled by China or by a legal entity established in China are not eligible to participate in the action.
Subject to restrictions for the protection of European communication networks.
described in Annex B of the Work Programme General Annexes.
4. Financial and operational capacity and exclusion
described in Annex C of the Work Programme General Annexes.
5
Context for bidders
We hold 219 notices from European Commission, going back to August 2026 — 219 of them still open. They buy mostly in Water & Environment, Healthcare & Pharma and IT & Telecom. There are 38 open Energy & Power tenders in China. This one closes in 431 days.
More from this buyer
- European Partnership for Pandemic Preparedness (Phase 2)· closes 13 Apr
- Portable and versatile Point-of-care diagnostics· closes 13 Apr
- Support a Young Cancer Survivor Quality of Life (QoL) research programme by cancer charities and funding agencies· closes 21 Sept
- Hydrogen cities· closes 7 Oct
- ERA Fellowships· closes 8 Sept
Similar Energy & Power tenders
- Advanced TSO control rooms to enhance grid observability, stability and resilience· closes 1 Dec
- 中南财经政法大学首义校区校舍及配套基础设施修缮项目(一期)工程总承包标段一(电力改造)资审文件公告· closes 10 Oct
- 中国民用航空华北地区空中交通管理局内蒙古分局民航内蒙古空管供电外包服务项目公开招标公告(三次)· closes 14 Oct
- 浙江大学配电与管控单元公开招标公告· closes 15 Oct
- 某某单位发电机设备类采购项目公开招标公告· closes 16 Oct
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this energy & power opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Energy & Power tenders
- Electrical Works — Repairing of 16/25 KVA Transformer for different location of BTS /TE under Darbhanga BA .BSNL — Bihar · India
- Electrical Works — Repairing of 16/25 KVA Transformer for different location of BTS /TE under Muzaffarpur BA .BSNL — Bihar · India
- Interlinking 11 KV line from padoor high school AB to Idiyanchira AB Strengthning work under Electrical Section VenkidanguKerala State Electricity Board · Chief Engineer (Distribution Central) · Dpty Chief Engg Electrical Circle Thrissur · India
- Providing Labour for Various Work For BEC-CR-04 Rig Machine Work in Mech. Sub Division Dindori (2nd Call)Public Health Engineering- O/o Engineer In Chief · Chief Engineer E and M - PHED · Executive Engineer-E and M Jabalpur - PHED · India
- Providing Fitting Replacement of existing machinery with New Submersible Pumpset Voltage Stabilizer and Electric Control Panel at Tubewell Pindi Patha A1I and FC · CE- I and FC Jammu · HYD Circle Jammu · T.W.I.D Jammu · India
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →