RFQ - Dug well Based Piped Water Supply Scheme (PWSS)
Issued by WaterAid India · via DevNetJobs India — RFP & Assignments
- Published
- 20 Oct 2026
- Closes
- 26 Oct 2026
- Reference
- devnet-306162
- Location
- Dindori, Madhya Pradesh, India
- Sector
- Water & Environment
- Type
- consultancy
At a glance
WaterAid India in India has published a request for quotations in water & environment: “RFQ - Dug well Based Piped Water Supply Scheme (PWSS)”. Submissions close on 26 October 2026, 4 days from today. Quote reference devnet-306162 in any correspondence with the buyer. FreeTender has recorded 54 notices from this buyer since 2026, 6 of them currently open. There are 134 open water & environment notices in India on FreeTender. Bids are submitted to the buyer through DevNetJobs India — RFP & Assignments, not through FreeTender.
Details
CONCEPT NOTE
Dug well Based Piped Water Supply Scheme (PWSS)
Village: Bital Bahara
Gram Panchayat: Khamha
Block: Samnapur
District: Dindori, Madhya Pradesh
Implementing Organization: WaterAid, Dindori
Target Beneficiaries: 81 Baiga Tribal Families
1. Introduction
Bital Bahara village, located under Khamha Gram Panchayat of Samnapur Block, Dindori District, is predominantly inhabited by the Baiga tribal community. To improve access to safe, adequate, and sustainable drinking water, WaterAid Dindori proposes to develop a Dugwell Based Piped Water Supply Scheme (PWSS) in the village.
Under the proposed intervention, the existing dugwell will be developed and protected as a reliable drinking water source. Necessary source protection measures will be undertaken to prevent contamination and ensure the safe utilization of groundwater.
A 3 HP solar-powered submersible pump will be installed to lift water from the dugwell. The pumped water will be stored in an approximately 10 KL Overhead Tank (OHT) and subsequently supplied to the community through a piped distribution network and public tap stands.
The proposed intervention will directly benefit 81 Baiga tribal families by improving their access to safe and reliable drinking water.
2. Need for the Intervention
The community in Bital Bahara is dependent on local water sources for its drinking water requirements. During the summer season, reduced water availability and increased demand can create significant challenges for the community.
The existing dugwell also requires appropriate protection and improvement to reduce the risk of contamination from surface runoff, open surroundings, and other external sources.
In addition, the absence of a reliable piped water distribution system may require community members, particularly women and children, to spend considerable time collecting and carrying water.
Therefore, there is a need to strengthen the existing water source through dugwell protection, solar-powered water lifting, storage, and piped water distribution .
3. Project Objective
The primary objective of the project is to provide safe, adequate, reliable, and sustainable drinking water to 81 Baiga tribal families of Bital Bahara village.
Specific Objectives
To protect and improve the existing dugwell as a sustainable drinking water source.
To install a 3 HP solar-powered submersible pump for water lifting.
To promote the use of renewable solar energy for drinking water supply.
To establish an approximately 10 KL water storage system .
To develop a piped water distribution network for the beneficiary households/community.
To provide convenient access to drinking water through public tap stands.
To promote proper management of wastewater generated from tap stands.
To strengthen community participation in the operation and maintenance of the water supply system.
To improve the long-term sustainability of the village drinking water system.
4. Proposed Intervention
The following major activities are proposed under the project:
A. Dugwell Protection and Source Development
The existing dugwell will be strengthened and protected through appropriate civil works, including:
Construction of necessary protection measures around the dugwell.
Construction of a parapet/protection wall around the water source.
Provision of a suitable and safe MS cover for the dugwell.
Construction of a drinking water platform around the source.
Improvement of the surrounding area to prevent contamination and maintain cleanliness.
Measures to protect the water source from surface runoff and external contamination.
B. Solar-Powered Pumping System
A solar-based pumping system will be established to ensure sustainable water lifting from the dugwell.
The proposed system will include:
3 HP solar submersible pump .
Solar PV modules.
Solar MPPT/VFD controller.
Required DC cables and connectors.
Suitable GI/MS mounting structure for solar panels.
Required electrical safety and earthing arrangements.
The solar-powered system will help reduce dependence on conventional electricity and recurring energy costs.
C. Water Storage System
An approximately 10 KL Overhead Tank (OHT) will be installed/constructed for storage of pumped water.
The OHT will facilitate:
Adequate water storage.
Regular water supply to the community.
Gravity-based distribution wherever technically feasible.
Better management of peak drinking water demand.
D. Piped Water Distribution Network
A piped water distribution system will be developed to convey water from the dugwell/OHT to the community.
The proposed infrastructure includes:
Approximately 800 metres of main pipeline .
Approximately 1,300 metres of distribution pipeline .
HDPE/PE pipes and necessary fittings.
Required plumbing and connection works.
E. Tap Stands and Drinking Water Platforms
Approximately 19 public tap stands/platforms will be developed at suitable locations to provide convenient access to drinking water for the community.
The locations will be finalized in consultation with the Gram Panchayat and community to ensure equitable access.
F. Greywater Management
Approximately 19 leach pits will be constructed near the tap stands for proper disposal and management of greywater.
This will help to:
Prevent water stagnation.
Maintain cleanliness around tap stands.
Improve local groundwater recharge.
Promote decentralized greywater management.
G. Water Quality and Chlorination
Water quality testing will be undertaken to ensure that the supplied water is safe for drinking.
An auto chlorinator is also proposed to support appropriate disinfection of the drinking water supply and maintain water quality.
5. Target Beneficiaries
The project will directly benefit:
81 Baiga tribal families of Bital Bahara village.
The intervention is expected to particularly benefit women, children, and elderly community members by reducing the time and physical effort required to collect water from distant or unsafe sources.
6. Expected Outcomes
The proposed intervention is expected to achieve the following outcomes:
81 Baiga tribal families will gain improved access to safe and reliable drinking water.
The existing dugwell will be protected and developed as a safer water source.
A sustainable solar-powered drinking water system will be established.
Dependence on unsafe or distant water sources will be reduced.
The time and effort spent by women and children in collecting water will be reduced.
Access to drinking water within the village will be improved.
Proper greywater management will reduce stagnant water and unhygienic conditions.
Improved water source protection will contribute to long-term water security.
Community participation in operation and maintenance of the system will be strengthened.
7. Community Participation and Operation & Maintenance
Community participation will be an important component of the proposed intervention. The Gram Panchayat and community members will be involved in planning, implementation, monitoring, and operation and maintenance of the water supply system.
Community members will be oriented on:
Protection and cleanliness of the dugwell.
Safe operation of the solar pumping system.
Maintenance of pipelines and tap stands.
Regular cleaning of the OHT.
Drinking water quality and chlorination.
Identification and reporting of leakages and minor technical problems.
Community-based operation and maintenance of the water supply system.
The responsibility for regular operation and maintenance will be established at the village level in coordination with the Gram Panchayat and relevant community institutions.
8. Sustainability of the Intervention
The proposed system integrates source protection, solar-powered pumping, water storage, piped distribution, and greywater management to create a sustainable drinking water solution for the village.
The use of solar energy will reduce dependence on conventional electricit
Context for bidders
We hold 54 notices from WaterAid India, going back to July 2026 — 6 of them still open. They buy mostly in Water & Environment, Media, Printing & Advertising and Facility Management & Cleaning. There are 134 open Water & Environment tenders in India. This one closes in 4 days.
More from this buyer
Similar Water & Environment tenders
- Procurement of 11 Nos 132kV CVTs under EMOPH, STPS, WBPDCL through Capex FY 2026 27· closes 4 Nov
- Replacement of Blue Dyed Product Pipelines with New Pipelines for Ebmg Usage from Tank Wagon Siding Pump House to Tanks T003 and T004 and from Tanks Delivery to TLF Manifold at Jayant Depot Under Mpso· closes 29 Oct
- Existing Damaged PVC Drainage Pipeline with New 6inch PVC Pipeline work in Processing Hall Basement at Madurai Dairy· closes 2 Nov
- Repair of damaged sprinkling pipeline and plumbing fittings of WS28 Water Sprinklers Sl Nos 28192 28198 28200 and 28246 at Garjanbahal OCP.· closes 30 Oct
- EOI for Selection of a Developer CUM Operator for Development, Operation Maintenance of Sindoor Park, Jhanjra Area, on a Revenue Sharing Basis· closes 5 Nov
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this water & environment opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Water & Environment tenders
- Услуги по вывозу и утилизации медицинских отходов класса ГКоммунальное государственное предприятие на праве хозяйственного ведения "Восточно-Казахстанский областной центр психического здоровья" управления здравоохранения Восточно-Казахстанской области · Kazakhstan
- вывоз твердо-бытовых отходовРеспубликанское государственное учреждение "Департамент Пограничной службы Комитета национальной безопасности Республики Казахстан по Костанайской области" · Kazakhstan
- вывоз жидких бытовых отходовРеспубликанское государственное учреждение "Департамент Пограничной службы Комитета национальной безопасности Республики Казахстан по Костанайской области" · Kazakhstan
- Конкурс по государственным закупкам вывозу твердых-бытовых отходов на 2027 годРеспубликанское государственное учреждение "Воинская часть 60563" · Kazakhstan
- Услуги по вывозу (сбору) опасных отходов класса "Б"Коммунальное государственное предприятие "Аркалыкская региональная больница" Управления здравоохранения акимата Костанайской области · Kazakhstan
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →