FreeTender
Accepting bidseoiBelize

Consultancy for the development of a transmission expansion planning framework for Belize and support for updating the current transmission expansion plan

Issued by Inter-American Development Bank (IDB) · via IDB — BID for the Americas (Inter-American Development Bank)

Published
2 Oct 2026
Closes
15 Oct 2026, 02:59 UTC
Value
USD 150,000
Reference
RG-T4927
Location
Belize
Sector
Energy & Power

Details

The Inter-American Development Bank (IDB), in coordination with Belize Electricity Limited (BEL) and national energy sector stakeholders, invites consulting firms to submit proposals to design an institutionalized transmission expansion planning framework and support the collaborative update of the transmission component of the Least Cost Expansion Plan (LCEP).

1. Framework design & capacity building

Standardized planning framework: Establish a repeatable, data-driven methodology, process flow diagram, governance structure, and data-reporting templates to formalize long-term network planning across sector entities.

Software & tool assessment: Evaluate power system modeling software and licensing needs—using BEL’s current platform (ETAP) as a baseline—covering steady-state, dynamic, short-circuit, and production cost simulations.

Technical training program: Deliver a comprehensive 120-hour training program for approximately 20 sector participants (with a core group of 10 completing hands-on modeling modules), featuring at least 50% in-person practical workshops in Belize.

2. Least Cost Expansion Plan (LCEP) update & grid studies

Baseline diagnosis & load forecast: Evaluate 5-year historical performance data (voltage, losses, N-1 violations) and construct a 20-year national and substation-level hourly demand forecast with high, base, and low scenario bands.

Generation scenarios & network studies: Conduct load flow, contingency (N-1), reactive compensation, short-circuit, and dynamic stability studies across the 115 kV and 69 kV grids, assessing generation siting, renewable integration, and scenarios with reduced Mexico interconnection capacity.

Project identification & techno-economic analysis: Evaluate structural, operational, and non-network alternatives to address identified grid constraints, using multi-criteria decision analysis and cost-benefit evaluations.

3. Optimal portfolio & model deliverables

Investment roadmap: Develop an optimal, prioritized portfolio of transmission expansion projects complete with annual capital profiles, implementation timelines, and climate resilience considerations.

Native & neutral model sets: Deliver fully validated power system models for steady-state, dynamic, short-circuit, and production cost cases in both the native software format and a neutral exchange format.

Note: Interested consulting firms must review the requirements on the BEO Bidders Portal.

Executing unit: Inter-American Development Bank (IDB)

IDB project: RG-T4927

Contact: [contact details removed]

Financed by the Inter-American Development Bank (IDB).

Context for bidders

We hold 77 notices from Inter-American Development Bank (IDB), going back to August 2026 — 24 of them still open. They buy mostly in Financial & Professional Services, Water & Environment and Education & Training. There are 4 open Energy & Power tenders in Belize. This one closes in 13 days.

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this energy & power opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Energy & Power tenders

All Energy & Power tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →