Advanced TSO control rooms to enhance grid observability, stability and resilience
Issued by European Commission · via EU Funding & Tenders Portal
- Published
- 14 Nov 2026
- Closes
- 1 Dec 2027
- Reference
- HORIZON-CL5-2027-07-D3-25
- Location
- European Union
- Sector
- Energy & Power
At a glance
European Commission in European Union has published a funding call in energy & power: “Advanced TSO control rooms to enhance grid observability, stability and resilience”. Submissions close on 1 December 2027, 382 days from today. Quote reference HORIZON-CL5-2027-07-D3-25 in any correspondence with the buyer. FreeTender has recorded 423 notices from this buyer since 2026, 407 of them currently open. There are 17 open energy & power notices in European Union on FreeTender. Bids are submitted to the buyer through EU Funding & Tenders Portal, not through FreeTender.
Key requirements
Taken from the notice by FreeTender. The tender document on the official portal is binding — check it, and any corrigendum, before you bid.
To bid on EU public procurement
Most EU buyers ask for the European Single Procurement Document (ESPD) as a self-declaration with the bid. Submission is on the e-procurement platform named in the notice.
Details
Expected Outcome:
Project results are expected to contribute to all the following expected outcomes:
- Enhanced reliability, resilience, and efficiency of electricity transmission grids. Grid congestion is managed efficiently;
- Enhanced observability of grids and improved forecasting of supply, demand, grid capacity availability, and flexibility;
- Transmission system operators (TSO) leverage modern digital solutions and employ improved systems to effectively manage their grids and improve interoperability with other TSOs;
- Vendor-agnostic reference architectures, solutions and tools are developed to help advancing the TSO control room design and operation.
Scope:
Projects are expected to address all the following items:
- Design and test innovative solutions, technologies and processes for advancing the way the TSO control rooms are designed and operated, increasing observability and entailing enhanced support for the operators, providing more automation and enhanced support for decision, faster response times and less room for error. The solutions are expected to incorporate both hardware and software aspects;
- Analyse and include, as far as possible, solutions for Wide Area Monitoring Systems (WAMS) to extend the real-time monitoring and control capabilities over large areas, while coping with the decentralisation and increased complexity of the system;
- The novel solutions are expected to help the operators to manage better grid congestion and incorporate more renewables while reducing curtailment. The solutions will facilitate data-driven grid operations, capitalising on real-time analytics and data from smart assets. The solutions may include preparation, recovery and/or restoration from incidents (including extreme weather events);
- Help the grid operators to update their operational tools in light of the deep transformation of the grids, notably the distributed nature of generation. May include the option to de-centralise the control for increasing the resilience of decision-making;
- Advance forecasting solutions for energy supply, demand and flexibility made available to the system operator, need for ancillary services, as well as for grid hosting capacity; provide advanced analytics and visualisations;
- Develop interoperability between the control rooms of different TSOs (and using different vendor solutions) to secure seamless data exchanges and coordination. Develop interoperability between the TSO control rooms and other entities connected to the transmission grids, including the adjacent DSOs.
- Leverage modern solutions, notably digital twins and artificial intelligence. Use security-by-design and advanced protection mechanisms against cyber threats. Use and/or develop, to the greatest extent possible, open-source software solutions and or software modules;
- Develop a manual and propose best practices on this matter to be used by other TSOs (including operation instructions). Identify remaining gaps and further needs for research and development.
The demonstration, test and validation of the activities should be carried out in at least two pilots in different EU Member States or Associated Countries. Projects are expected to include at least two electricity Transmission System Operators (TSOs) and at least two universities and/or research organisations. Additionally, collaboration is encouraged with the following entities and projects:
- at least one supplier of technology and solutions for TSO control rooms;
- at least two distribution system operators, which manage grids that are connected to the grids operated by any of the TSOs that are partners in the project;
- (at least) one project funded under the separate call ‘Advanced Distribution Management Systems (ADSM) for more efficient and flexible distribution grids’ with the view to strengthen TSO-DSO coordination and support interoperable solutions. To that end, the project proposals are expected to describe a credible mechanism to do so.
This collaboration (minimum number of entities) is sought per project in total and does not necessarily apply per each pilot in particular. Selected projects are expected to contribute to the BRIDGE initiative [1] and actively participate in its activities. Technology Readiness Level - Technology readiness level expected from completed projects Activities are expected to achieve TRL 6-8 by the end of the project – see General Annex B. Activities may start at any TRL.
[1] https: //bridge-smart-grid-storage-systems-digital-projects.ec.europa.eu/
Submissions open on 04 August 2027.
Part of call HORIZON-CL5-2027-07
Type of action: HORIZON Innovation Actions
Programme period: 2021 - 2027
Priorities: AI, RePowerEU, DigitalAgenda
"> General conditions
1. Admissibility Conditions: Proposal page limit and layout
described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes.
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System.
2. Eligible Countries
described in Annex B of the Work Programme General Annexes. A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide .
3. Other Eligible Conditions
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).
In line with the “ restriction on control in innovation actions in critical technology areas ” delineated in General Annex B of the General Annexes, entities established in an eligible country but which are directly or indirectly controlled by China or by a legal entity established in China are not eligible to participate in the action.
described in Annex B of the Work Programme General Annexes.
4. Financial and operational capacity and exclusion
described in Annex C of the Work Programme General Annexes.
5a. Evaluation and award: Award criteria, scoring and thresholds
are described in
Context for bidders
We hold 423 notices from European Commission, going back to August 2026 — 407 of them still open. They buy mostly in IT & Telecom, Water & Environment and Healthcare & Pharma. There are 17 open Energy & Power tenders in European Union. This one closes in 382 days.
More from this buyer
- The impact of EU labour mobility on the Member States of the EU· closes 23 Sept
- Inclusive and climate resilient multimodal passenger hubs enhancing modal shift towards sustainable transport and shared mobility· closes 7 Oct
- Advancing interdisciplinary, data-driven research at the biodiversity- health interface under a One Health approach· closes 16 Sept
- Assessing the effect of airport operations on air quality and noise in nearby communities· closes 14 Apr
- Higher Voltage, Megawatt Charging System compatible, modular powertrain for Heavy Duty Vehicles (HDV) (2ZERO Partnership)· closes 14 Apr
Similar Energy & Power tenders
- Production technologies for solar photovoltaics beyond the state-of-the-art (EUPI-PV Partnership)· closes 31 Mar
- Key enabling technologies for fusion power plants (European Partnership on Fusion Energy)· closes 4 Nov
- Innovative microgrids for improved energy system integration and efficiency in urban contexts· closes 7 Oct
- Novel approaches towards next-generation battery concepts, leveraging the enabling role of innovative advanced materials (BATT4EU and IAM4EU Partnerships)· closes 14 Apr
- Demonstration of hydropower technologies for efficient and forward-looking refurbishment of existing hydropower plants· closes 1 Dec
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this energy & power opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Energy & Power tenders
- кВ и КТПС 63_6_0,4 кВ_ТелевеемМеждународная компания Акционерное общество "АРЕАЛ" · Russia
- Оказание услуг и (или) выполнение работ по капитальному ремонту общего имущества многоквартирных домов, расположенных по адресам: Кемеровская область-Кузбасс, г. Осинники, ул. Советская, д. 12 (теплоснабжение, водоснабжение), ул. Победы, д. 23 (подвальное помещение), ул. Победы, д.41 (теплоснабжение), ул. Победы, д. 35 (водоснабжение, водоотведение), ул. Студенческая, д. 26 (теплоснабжение, водоснМУНИЦИПАЛЬНОЕ КАЗЕННОЕ УЧРЕЖДЕНИЕ "ЖИЛИЩНО-КОММУНАЛЬНОЕ УПРАВЛЕНИЕ" · Russia
- выполнение работ по оценке технического состояния, разработке проектной документации и капитальному ремонту общего имущества (система теплоснабжения) многоквартирного дома, расположенного по адресу: Магаданская область, г. Магадан, пр. Карла Маркса, д. 13НЕКОММЕРЧЕСКАЯ ОРГАНИЗАЦИЯ "ФОНД КАПИТАЛЬНОГО РЕМОНТА МАГАДАНСКОЙ ОБЛАСТИ" · Russia
- 1219-26/ЭМ на поставку электроматериаловФЕДЕРАЛЬНОЕ ГОСУДАРСТВЕННОЕ АВТОНОМНОЕ ОБРАЗОВАТЕЛЬНОЕ УЧРЕЖДЕНИЕ ВЫСШЕГО ОБРАЗОВАНИЯ "СИБИРСКИЙ ФЕДЕРАЛЬНЫЙ УНИВЕРСИТЕТ" · Russia
- Услуги по энергоснабжению электрической энергиейГОСУДАРСТВЕННОЕ КАЗЕННОЕ УЧРЕЖДЕНИЕ "ОБЪЕДИНЕННЫЙ ВЕДОМСТВЕННЫЙ АРХИВ МИНИСТЕРСТВА ОБРАЗОВАНИЯ СТАВРОПОЛЬСКОГО КРАЯ" · Russia
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →