PRO005183-Works-Framework-Power Resilience

Issued by United Utilities Water Limited · via UK Find a Tender Service

Published
1 Oct 2026
Value
GBP 145,000,000
Reference
PRO005183
Location
United Kingdom
Sector
electrical-equipment
Type
works

Details

Ensuring power resilience across operational assets is a critical priority for United Utilities, with substantial investment expected to continue throughout the remainder of AMP8 and into AMP9. United Utilities is therefore exploring the establishment of a dedicated Power Resilience framework to provide a more integrated and efficient route for the delivery of power resilience solutions and associated services. The proposed approach seeks to consolidate requirements across multiple workstreams, improve commercial and operational efficiency, increase delivery agility, and provide a consistent contractual structure aligned to anticipated AMP8 & AMP9 requirements. The framework is expected to support a broad range of activities, including power resilience equipment supply, design and build services, LV and HV inspection and maintenance services, and Independent Connection Provider (ICP) services. Through this Preliminary Market Engagement (PME) exercise, United Utilities aims to gain insight into market capability, capacity, and supplier perspectives on the proposed scope, lot structure, and delivery approach. Lot 1 - Power Resilience Kit: • Design and installation of BESS / Generators • Including civil engineering ( plinths , trenching and containment) • DNO design interfaces, G99. G100 • Connection these assets and full commissioning • Act as CDM Designer and Principal Contractor Lot 2 – Power Resilience Design & Build: • Survey of sites from a power resilience perspective • Propose interventions, ranging from electrical fuse/timers, surge protection, UPS and BESS/ Generator systems • Design and install interventions, to industry standards such as BS7671 • Act as CDM Designer and Principal Contractor Lot 3 - LV Inspection, Testing & Remedial Works • Act as CDM Designer and Principal Contractor • Scheduling of inspections over a 5-year period across c4800 sites • Electrical inspection and test to BS7671 and 2391, including reports • Low Voltage (LV) remedial works: o Including civil engineering (plinths , trenching and containment) o Electrical installation to BS7671 o Material selection and design. o Electrical design Lot 4 - HV Maintenance, Inspection & Remedial Works • Act as CDM Designer and Principal Contractor • High Voltage (HV) maintenance on transformers , RMUs • HV remedial works: o Including civil engineering ( plinths , trenching and containment) o Cable jointing and electrical fitment o Material selection and design, substations, cable etc • Electrical design: o Fault protection studies o Harmonic studies o Earth fault studies • Provision of HV Senior Authorised Persons o For the purposes of : o In Day project support o Out of hours Standby Lot 5 - Electrical Connections (ICP) • Act as CDM Designer and Principal Contractor • Provide ICP (Independent Connections Provision) across LV HV and EHV projects

This notice has closed — what to do next

We hold 14 notices from United Utilities Water Limited, going back to August 2026 — 13 of them still open. They buy mostly in Water & Environment, Financial & Professional Services and Construction & Infrastructure. There are 12 open electrical-equipment tenders in United Kingdom.

Browse all open electrical-equipment tenders →

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this electrical-equipment opportunity. Always verify the details on the official source.

  • Confirm the closing date and submission window on the official portal before you start preparing your bid.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More electrical-equipment tenders

All electrical-equipment tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →