Technical consultancy for the diagnosis and conceptual development of a management model with private participation for the metropolitan passenger railway system of the Metropolitan Area of Buenos Aires (AMBA)
Inter-American Development Bank (IDB)
- Published
- 8/8/2026
- Closes
- 22/8/2026, 2:59:00 am UTC
- Bid opening
- —
- Value
- USD 1,50,000
- Reference
- AR-T1397
- Location
- Argentina
- Sector
- Transport & Logistics
- Type
- —
Details
The Inter-American Development Bank (IDB) invites specialized consulting firms to present their proposals to carry out the comprehensive diagnosis and conceptual structuring of a management model with private participation for the metropolitan passenger rail system of the AMBA.
The general objective is to evaluate the operational, financial and institutional state of the system and design a sustainable, bankable and fiscally affordable business model that generates Value for Money, establishing the strategic roadmap for its subsequent implementation.
1. Objectives and technical scope
Baseline and diagnosis: Comprehensively evaluate the seven railway lines of the AMBA in their operational, asset (tracks, rolling stock, workshops), economic-financial, labor, regulatory and institutional dimensions.
Design of the business model: Substantiate the selected private participation modality (concession, management or mixed options), evaluating criteria of bankability, fiscal affordability and efficiency.
Functional structuring: Group the lines into efficient contracting units, delimit the functions that remain under the control of the State and define the risk matrix and remuneration schemes (e.g. train-kilometre).
2. Implementation stages and key activities
Stage 1 — Comprehensive diagnosis and gaps: Construction of the supply and demand baseline, evaluation of costs and tariff/subsidy coverage, review of collective labor agreements and identification of structural constraints.
Stage 2 — Conceptual development of the model: Formulation of the remuneration scheme, calibration of adjustment formulas, risk allocation matrix (demand, inflation, exchange rate, maintenance), quality indicators (KPIs), incentives/penalties regime and design of the institutional framework.
Stage 3 — Roadmap and implementation: Preparation of the bidding schedule, implementation risk map with mitigation measures and prioritization of complementary studies (capacity modeling, market surveying and asset valuation).
3. Outputs and expected outcomes
Diagnostic report and baseline: Quantitative and qualitative evaluation of the seven lines of the AMBA, gap analysis and definition of the State's public policy objectives.
Conceptual document of the management model: Rationale of the selected model, contracting units, risk matrix, economic regime, remuneration scheme and draft of the contractual structure.
Roadmap and tender inputs: Executive sequence of implementation, comprehensive risk map and specification of additional technical, legal and financial studies required.
Note: Interested companies should review the requirements on the BEO Bidder Portal. TheInter-AmericanDevelopmentBank(IDB)invitesspecializedconsultingfirmstopresenttheirproposalstocarryoutthecomprehensivediagnosisandconceptualstructuringofamanagementmodelwithprivateparticipationforthemetropolitanpassengerrailsystemoftheAMBA.Thegeneralobjectiveistoevaluatetheoperational,financialandinstitutionalstateofthesystemanddesignasustainable,bankableandfiscallyaffordablebusinessmodelthatgeneratesValueforMoney,establishingthestrategicroadmapforitssubsequentimplementation.1.ObjectivesandtechnicalscopeBaselineanddiagnosis:ComprehensivelyevaluatethesevenrailwaylinesoftheAMBAintheiroperational,asset(tracks,rollingstock,workshops),economic-financial,labor,regulatoryandinstitutionaldimensions.Designofthebusinessmodel:Substantiatetheselectedprivateparticipationmodality(concession,managementormixedoptions),evaluatingcriteriaofbankability,fiscalaffordabilityandefficiency.Functionalstructuring:Groupthelinesintoefficientcontractingunits,delimitthefunctionsthatremainunderthecontroloftheStateanddefinetheriskmatrixandremunerationschemes(e.g.train-kilometre).2.ImplementationstagesandkeyactivitiesStage1—Comprehensivediagnosisandgaps:Constructionofthesupplyanddemandbaseline,evaluationofcostsandtariff/subsidycoverage,reviewofcollectivelaboragreementsandidentificationofstructuralconstraints.Stage2—Conceptualdevelopmentofthemodel:Formulationoftheremunerationscheme,calibrationofadjustmentformulas,riskallocationmatrix(demand,inflation,exchangerate,maintenance),qualityindicators(KPIs),incentives/penaltiesregimeanddesignoftheinstitutionalframework.Stage3—Roadmapandimplementation:Preparationofthebiddingschedule,implementationriskmapwithmitigationmeasuresandprioritizationofcomplementarystudies(capacitymodeling,marketsurveyingandassetvaluation).3.OutputsandexpectedoutcomesDiagnosticreportandbaseline:QuantitativeandqualitativeevaluationofthesevenlinesoftheAMBA,gapanalysisanddefinitionoftheState'spublicpolicyobjectives.Conceptualdocumentofthemanagementmodel:Rationaleoftheselectedmodel,contractingunits,riskmatrix,economicregime,remunerationschemeanddraftofthecontractualstructure.Roadmapandtenderinputs:Executivesequenceofimplementation,comprehensiveriskmapandspecificationofadditionaltechnical,legalandfinancialstudiesrequired.Note:InterestedcompaniesshouldreviewtherequirementsontheBEOBidderPortal.
Executing unit: Inter-American Development Bank (IDB)
IDB project: AR-T1397
Contact: julietaa@iadb.org
Financed by the Inter-American Development Bank (IDB).
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this transport & logistics opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Transport & Logistics tenders
- SELECTION OF PADDY TRANSPORT CONTRACTOR FOR PADAMPUR BLOCK IN BARAGADA DISTRICT FOR KMS 2025-26Odisha State Civil Supplies Corp. Ltd. · CSO cum DM Baragarh · India
- SELECTION OF PADDY TRANSPORT CONTRACTOR FOR BARPALI BLOCK IN BARAGADA DISTRICT FOR KMS 2025-26Odisha State Civil Supplies Corp. Ltd. · CSO cum DM Baragarh · India
- SELECTION OF PADDY TRANSPORT CONTRACTOR FOR PAIKMAL BLOCK IN BARAGADA DISTRICT FOR KMS 2025-26Odisha State Civil Supplies Corp. Ltd. · CSO cum DM Baragarh · India
- SELECTION OF PADDY TRANSPORT CONTRACTOR FOR ATTABIRA BLOCK IN BARAGADA DISTRICT FOR KMS 2025-26Odisha State Civil Supplies Corp. Ltd. · CSO cum DM Baragarh · India
- RFI Connected Mobility ServicesNew Zealand Government · New Zealand
Ready to bid? Verify the details and apply on the official tender page.
Verify & apply on the official portal →