This tender closed on 23 October 2026 — kept here for reference.
Bids are no longer accepted. Scroll down for this buyer's record and what they have open now, or browse Manufacturing & Supply tenders · latest notices worldwide
USS MAKIN ISLAND (LHD-8), Ships Service Diesel Generators (SSDGs) Long Lead Time Material (LLTM) Direct Item Replacements
Issued by DEPT OF DEFENSE · DEPT OF THE NAVY · NAVSEA · REGIONAL MAINTENANCE CENTER · SOUTHWEST REGIONAL MAINT CENTER · via SAM.gov — US federal contract opportunities
- Published
- 20 Oct 2026
- Closed
- 23 Oct 2026, 21:00 UTC
- Reference
- N5523626R0013
- Location
- CA, United States
- Sector
- Manufacturing & Supply
This notice was amended
Details changed after publication. Re-check the official notice before bidding.
- Submission deadline changed from 9 Sept 2026, 21:00 UTC to 23 Oct 2026, 21:00 UTCFirst seen by FreeTender on 21 Oct 2026 — most portals don’t publish when a corrigendum was issued.
At a glance
DEPT OF DEFENSE · DEPT OF THE NAVY · NAVSEA · REGIONAL MAINTENANCE CENTER · SOUTHWEST REGIONAL MAINT CENTER in United States has published a tender in manufacturing & supply: “USS MAKIN ISLAND (LHD-8), Ships Service Diesel Generators (SSDGs) Long Lead Time Material (LLTM) Direct Item Replacements”. The deadline passed on 23 October 2026. Quote reference N5523626R0013 in any correspondence with the buyer. FreeTender has recorded 10 notices from this buyer since 2026, 2 of them currently open. There are 3,106 open manufacturing & supply notices in United States on FreeTender. Bids are submitted to the buyer through SAM.gov — US federal contract opportunities, not through FreeTender.
Key requirements
Taken from the notice by FreeTender. The tender document on the official portal is binding — check it, and any corrigendum, before you bid.
To bid on SAM.gov (US federal)
You need an active SAM.gov entity registration with a Unique Entity ID (UEI) to be awarded a federal contract. Check the set-aside and NAICS size standard before you respond.
Details
DEPT OF DEFENSE · DEPT OF THE NAVY · NAVSEA · REGIONAL MAINTENANCE CENTER · SOUTHWEST REGIONAL MAINT CENTER is soliciting USS MAKIN ISLAND (LHD-8), Ships Service Diesel Generators (SSDGs) Long Lead Time Material (LLTM) Direct Item Replacements. Solicitation number N5523626R0013. Classified under NAICS 333618 — Other Engine Equipment Manufacturing. Product/service code 2815 — DIESEL ENGINES AND COMPONENTS. Place of performance: CA, USA. Responses are due by 23 October 2026 21:00 UTC. Posted on SAM.gov, the US federal contract opportunities system; registration is required to bid.
Amendment 0001. The purpose of this Amendment is as follows: a. Provide an extension to the COMSS due date to 23 October 2026, by 2:00 PM (Pacific). b. Provide updated Product Description (PD) REV 1. All omitted items from past PDs have been removed. Please see attached PD. ________________________________________________________________________________________________________ This is a Combined Synopsis/Solicitation for commercial products prepared in accordance with the format in RFO FAR Part 12. This announcement constitutes the only solicitation. A proposal is being requested from only one source. Request for Proposal (RFP) N5523626R0013 is issued as a sole source procurement. The subject solicitation is being processed in accordance with RFO FAR Part 12. The Government intends to solicit and contract with only one source, Fairbanks Morse Defense (referred to herein as “FMD”) for the parts listed on the Product Description (Attachment J-1), under the authority of RFO FAR 12.102 on a sole source basis. This notice of intent is not a request for competitive proposals. Determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. The applicable North American Industry Classification System (NAICS) code is 333618 – Other Engine Equipment Manufacturing. This solicitation documents and incorporates provisions and clauses that are those in effect through Federal Acquisition Circular 2026-01 (Effective 02 July 2026) and DFARS Publication Notice 20260702. The assigned Defense Priorities and Allocations Systems (DPAS) rating is DO-A3. DESCRIPTION: Southwest Regional Maintenance Center (SWRMC) requires the expedited procurement of Ships Service Diesel Generators (SSDG) direct replacement parts for six (6) generators, the direct replacement parts consist of 725 different parts necessary for the SSDG repairs in support of this LHD Wasp-class amphibious assault ship. This long lead time material (LLTM) must be purchased directly from the original equipment manufacturer (OEM) which is identified as FMD. SEE PRODUCT DESCRIPTION (see Attachment J-1). SENSITIVE ACTIVITY AND INTELLIGENCE-RELATED CONTRACTING (SAIRC) AND OPERATIONS SECURITY (OPSEC) STATEMENT This contracting action has been reviewed against the requirement of SECNAVINST S4200.35. SAIRC protections are not required. The following PROVISIONS AND CLAUSES apply to this acquisition and will be incorporated into any resultant purchase or delivery order; NAVSEA clauses are provided as Attachment J-2. 52.203-6 Restrictions on Subcontractor Sales to the Government (JUN 2020) 52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions (SEP 2024) 52.204-7 System for Award Management (NOV 2024) 52.204-10 Reporting Executive compensation and First-Tier Subcontract Awards (JUN 2020) 52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-27 Prohibition on a ByteDance Covered Application (JUN 2023)) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (JAN 2025) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under and Federal Law (FEB 2016) 52.212-4 Contract Terms and Conditions--Commercial Items (NOV 2023) 52.219-8 Utilization of Small Business Concerns (JAN 2025) 52.219-9 Small Business Subcontracting Plan (JAN 2025) 52.219-16 Liquidated Damages - Subcontracting Plan (DEC 2021) 52.219-28 Postaward Small Business Program Representation (JAN 2025) 52.219-33 Nonmanufacturer Rule (SEP 2021) 52.222-3 Convict Labor (JUN 2003) 52.222-19 Child Labor-Cooperation with Authorities and Remedies (JAN 2025) 52.222-35 Equal Opportunity for Veterans (JUN 2020) 52.222-36 Equal Opportunity for Workers with Disabilities (JUN 2020) 52.222-37 Employment Reports on Veterans (JUN 2020) 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) 52.222-50 Combating Trafficking in Persons (NOV 2021) 52.222-90 Addressing DEI Discrimination by Federal Contractors (MAY 2026) 52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (MAY 2024) 52.223-23 Sustainable Products and Services (MAR 2025) (DEVIATION 2025-O0004) 52.225-1 Buy American-Supplies (OCT 2022) 52.225-13 Restrictions on Certain Foreign Purchases (FEB 2021) 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (MAY 2024) 52.232-8 Discounts for Prompt Payment (FEB 2002) 52.232-9 Limitation on Withholding of Payments (APR 1984) 52.232-11 Extras (APR 1984) 52.232-17 Interest (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014) 52.232-25 Prompt Payment (JAN 2017) 52.232-30 Installment Payments for Commercial Products and Commercial Services (NOV 2021) 52.232-33 Payment by Electronic Funds Transfer-System for Award Management (OCT 2018) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.233-1 Disputes (MAY 2014) 52.233-3 Protest After Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.237-2 Protection of Government Buildings, Equipment, and Vegetation (APR 1984) 52.240-90 Security Prohibitions and Exclusions Representations and Certifications (DEC 2025) 52.240-91 Security Prohibitions and Exclusions (DEC 2025) 52.242-15 Stop-Work Order (AUG 1989) 52.242-17 Government Delay of Work (APR 1984) 52.242-13 Bankruptcy (JUL 1995) 52.243-1 Changes-Fixed-Price (AUG 1987) 52.244-5 Competition in Subcontracting (AUG 2024) 52.244-6 Subcontracts for Commercial Products and Commercial Services (OCT 2025) 52.246-16 Responsibilities for Supplies (APR 1984) 52.247-34 F.O.B. Destination (NOV 1991) 52.247-48 F.O.B. Destination-Evidence of Shipment (FEB 1999) 52.247-64 Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2021) 52.249-8 Default (Fixed-Price Supply and Service) (APR 1984) 52.252-2 Clauses Incorporated by Reference (FEB 1998) 52.252-6 Authorized Deviations in Clauses (NOV 2020) 52.253-1 Computer Generated Forms (JAN 1991) 252.203-7000 Requirements Relating to Compensation to Former DoD Officials (SEP 2011) 252.203-7002 Requirements to Inform Employees of Whistleblower Rights (DEC 2022) 252.203-7005 Representation Relating to Compensation of Former DoD Officials (SEP 2022) 252.204-7000 Disclosure of Information (OCT 2016) 252.204-7009 Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information (JAN 2023) 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting (MAY 2024) 252.204-7003 Control of Government Personnel Work Product (APR 1992) 252.204-7015 Notice of Authorized Disclosure of Information by Litigation Support (JAN 2023) 252.204-7016 Covered Defense Telecommunications Equipment or Services—Representation (DEC 2019) 252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services—Representation (May 2021) 252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services 252.204-7022 Expediting Contract Closeout (MAY 2021) 252.204-7024 Notice on the use of the Supplier Performance Risk System (FEB 2026) 252.205-7000 Provision of Information to Cooperative Agreement Holders (OCT 2024) 252.211-7003 Item Unique Identification and Valuation (JAN 2023) – FT 252.215-7013 Supplies and Services Provided by Nontraditional Defense Contractors (JAN 2023) 252.219-7996 Small Business Subcontracting Plan (DoD Contracts) (JAN 2026) 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials—Basic (SEP 2014) 252.223-7008 Prohibition of Hexavalent Chromium (JAN 2023) 252.225-7000 Buy American – Balance of Payments Program Certificate (FEB 2024) 252.225-7001 Buy American and Balance of Payment Program (FEB 2024) 252.225-7002 Qualifying Country Sources as Subcontractors (MAR 2022) 252.225-7013 Duty-Free Entry (AUG 2025) 252.225-7048 Export Controlled Items (JUN 2013) 252.225-7059 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region–Representation (JUN 2023) 252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region (JUN 2023) 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports (DEC 2018) 252.232-7006 Wide Area Work Flow Payment Instructions (JAN 2023) – FT 252.232-7010 Levies on Contract Payments (DEC 2006) 252.243-7001 Pricing of Contract Modifications (DEC 1991) 252.243-7002 Requests for Equitable Adjustment (DEC 2022) 252.244-7000 Subcontracts for Commercial Items (FEB 2026) 252.244-7999 Subcontracts for Commercial Products or Commercial Services(DEVIATION 2026-O0015) (JAN 2025) 252.246-7003 Notification of Potential Safety Issues (JAN 2023) 252.246-7007 Contractor Counterfeit Electronic Part Detection and Avoidance System (JAN 2023) 252.247-7023 Transportation on Supplies by Sea (OCT 2024) 52.212-1 Instructions to Offerors – Commercial Products and Commercial Services (SEP 2023) Offerors must comply with all instructions contained herein. (1) Offerors may submit written questions during the quote preparation period. All questions must be received no later than 05 September 2026 at 2:00 PM, San Diego local time to allow adequate time to prepare and issue responses to all offerors prior to the date and time set for receipt of quotes. Only written questions will receive a response. All questions and quotes shall be directed to: Southwest Regional Maintenance Center (SWRMC) – C410B Large Purchase
Email: Cite the solicitation number in the subject line - N5523626R0013
Email Addresses: kristin.j.liljestrom.civ@us.navy.mil, miramaje.c.brown.civ@us.navy.mil, Jorge.a.morales67.civ@us.navy.mil
(2) Small Business Subcontracting Plan: If the offeror is other than a small business concern, and the proposed contract exceeds the applicable threshold in FAR 19.109 and subcontracting possibilities exist, the offeror shall submit an acceptable subcontracting plan in accordance with FAR 52.219-9. Failure to submit and negotiate an acceptable subcontracting plan within the time specified by the Contracting Officer may render the offeror ineligible for award. 52.212-2 Evaluation Commercial Items, Evaluation – Commercial Products and Commercial Services (NOV 2021) (a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers: Evaluation Factors – The evaluation factors that shall be used are:
- Technical Acceptability – Ability to meet the required delivery date and the salient characteristics of the Product Description
- Price – Lowest price technically Acceptable (LPTA)
Price: The Government shall evaluate the proposed price for reasonableness in accordance with RFO FAR 12.203
A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award. (End of provision) 52.212-4 Contract Terms and Conditions -- Commercial Products and Commercial Services NOV 2023 Standard Commercial Warranties apply.
APPLICABLE PROVISIONS AND CLAUSES:
The FAR requires the use of the System for Award Management (SAM) in Federal solicitations as a part of the offer submission process to satisfy FAR 52.212-4. More information on SAM is found at https://www.sam.gov/portal/public/SAM/. PACKAGING REQUIREMENTS: Unless otherwise stated in Section D clauses, packaging and preservation shall be performed in accordance with the best commercial practices to afford maximum protection against damage.
DELIVERY INSTRUCTIONS: Item shall be priced for F.O.B. Destination. Inspection and acceptance shall be at destination by the Government.
SPECIAL CONTRACT REQUIREMENTS:
Please submit your quote via e-mail to kristin.j.liljestrom.civ@us.navy.mil, miramaje.c.brown.civ@us.navy.mil, Jorge.a.morales67.civ@us.navy.mil QUOTES must be received by the destination inbox no later than 09 September 2026 at 2:00 PM, San Diego local time.
This notice has closed — what to do next
We hold 10 notices from DEPT OF DEFENSE · DEPT OF THE NAVY · NAVSEA · REGIONAL MAINTENANCE CENTER · SOUTHWEST REGIONAL MAINT CENTER, going back to September 2026 — 2 of them still open. They buy mostly in Manufacturing & Supply, Electronics & Semiconductors and Construction & Infrastructure. There are 3,106 open Manufacturing & Supply tenders in United States.
Open now from this buyer
Open Manufacturing & Supply tenders in United States
- Sole Source Notice — Maint-Rep of Elect-Elct EQ· closes 20 Nov
- Gasket — 12 each, NSN 5330014652539· closes 27 Nov
- Procurement of Pick-Up Trucks, Bucket Trucks, and Forklifts· closes 18 Nov
- Valve, Regulating, Fluid — 36 each, NSN 4810016226215· closes 20 Nov
- Vacuum Linear Motion Feedthrough Assembly — Miscellaneous Power Transmission Equipment· closes 20 Nov
Explore United States
- DEPT OF DEFENSE · DEPT OF THE NAVY · NAVSEA · REGIONAL MAINTENANCE CENTER · SOUTHWEST REGIONAL MAINT CENTER: buyer profile →
- All open tenders in United States →
- Manufacturing & Supply tenders in United States →
- United States market report, November 2026 →
- Public buyers in United States →
- Manufacturing & Supply suppliers →
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this manufacturing & supply opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Manufacturing & Supply tenders
- Supply Of It, sports And Furniture EtcDepartment of Higher Education · Sagar - Govt Arts and Commerce College Sagar · India
- Циркуляційний охолоджувач – компресорUkraine's defense-industrial complex · Ukraine
- Annual Maintenance Contract for providing Technical Advisory Services of OEM Ms Kobe Steel Ltd for Inspection/OverhaulingIndianOil · Refineries · Panipat Refinery · Contracts · India
- Sale of 5,000MT Overburden Dust at Mine Site of Malabar Cements Limited,WalayarMalabar Cements Ltd · MCL Palakkad · Materials · India
- Selection of Consortium Partner for participation in BSNL Tender for Repair, Maintenance, and Installation of Plant/Systems/Equipments Version 2 Combined maintenance of OFC routes, Media Equipment, BTS, Towers, Power Equipment and InfrastructureTelecommunications Consultants India Limited · Corporate Office - TCIL Bhawan · Defence Project Division - TCIL · India
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →