Design, Supply, Installation, and Commissioning of 45MW/180MWh Battery Energy Storage Systems (BESS) including Associated Civil Works and Initial Operations and Maintenance
Issued by Ministry of Finance, Central Executing Unit · via World Bank — Procurement Notices
- Published
- 24 Sept 2026
- Closes
- 23 Nov 2026
- Reference
- BZ-MFEDI - CEU-539302-CW-RFB
- Location
- Belize
- Sector
- Energy & Power
- Type
- works
At a glance
Ministry of Finance, Central Executing Unit in Belize has published a tender in energy & power: “Design, Supply, Installation, and Commissioning of 45MW/180MWh Battery Energy Storage Systems (BESS) including Associated Civil Works and Initial Operations and Maintenance”. Submissions close on 23 November 2026, 13 days from today. Quote reference BZ-MFEDI - CEU-539302-CW-RFB in any correspondence with the buyer. There are 2 open energy & power notices in Belize on FreeTender. Bids are submitted to the buyer through World Bank — Procurement Notices, not through FreeTender.
Key requirements
Taken from the notice by FreeTender. The tender document on the official portal is binding — check it, and any corrigendum, before you bid.
To bid on World Bank-financed
The borrower runs the procurement under the World Bank Procurement Regulations; eligibility and documents are in the borrower's bidding document, not on the World Bank site.
Details
REQUEST FOR BIDS (PLANT DESIGN, SUPPLY AND INSTALLATION) Design, Supply, Installation, Testing, Commissioning and 3-Year Operations & Maintenance of Four (4) Grid-Scale Battery Energy Storage Systems
Institution: Government of Belize through the Ministry of Finance
Country: Belize
Project: Belize Reliant and Resilient Energy Systems (BRRES) Project
Process ID: BZ-MFEDI - CEU-539302-CW-RFB
Bid Submission Deadline: November 23, 2026; 3:00 p.m. (Local Belize Time)
The Government of Belize has received financing from the World Bank toward the cost of the BRRES Project and intends to apply part of the proceeds toward payments under the Contract for the Design, Supply, Installation, Testing, Commissioning, and 3-Year Operations & Maintenance of Four Independent Battery Energy Storage Systems at Belize Electricity Ltd. substation sites in Westlake, Belize District; Dangriga, Stann Creek District; Buena Vista, Corozal District; and San Pedro, Ambergris Caye. This will strengthen the country’s electricity infrastructure through the integration of 40 MW of battery energy storage. This investment will support the future adoption of renewable energy, enhance grid resilience to extreme weather events, and provide technical assistance for system optimization. The Government of Belize now invites sealed Bids from eligible Bidders for the complete turnkey design, supply, installation, testing, commissioning, and 3-year O&M of four grid-forming/grid-following BESS facilities with the following minimum capacities: Westlake (10.8 MW / 43.2 MWh, 22 kV interconnection); Dangriga (10.8 MW / 43.2 MWh, 22 kV interconnection); Buena Vista (10.8 MW / 43.2 MWh, 34.5 kV interconnection); San Pedro (12.7 MW / 50.8 MWh, 34.5 kV interconnection).
Bidding will be conducted through international competitive procurement using a Request for Bids (RFB) as specified in the World Bank’s “Procurement Regulations for IPF Borrowers” (Fifth Edition, September 2023) (“Procurement Regulations”) and is open to all eligible Bidders as defined in the Procurement Regulations. Bids will be evaluated in accordance with the evaluation process set out in the bidding documents. The following weightings shall apply for the rated criteria: Technical factors: 65% and Bid Price: 35%. Interested, eligible Bidders may obtain further information from the Central Executing Unit, Ministry of Finance, and inspect the bidding document during office hours (8:30 a.m. to 4:30 p.m.) at the address given below. The bidding document in English may be obtained free of charge by interested eligible Bidders upon submission of a completed Bid Document Registration Form which may be found at https://procurement.gov.bz/mof-ceu-request-for-expressions-of-interest-design-supply-installation-testing-commissioning-and-3-year-operations-maintenance-of-four-4-grid-scale-battery-energy-storage-syste/. The registration form must include the Bidder’s full legal name, registration details, contact person, email address, and telephone number. The document will be made available for download through the secure link after verification. Bids must be delivered to the address below on or before 3:00 p.m. Local Belize time on Monday, November 23, 2026. Electronic bidding will not be permitted. Late Bids will be rejected. The outer Bid envelopes marked REF: BESS Batteries - BRRES - [Firm’s Name] “ORIGINAL BID”, and the inner envelopes marked “TECHNICAL PART” will be publicly opened in the presence of the Bidders’ designated representatives and anyone who chooses to attend, at the address below on Monday, November 23, 2026, at 3:30 p.m. Local Belize time at the Ministry of Finance Conference Room, 2nd Floor Sir Edney Cain Building, Belmopan, Cayo District, Belize. All envelopes marked “FINANCIAL PART” shall remain unopened and will be held in safe custody of the Employer until the second public Bid opening. All Bids must be accompanied by a Bid-Securing Declaration. Attention is drawn to the Procurement Regulations requiring the Borrower to disclose information on the successful bidder’s beneficial ownership, as part of the Contract Award Notice, using the Beneficial Ownership Disclosure Form as included in the bidding document. The Government of Belize reserves the right to cancel procurement activity, in whole or in part, without assigning any reason, and will not be liable for any costs applicants incur in preparing and submitting their Bid.
ATTN: [contact details removed]
Procurement Specialist Central Executing Unit Ministry of Finance Sir Edney Cain Building, 2nd Floor, Belmopan City, Belize, Central America
Email: [contact details removed], procurement@ceu.mof.gov.bz
Ref: BESS Batteries - BRRES - [Firm’s Name] “ORIGINAL BID”
Context for bidders
There are 2 open Energy & Power tenders in Belize. This one closes in 13 days.
Similar Energy & Power tenders
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this energy & power opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Energy & Power tenders
- Кемеровская область – Кузбасс, г. Кемерово, ул. Николая Островского, д. 26, пр-т. Ленина, д. 105а, ул. Кирова, д. 18, пр-т. Ленина, д. 111, д. 95, д. 97 (капитальный ремонт водоотведения, водоснабжения, теплоснабжения)МУНИЦИПАЛЬНОЕ БЮДЖЕТНОЕ УЧРЕЖДЕНИЕ "ЖИЛКОМЦЕНТР" · Russia
- AST MVHRs, Solar PV & EICR Electrical TestingStonewater Limited · United Kingdom
- Installation of Two (2) Outdoor Diesel Generator Sets at Barrie Fire and Emergency Services HeadquartersCity of Barrie · Canada
- Коммунальные услуги по теплоснабжениюОТДЕЛ ГФС РОССИИ В Г. ИВАНОВО · Russia
- Emergency generator fuel system upgrades (Group 3) at various locations throughout the Region of DurhamRegion of Durham · Canada
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →