Restitution of the design capacity of the Ayacucho - Dolores Aqueduct
Issued by Ministry of Infrastructure and Public Services · via IDB — BID for the Americas (Inter-American Development Bank)
- Published
- 17 Sept 2026
- Closes
- 8 Oct 2026, 02:59 UTC
- Reference
- AR-L1345
- Location
- Argentina
- Sector
- Water & Environment
Details
The Province of Buenos Aires (Argentina), through the Ministry of Infrastructure and Public Services, has financing from the Inter-American Development Bank (IDB) through Loan 5569/OC-AR for the "Program for the Improvement of Drinking Water Provision Services in the Province of Buenos Aires". This call for National Public Bidding (LPN No. 5/2026) invites eligible bidders to submit closed proposals for the execution of the works in the Ayacucho - Dolores Aqueduct.
Scope of the works
Main objective: Execution of infrastructure works aimed at restoring the design capacity of the Ayacucho - Dolores Aqueduct.
Budget and execution period: Estimated amount of ARS $2,562,402,912.00 (at May 2026 values), with a projected execution period of 420 days.
Qualification Requirements and Conditions
Regulatory framework: National Public Bidding (LPN) conducted in accordance with the IDB's Policies for the Acquisition of Goods and Works (GN-2349-15).
Financial Capacity and Background:
Minimum average annual turnover of ARS $3,954,000,000.00 in the best five (5) years within the last ten (10) years.
Access to or availability of financial resources for a minimum amount of ARS 457,600,000.00.
Not present breaches of contracts in the last five (5) years and have pending legal litigation that does not exceed 30% of the company's net worth.
Technical expertise:
General: Accreditation of at least one (1) work in the sanitation specialty executed in the last ten (10) years, with a minimum certification of ARS $2,050,000,000.00 in twelve consecutive months or annualized.
Specific: Demonstration of execution in the last ten (10) years of works that include drinking water and/or sewer impulsions with a diameter of no less than 400 mm and a length of no less than 5 km (admitting the sum of up to 2 works).
Margin of preference: No margin of preference will be granted to national contractors or transitional unions (UT/APCA).
Required Guarantee: Mandatory presentation of a Guarantee of seriousness of the offer in the amount of ARS 25,625,000.00 through a Surety Insurance Policy issued by an insurer approved by the Superintendence of Insurance of the Nation.
Management and submission of bids Access to the bases: The bidding documents can be obtained free of charge on the institutional website of the Ministry of Infrastructure and Public Services or requested by email to the Provincial Directorate of Sectoral and Special Programs and Projects.
Delivery modality: Physical presentation of bids in a sealed envelope at the headquarters of the Ministry in La Plata (Office 1113). Electronic bids are not accepted. The opening of the envelope will be carried out in a public act in person at the headquarters of the institution (Office 411).
Note: Tender documents and annexes are available in the official language of the country.
Executing unit: Ministry of Infrastructure and Public Services
IDB project: AR-L1345
Contact: [contact details removed]
Financed by the Inter-American Development Bank (IDB).
Context for bidders
There is 1 open Water & Environment tender in Argentina. This one closes in 21 days.
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this water & environment opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Water & Environment tenders
- Project management, supervision and technical assistance service for studies, design and construction projects in drinking water supply systems, located in Panama East and Panama West, Herrera and Red MatrizNational Aqueducts and Sewers (IDAAN) · Panama
- Environmental and Social Management Training Program – Pilot Project at CIDInter-American Development Bank (IDB) · RG
- Kampfmitteluntersuchungen und -beseitigungWasserstraßen- und Schifffahrtsamt Spree-Havel · Germany
- Entsorgung/ Verwertung von entwässertem Klärschlamm der Kläranlage Sangerhausen von 2027 bisWasserverband Südharz · Germany
- Übernahme, Transport, Sortierung und Verwertung von stoffgleichen Nichtverpackungen der Wertstofftonne aus dem Landkreis RastattLandratsamt Rastatt · Germany
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →