Romania – Construction work for highways, roads – Proiectare si executie „Nod Rutier Pantelimon (A0 - km 48) sectorul A0 Nord”
Issued by COMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A. · via TED — Tenders Electronic Daily (EU)
- Published
- 3 Nov 2026
- Closes
- 26 Nov 2026, 23:59 UTC
- Value
- RON 162,816,652.76
- Reference
- 762315-2026
- Location
- Romania
- Sector
- Construction & Infrastructure
- Type
- works
At a glance
COMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A. in Romania has published an invitation to bid in construction & infrastructure: “Romania – Construction work for highways, roads – Proiectare si executie „Nod Rutier Pantelimon (A0 - km 48) sectorul A0 Nord””. Submissions close on 26 November 2026, 24 days from today. The stated value is RON 162,816,652.76. Quote reference 762315-2026 in any correspondence with the buyer. One document is attached to this notice. FreeTender has recorded 82 notices from this buyer since 2026, 31 of them currently open. There are 295 open construction & infrastructure notices in Romania on FreeTender. Bids are submitted to the buyer through TED — Tenders Electronic Daily (EU), not through FreeTender.
Details
II.1.4 Descrierea succinta a contractului sau a achizitiei/achizitiilor Obiectul contractului il reprezinta proiectarea si executia Nodului Rutier Pantelimon (A0 - km 48) sectorul A0 Nord, in conformitate cu prevederile contractului de lucrari. In conformitate cu prevederile art. 160 alin. (1) din Legea nr. 98/2016 cu modificarile si completarile ulterioare, termenul limita pana la care orice operator economic interesat de participarea la procedura de achizitie publica are dreptul de a solicita clarificari sau informatii suplimentare in legatura cu documentatia de atribuire este cu 25 zile inainte de termenul limita de depunere a ofertelor. In conformitate cu prevederile art. 160 alin. (2) din Legea 98/2016 cu modificarile si completarile ulterioare, Autoritatea Contractanta stabileste un singur termen limita in care va raspunde tuturor solicitarilor de clarificare/ informatiilor suplimentare, dupa cum urmeaza: cu 12 zile inainte de termenul limita de depunere a ofertelor. Termenul de raspuns la clarificari a fost stabilit astfel incat operatorii economici sa aiba o perioada adecvata pentru analizarea documentatiei de atribuire si, ulterior, pentru elaborarea ofertelor prin prisma raspunsurilor oferite de Autoritatea Contractanta.
Lots Lot 1 — Default lot (estimated 162816652.76): Obiectul contractului il reprezinta proiectarea si executia Nodului Rutier Pantelimon (A0 - km 48) sectorul A0 Nord, in conformitate cu prevederile contractului de lucrari. In conformitate cu prevederile contractuale, respectiv ale H.G. nr.1/2018, eventualele modificari care pot interveni in perioada de derulare a contractului, se refera la urmatoarele, fara a se limita la acestea: 1. Modificari ale partilor contractante, inclusiv inlocuirea contractantului cu un nou contractant in conditiile prevazute la art. 221 alin. (1) lit. d), punctul (ii); 2. Schimbarea denumirii si/sau a formei societatii, schimbari care nu atrag crearea unei persoane juridice noi; 3. Modificari care rezulta din adaptarea Proiectului Tehnic de Execuție la realitatea din teren, inclusiv schimbări de soluții tehnice punctuale; 4. Modificari care rezulta din modificări/adaptări ale cotelor, pozițiilor și/ sau dimensiunilor unor lucrari ca urmare a situatiei din teren; 5. Modificari generate de cerinte ale autoritatilor de mediu; 6. Modificari care rezulta din necesitatea mutarii/stramutarii unor obiecte aflate pe/in sol/subsol; 7. Modificari generate de includerea de noi subcontractanti/ furnizori/ subcontractanții subcontractanților/ orice alți operatori economici si/sau generate de inlocuirea subcontractantilor/ furnizorilor/ subcontractanții subcontractanților/ orice alți operatori economici initiali, care se vor realiza conform clauzei corespunzatoare din Conditiile Generale ale Contractului; 8. Modificari generate de schimbarea personalului cheie/alt personal, care se vor realiza conform clauzei corespunzatoare din Conditiile Generale ale Contractului; 9. Modificari ale culoarului/coridorului de expropriere care conduc la necesitatea realizarii de lucrari suplimentare si/sau la renuntarea realizarii unor lucrari existente in Contract; 10. Modificari generate de acorduri, conventii, intelegeri ale statului/autoritatilor locale cu alte state; 11. Modificari legislative sau de norme tehnice/ stasuri/ normative/ standarde, pe parcursul derularii contractului, care se vor realiza conform clauzei corespunzatoare din Conditiile Generale ale Contractului, cu respectarea prevederilor art. 221 din Legea nr. 98/2016, cu modificarile si completarile ulterioare; 12. Prelungirea Duratei de Executie in baza mecanismului contractual prevazut la Clauza 35 [Prelungirea Duratei de Execuţie] din Conditiile Generale fara a se aduce atingere dreptului Beneficiarului de a aplica Antreprenorului penalitatile si/sau sanctiunile prevazute in contract; 13. Modificari care rezulta din implementarea solicitarilor provenite de la diverse institutii/autoritati/entitati care au atributii in legatura cu obiectivul de investitie (de exemplu: Ministere, JASPERS, Autoritati/Institutii centrale si/sau locale, Verificatori atestati, organisme de control, etc.). 14. Modificari care rezulta din descarcarea de sarcini arheologice. 15. Modificari generate de modificari ale terenului, retelei hidrografice supraterane si subterane necunoscute la data elaborarii Proiectului Tehnic de Execuție; Modificarile vor fi realizate ulterior semnarii contractului, in conformitate cu prevederile contractuale, numai in conditiile in care acestea nu reprezinta modificari substantiale in sensul prevederilor art. 221 alin. (7) din Legea nr. 98/2016. Prelungirea Duratei de Executie se va realiza in conformitate cu prevederile Clauzei 35 [Prelungirea Duratei de Executie] din Conditiile Generale. Mai multe informatii se regasesc in Contract.
Buyer: COMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A.
Buyer country: ROU
Procedure: open
CPV code: 45233100
Full notice, tender documents and how to bid are on the official TED page (link above).
Context for bidders
We hold 82 notices from COMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A., going back to August 2026 — 31 of them still open. They buy mostly in Construction & Infrastructure, Transport & Logistics and Manufacturing & Supply. There are 295 open Construction & Infrastructure tenders in Romania. This one closes in 24 days.
More from this buyer
- Romania – Construction supervision services – Servicii de Supervizare ,,Executie Lucrari Drum Expres Arad – Oradea Lot 1”· closes 23 Nov
- Romania – Highway maintenance work – Acord-cadru pentru lucrări de întreținere periodică - covoare asfaltice - DRDP Timișoara - Secția Întreținere Autostrăzi - Remetea Mare - Nădlac, anul I - anul IV· closes 7 Dec
- Romania – Modular and portable buildings – „Depozite modulare acoperite pentru material antiderapant (sare)- 4 buc (Baza Ilia, Baza Ezeriș, Baza Teremia Mare, PS Campu lui Neag)”· closes 7 Dec
- Romania – Construction supervision services – Servicii de Supervizare Proiectare si Executie „Modernizare DN71 Baldana – Targoviste – Sinaia, km 0+000 – km 44+130 largire la 4 benzi de circulatie si km 51+041 – km 109+905 drum la doua benzi, Sector 2: Targoviste – Sinaia km 51+041 – km 109+905 drum la 2 benzi de circulatie”· closes 23 Nov
- Romania – Cleaning and sanitation services – Acord cadru pe o perioada de 24 luni, avand ca obiect: “Asigurarea serviciilor de salubrizare in locurile de parcari, grupurilor sanitare precum si a zonei adiacente acestora, pentru spatiile de servicii din cadrul SDN Bucuresti: LOT 1 – Parcare de scurta durata DN CB km 54+765 stanga; LOT 2 – Parcari de scurta durata DN7 km 38+300 dr+stg· closes 2 Dec
Similar Construction & Infrastructure tenders
- Romania – Construction work – Execuţie de lucrări pentru obiectivul “Centru Medical”· closes 23 Nov
- Romania – Construction work for buildings relating to law and order – LUCRĂRI DE REABILITARE TERMO-ENERGETICĂ A 7 OBIECTIVE DE INVESTIȚII DIN CADRUL INSPECTORATULUI TERITORIAL AL POLIȚIEI DE FRONTIERĂ IAȘI – 7 LOTURI· closes 16 Nov
- Romania – Historical monument or memorial construction work – Acord – cadru de lucrări de „Reparații și întreținere a monumentelor de for public aflate în administrarea Municipiului Timișoara”· closes 8 Dec
- Romania – Historical monument or memorial construction work – Executie Lucrari pentru obiectivului de investitii- “Consolidare, Restaurare și Refunctionalizare a Imobilului Fostul Palat Mihail Sturdza, situat în Municipiul Iași, str. Cloșca, nr. 9, M.I. cuprins în L.M.I. la poz. 954 cu nr. IS-II-m-B-03808, județul Iași”- lucrări suplimentare - ID 1669· closes 25 Nov
- Romania – Construction supervision services – Servicii de Supervizare Proiectare si Executie „Modernizare DN71 Baldana – Targoviste – Sinaia, km 0+000 – km 44+130 largire la 4 benzi de circulatie si km 51+041 – km 109+905 drum la doua benzi, Sector 2: Targoviste – Sinaia km 51+041 – km 109+905 drum la 2 benzi de circulatie”· closes 23 Nov
Documents
- TED-official-notice-762315-2026.pdfDownload (pdf)
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Construction & Infrastructure tenders
- Construction of highway on Provincial Route No. 11, section: Mar de Ajó – PinamarDirectorate of Roads of the Province of Buenos Aires · Argentina
- Supply and Delivery of Reinforced Concrete Box Culverts (RCBC)Greater Hume Council · Australia
- Parkhurst Boundary FencingDepartment of Primary Industries · Australia
- Mayne Yard ELP Sheds Fire System UpgradeQueensland Rail · Australia
- Request for Information - Mechanical Maintenance and Repairs of HVAC-RCity Of Gold Coast · Australia
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →