FreeTender
Accepting bidseoiNepal

Request for Expressions of Interest: Nepal Project: Siddartha Highway (Butwal-Pokhara Section) Improvement Project

Issued by AIIB-financed project (Nepal) · via AIIB — Project Procurement Notices

Published
27 Aug 2026
Closes
18 Sept 2026, 23:59 UTC
Reference
aiib-nepal-nepal-project-siddartha-highway-butwal-pokhara-section-improvement-project-request-for-expressions-of-interest-aug
Location
Nepal
Sector
Construction & Infrastructure

Details

Government of Nepal Ministry of Infrastructure Development Department of Roads Development Cooperation Implementation Division Siddhartha Highway (Butwal–Pokhara Section) Improvement Project Chakupat, Lalitpur, Nepal Request for Expressions of Interest (REOI)

Country: Nepal

Client: Ministry of Infrastructure Development, Department of Roads (DoR)

Project: Siddhartha Highway (Butwal-Pokhara Section) Improvement Project

Grant No.: S0996A

Contract/Assignment Title: Consultancy Services for Detailed Project Report (DPR) Preparation,

Institutional Strengthening & Capacity Building, Tender & Contract Documentation, Environment and Social Impact Assessment (ESIA) and Resettlement Plan (RP) of the proposed Siddhartha Highway (Butwal-Pokhara Section) Improvement Project

REOI Reference No: AIIB-DOR-BP-QCBS-1

Notice Published On: 27th August, 2026

1. The Government of Nepal (GoN) has received Project Preparation Special Fund (PPSF) Grant from the Asian Infrastructure Investment Bank (AIIB or the Bank) to support and facilitate the preparation of the proposed Siddhartha Highway (Butwal-Pokhara Section) Improvement Project and intends to apply the proceeds for the above-referenced contract.

2. The consulting services (“the Services”) include

Part I: Preparation of a Detailed Project Report, which shall include

a. (i) the engineering survey and investigation, design, drawing, Bill of Quantities (BOQ), cost estimation and preparation of bidding documents for the improvement option recommended by the implementing agency; and (ii) the contract modality shall be EPC/Design and Build contracts for tunnels and bridge viaduct, and item - rate contracts for road works. b. the strategic procurement planning and development of the Project Delivery Strategy (PDS) and Procurement Plan (PP) for the Project.

Part 2: Environmental and Social Assessments , including but not limited to the

preparation and updating of the Environmental and Social Impact Assessment/Environmental and Social Management Plan, Resettlement Plan, Stakeholder Engagement Plan, Labor Management Procedure, Gender Action Plan, and othe r environmental and social safeguard instruments in alignment with the Project’s Environmental and Social Management Planning Framework and the Bank’s Environmental and Social Standards in the Bank’s “ Environmental and Social *OFFICIAL USE ONLY Framework”, dated February 2016, as amended February 2019, May 2021, November …

Member: Nepal

Sector: Transport

Notice type: Request for Expressions of Interest

Issue date: Aug 27, 2026

Context for bidders

AIIB-financed project (Nepal) has 2 open notices on FreeTender. There are 8 open Construction & Infrastructure tenders in Nepal. This one closes in 23 days.

Documents

  • Request-for-Expression-of-Interest-REOI_-Siddhartha-Highway-Butwal-Pokhara-Section-Improvement-Project.pdfDownload (pdf)

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Construction & Infrastructure tenders

All Construction & Infrastructure tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →