Strategic diagnosis and master plan for the strengthening of the integrated solid waste management infrastructure of the Central Region of El Salvador
Inter-American Development Bank (IDB)
- Published
- 8/8/2026
- Closes
- 18/8/2026, 2:59:00 am UTC
- Bid opening
- —
- Value
- USD 1,90,000
- Reference
- RG-T4317
- Location
- El Salvador
- Sector
- Water & Environment
- Type
- —
Details
The Inter-American Development Bank (IDB) invites specialized consulting companies to submit their proposals to develop the strategic diagnosis and master plan for the strengthening of the regional system of integrated solid waste management in the Central Region of El Salvador.
The general objective is to structure a new regional waste management model aligned with the policy of the National Solid Waste Authority (ANDRES), the Special Law on Waste Collection, Treatment and Final Disposal and the principles of circular economy. The consultancy will deliver conceptual designs and pre-investment studies (preliminary projects) with the level of technical, logistical and financial detail necessary for the Government of El Salvador and the IDB to directly prepare the terms of reference for the contracting of the executive design and construction of the works.
1. Technical scope of the regional system
Comprehensive chain management: Evaluation and functional design of the infrastructure from generation to final disposal, including temporary storage, containerization, collection, transport and transfer.
Recovery and treatment: Strategic infrastructure for the separation/recovery of recyclable materials and the treatment of organic waste.
Final disposal and support: Adaptation and expansion of sanitary landfills, new cells, complementary works, machinery, vehicle fleet and auxiliary operational equipment.
Financial sustainability: Analysis of the cost structure, logistical efficiencies, mechanisms for gradual cost recovery, guidelines for future tariff schemes and financing schemes or participation of the private sector.
2. Specific objectives and key activities
Strategic diagnosis and baseline: Survey of the existing physical and operational inventory, evaluation of installed capacities, identification of bottlenecks and interpretation of the spatial distribution and generation of waste in the Central Region.
Analysis of alternatives and investments: Comparative evaluation of technical, territorial, environmental and economic options to define the location, capacity, sequence and functionality of the required infrastructure.
Formulation of the master plan: Definition of the system's development vision with short-, medium- and long-term implementation horizons, together with the roadmap for institutional strengthening and risk management.
Pre-investment studies and preliminary projects: Preparation of conceptual designs for the prioritized works, including projected demand, distribution of surfaces, sizing criteria, operational processes and estimation of investment costs and O&M.
3. Key inputs for the investment cycle
Definition of bidding parameters: Preparation of conceptual specifications and functional requirements to directly tender the subsequent phases of detailed design and execution of works.
Planning of future requirements: Identification of site-specific studies, processing of environmental licenses and required permits before the construction phase.
Note: Interested companies should review the requirements on the BEO Bidder Portal. TheInter-AmericanDevelopmentBank(IDB)invitesspecializedconsultingcompaniestosubmittheirproposalstodevelopthestrategicdiagnosisandmasterplanforthestrengtheningoftheregionalsystemofintegratedsolidwastemanagementintheCentralRegionofElSalvador.ThegeneralobjectiveistostructureanewregionalwastemanagementmodelalignedwiththepolicyoftheNationalSolidWasteAuthority(ANDRES),theSpecialLawonWasteCollection,TreatmentandFinalDisposalandtheprinciplesofcirculareconomy.Theconsultancywilldeliverconceptualdesignsandpre-investmentstudies(preliminaryprojects)withtheleveloftechnical,logisticalandfinancialdetailnecessaryfortheGovernmentofElSalvadorandtheIDBtodirectlypreparethetermsofreferenceforthecontractingoftheexecutivedesignandconstructionoftheworks.1.TechnicalscopeoftheregionalsystemComprehensivechainmanagement:Evaluationandfunctionaldesignoftheinfrastructurefromgenerationtofinaldisposal,includingtemporarystorage,containerization,collection,transportandtransfer.Recoveryandtreatment:Strategicinfrastructurefortheseparation/recoveryofrecyclablematerialsandthetreatmentoforganicwaste.Finaldisposalandsupport:Adaptationandexpansionofsanitarylandfills,newcells,complementaryworks,machinery,vehiclefleetandauxiliaryoperationalequipment.Financialsustainability:Analysisofthecoststructure,logisticalefficiencies,mechanismsforgradualcostrecovery,guidelinesforfuturetariffschemesandfinancingschemesorparticipationoftheprivatesector.2.SpecificobjectivesandkeyactivitiesStrategicdiagnosisandbaseline:Surveyoftheexistingphysicalandoperationalinventory,evaluationofinstalledcapacities,identificationofbottlenecksandinterpretationofthespatialdistributionandgenerationofwasteintheCentralRegion.Analysisofalternativesandinvestments:Comparativeevaluationoftechnical,territorial,environmentalandeconomicoptionstodefinethelocation,capacity,sequenceandfunctionalityoftherequiredinfrastructure.Formulationofthemasterplan:Definitionofthesystem'sdevelopmentvisionwithshort-,medium-andlong-termimplementationhorizons,togetherwiththeroadmapforinstitutionalstrengtheningandriskmanagement.Pre-investmentstudiesandpreliminaryprojects:Preparationofconceptualdesignsfortheprioritizedworks,includingprojecteddemand,distributionofsurfaces,sizingcriteria,operationalprocessesandestimationofinvestmentcostsandO&M.3.KeyinputsfortheinvestmentcycleDefinitionofbiddingparameters:Preparationofconceptualspecificationsandfunctionalrequirementstodirectlytenderthesubsequentphasesofdetaileddesignandexecutionofworks.Planningoffuturerequirements:Identificationofsite-specificstudies,processingofenvironmentallicensesandrequiredpermitsbeforetheconstructionphase.Note:InterestedcompaniesshouldreviewtherequirementsontheBEOBidderPortal.
Executing unit: Inter-American Development Bank (IDB)
IDB project: RG-T4317
Contact: magdac@iadb.org
Financed by the Inter-American Development Bank (IDB).
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this water & environment opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Water & Environment tenders
- Pappireddipatti Block in Package No. TN04 -01 / 2026-27 Sitheri General fund VP Extension of pipeline from Moolerikadu Burial Ground near Openwell to Sivapuram 1000 litr Syntex H/O Sitheri 850 mRural Development and Panchayat Raj Department · Dharmapuri,RD,TN · PAPPIREDDIPATTI, DHARMAPURI,RD,TN · India
- Providing New Borewells for 30000 Litre OHT at Periyar Samathuvapuram and Power Pump at KK Nagar in Kallakudi Town Panchayat, Tiruchirappalli DistrictDirectorate of Town Panchayats · Tiruchirappalli Zone · Kallakudi Town Panchayat, Tiruchirappalli · India
- Operation watch and ward of 1 No 3.75 MLD STP 1 No Sewage pumping station and 5 Nos Tube wells pumping plant along with all connected electrical and mechanical equipmentU P Jal Nigam (HQ), Lucknow · Chief Engineer (Lucknow) · GM, Gomti Pollution Control Unit, Lucknow · PM Gomti Pollution Control Unit (3rd) E/M Lucknow · India
- DOOR TO DOOR GARBAGE COLLECTION AND OTHER CLEANING RELATED WORS AT PS Kushalgarh GP Bari sarwaPanchayati Raj Department · Secretary and Commissioner · CEO-BANSWARA · BDO-KUSHALGARH · India
- RFQ 54342 RE-ADVERTAirports Company of South Africa · South Africa
Ready to bid? Verify the details and apply on the official tender page.
Verify & apply on the official portal →