Details

SPECIFIC PROCUREMENT NOTICE Request for Bids Plant Design, Supply, and Installation (Without Prequalification) (Two-Envelope Bidding Process with rated criteria)

Country: Ukraine

Project : Ukraine – Improving Power System Resilience for European Power Grid Integration (Installation of Hybrid Systems for Electricity Production in Ukrhydroenergo) Contract Title : Design, Supply and Installation of Battery Energy Storage Systems (BESS) with Energy Management Systems (EMS) and Ancillary Equipment at Kyiv HPP / PSP, Kaniv, Kremenchuk and Seredniodniprovska Hydropower Plants, including related services (training of UHE staff) (hereinafter referred to ‘the Contract’) comprising the following lots: Lot 1: Design, Supply and Installation of Battery Energy Storage Systems (BESS) with Energy Management Systems (EMS) and Ancillary Equipment at Kyiv HPP / PSP, including related services (training of UHE staff) (46 MW BESS capacity). Lot 2: Design, Supply and Installation of Battery Energy Storage Systems (BESS) with Energy Management Systems (EMS) and Ancillary Equipment at Kaniv HPP, including related services (training of UHE staff) (66 MW BESS capacity). Lot 3: Design, Supply and Installation of Battery Energy Storage Systems (BESS) with Energy Management Systems (EMS) and Ancillary Equipment at Kremenchuk HPP, including related services (training of UHE staff) (60 MW BESS capacity). Lot 4: Design, Supply and Installation of Battery Energy Storage Systems (BESS) with Energy Management Systems (EMS) and Ancillary Equipment at Seredniodniprovska HPP, including related services (training of UHE staff) (25 MW BESS capacity).

Source of financing:

IBRD Loan No.: 9284-UA;

CTF Loan No.: TF0B5994;

CTF Loan No.: TF0C5903-UA; and

CTF Grant No.: TF-0B5724.

Project ID: P176114

RFB reference No .: UHE-IPSR-DSI-1

1. Private Joint Stock Company “Ukrhydroenergo” (PJSC “Ukrhydroenergo” or UHE) has received financing from the World Bank (hereinafter referred to as the “Bank”) toward the cost of the Project “Ukraine – Improving Power System Resilience for European Power Grid Integration (Installation of Hybrid Systems for Electricity Production in Ukrhydroenergo)” and intends to apply part of the proceeds toward payments under the Contract. Under this Contract, UHE intends to make payments using the Direct Payment disbursement method, as defined in the World Bank Disbursement Guidelines for Investment Project Financing. 2. PJSC “Ukrhydroenergo” now invites eligible Bidders to submit Bids for the Contract. Bidders can bid for any one lot, more than one lot or all the four lots . The Time for Completion shall be between 420 and 510 calendar days from the Effective Date of the Contract. No credit will be given for early completion, and Bids offering a Time for Completion exceeding 510 days shall be rejected. 3. Prospective Bidders shall meet the following minimum qualification requirements: (a) General Experience: Experience in activities related to the design, supply and installation of equipment for energy infrastructure facilities, including generating facilities, battery energy storage systems (BESS), and MV and HV grids, under contracts in the role of contractor, subcontractor, or management contractor since at least January 2020. Design and construction experience may be from different contracts. (b) Financial Capabilities : The Bidder shall submit audited balance sheets or, if not required by the law of the Bidder’s country, other financial statements acceptable to UHE for the last five (5) fiscal years to demonstrate the current soundness of the Bidder’s financial position and its prospective long-term profitability.

(c) Average Annual Turnover:

The Bidder shall demonstrate a minimum average annual turnover for the last three (3) fiscal years as follows: Lot 1 – USD 36 million; Lot 2 – USD 51 million; Lot 3 – USD 46 million; Lot 4 – USD 20 million. Bidders submitting Bids for multiple Lots shall meet the cumulative average annual turnover requirements applicable to those Lots. The Bidder must demonstrate access to, or availability of, financial resources such as liquid assets, unencumbered real assets, lines of credit, and other financial means, other than any contractual advance payments, to meet the following minimum cash-flow requirements: Lot 1 – USD 9 million; Lot 2 – USD 13 million; Lot 3 – USD 12 million; Lot 4 – USD 5 million. Bidders submitting Bids for multiple Lots shall meet the combined financial resources requirements applicable to those Lots.

(d) Specific Experience:

(i) The Bidder shall demonstrate participation as contractor, joint venture member, subcontractor, or management contractor in at least two (2) contracts since 01.01.2020, each of which has been successfully and fully completed and has a minimum power and energy capacity of at least: Lot 1 – 35 MW / 35 MWh; Lot 2 – 50 MW / 50 MWh; Lot 3 – 48 MW / 48 MWh; Lot 4 – 20 MW / 20 MWh. Completion shall be based on obtaining of the Operational Acceptance Certificate, Commissioning Certificate, Taking Over Certificate, Commercial Operation Certificate, Facility Readiness Certificate, or equivalent documents demonstrating successful completion. The similarity of the contracts shall be based on experience in the design, supply and installation of Battery Energy Storage Systems, either as a stand-alone facility or as part of a larger power project, including but not limited to a hybrid renewable energy project. The referenced contracts shall demonstrate experience covering design, supply and installation of the relevant facility under the Bidder’s overall contractual responsibility. A Bidder submitting Bids for more than one Lot shall meet the specific experience requirement for the largest individual Lot for which it is bidding. The experience related to design could have been met even through a specialized subcontractor. (ii) For the contracts specified above and/or other relevant contracts, the Bidder shall demonstrate experience in, inter al

Context for bidders

We hold 3 notices from PRIVATE JOINT STOCK COMPANY “UKRHYDROENERGO”, going back to August 20261 of them still open. They buy mostly in Financial & Professional Services and Energy & Power. There are 100 open Energy & Power tenders in Ukraine. This one closes in 55 days.

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this energy & power opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Energy & Power tenders

All Energy & Power tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →