Characterization of environmental mining governance in the Lithium Region
Inter-American Development Bank (IDB)
- Published
- 8/8/2026
- Closes
- 13/8/2026, 3:00:00 pm UTC
- Bid opening
- —
- Value
- USD 40,000
- Reference
- RG-T4442
- Location
- Argentina
- Sector
- Water & Environment
- Type
- —
Details
The Inter-American Development Bank (IDB) invites specialized consulting firms to submit their proposals to carry out a technical-environmental characterization and mapping of mining governance in the provinces of Salta, Catamarca and Jujuy, in the Lithium Region of Argentina.
The main objective is to evaluate regulatory instruments, permits, inspection processes, monitoring mechanisms, mine closure plans and post-mining transition schemes, as well as the articulation between mining and environmental authorities to identify concrete opportunities for institutional strengthening.
1. Technical scope and strategic axes
Permits and environmental management: Characterize the Environmental Impact Assessment (EIA) procedures, granting of permits, approval conditions and technical information requirements in each jurisdiction.
Monitoring and oversight: Evaluate the actual application of inspection systems, control of environmental commitments, information reporting, and contingency management.
Mine closure and post-mining transition: Analyze the regulatory and institutional criteria applied or under development for the closure phase and territorial environmental recovery.
Capacities and institutional interconnection: Identify operational bottlenecks, availability of information systems, and the level of coordination between mining, environmental, and other competent authorities.
2. Fieldwork and methodology
Qualitative and territorial survey: Design and carry out semi-structured interviews, work meetings and technical visits in the three provinces with representatives of the public sector, private sector, civil society, academia and local actors.
Systematization of information: Integrate primary and secondary data on administrative records, technical reports, available indicators, and inspection history.
Regional comparative analysis: Contrast the frameworks of Salta, Catamarca and Jujuy to identify provincial good practices, common patterns and operational gaps.
3. Expected deliverables
Deliverable 1 — Initial Report: Detailed work plan, provincial survey strategy, mapping of key actors and initial matrix of environmental instruments and practices.
Deliverable 2 — Progress Report (Provincial): Specific diagnosis for each province (Salta, Catamarca and Jujuy) on the operation of instruments, monitoring mechanisms, available capacities and local recommendations.
Deliverable 3 — Final Comparative Report: Regional comparative analysis that consolidates operational gaps, lessons learned and recommendations to strengthen oversight, information traceability, mine closure and post-mining transition in the Lithium Region.
Note: Interested companies should review the requirements on the BEO Bidder Portal. TheInter-AmericanDevelopmentBank(IDB)invitesspecializedconsultingfirmstosubmittheirproposalstocarryoutatechnical-environmentalcharacterizationandmappingofmininggovernanceintheprovincesofSalta,CatamarcaandJujuy,intheLithiumRegionofArgentina.Themainobjectiveistoevaluateregulatoryinstruments,permits,inspectionprocesses,monitoringmechanisms,mineclosureplansandpost-miningtransitionschemes,aswellasthearticulationbetweenminingandenvironmentalauthoritiestoidentifyconcreteopportunitiesforinstitutionalstrengthening.1.TechnicalscopeandstrategicaxesPermitsandenvironmentalmanagement:CharacterizetheEnvironmentalImpactAssessment(EIA)procedures,grantingofpermits,approvalconditionsandtechnicalinformationrequirementsineachjurisdiction.Monitoringandoversight:Evaluatetheactualapplicationofinspectionsystems,controlofenvironmentalcommitments,informationreporting,andcontingencymanagement.Mineclosureandpost-miningtransition:Analyzetheregulatoryandinstitutionalcriteriaappliedorunderdevelopmentfortheclosurephaseandterritorialenvironmentalrecovery.Capacitiesandinstitutionalinterconnection:Identifyoperationalbottlenecks,availabilityofinformationsystems,andthelevelofcoordinationbetweenmining,environmental,andothercompetentauthorities.2.FieldworkandmethodologyQualitativeandterritorialsurvey:Designandcarryoutsemi-structuredinterviews,workmeetingsandtechnicalvisitsinthethreeprovinceswithrepresentativesofthepublicsector,privatesector,civilsociety,academiaandlocalactors.Systematizationofinformation:Integrateprimaryandsecondarydataonadministrativerecords,technicalreports,availableindicators,andinspectionhistory.Regionalcomparativeanalysis:ContrasttheframeworksofSalta,CatamarcaandJujuytoidentifyprovincialgoodpractices,commonpatternsandoperationalgaps.3.ExpecteddeliverablesDeliverable1—InitialReport:Detailedworkplan,provincialsurveystrategy,mappingofkeyactorsandinitialmatrixofenvironmentalinstrumentsandpractices.Deliverable2—ProgressReport(Provincial):Specificdiagnosisforeachprovince(Salta,CatamarcaandJujuy)ontheoperationofinstruments,monitoringmechanisms,availablecapacitiesandlocalrecommendations.Deliverable3—FinalComparativeReport:Regionalcomparativeanalysisthatconsolidatesoperationalgaps,lessonslearnedandrecommendationstostrengthenoversight,informationtraceability,mineclosureandpost-miningtransitionintheLithiumRegion.Note:InterestedcompaniesshouldreviewtherequirementsontheBEOBidderPortal.
Executing unit: Inter-American Development Bank (IDB)
IDB project: RG-T4442
Contact: mwalter@iadb.org
Financed by the Inter-American Development Bank (IDB).
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this water & environment opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Water & Environment tenders
- Pappireddipatti Block in Package No. TN04 -01 / 2026-27 Sitheri General fund VP Extension of pipeline from Moolerikadu Burial Ground near Openwell to Sivapuram 1000 litr Syntex H/O Sitheri 850 mRural Development and Panchayat Raj Department · Dharmapuri,RD,TN · PAPPIREDDIPATTI, DHARMAPURI,RD,TN · India
- Providing New Borewells for 30000 Litre OHT at Periyar Samathuvapuram and Power Pump at KK Nagar in Kallakudi Town Panchayat, Tiruchirappalli DistrictDirectorate of Town Panchayats · Tiruchirappalli Zone · Kallakudi Town Panchayat, Tiruchirappalli · India
- Operation watch and ward of 1 No 3.75 MLD STP 1 No Sewage pumping station and 5 Nos Tube wells pumping plant along with all connected electrical and mechanical equipmentU P Jal Nigam (HQ), Lucknow · Chief Engineer (Lucknow) · GM, Gomti Pollution Control Unit, Lucknow · PM Gomti Pollution Control Unit (3rd) E/M Lucknow · India
- DOOR TO DOOR GARBAGE COLLECTION AND OTHER CLEANING RELATED WORS AT PS Kushalgarh GP Bari sarwaPanchayati Raj Department · Secretary and Commissioner · CEO-BANSWARA · BDO-KUSHALGARH · India
- RFQ 54342 RE-ADVERTAirports Company of South Africa · South Africa
Ready to bid? Verify the details and apply on the official tender page.
Verify & apply on the official portal →