Pistons, Matched SE — Aircraft Landing Equipment
Issued by DEPT OF DEFENSE · DEFENSE LOGISTICS AGENCY · DLA AVIATION · DLA AVIATION PHILADELPHIA · DLA AVIATION AT PHILADELPHIA, PA · via SAM.gov — US federal contract opportunities
- Published
- 26 Sept 2026
- Closes
- 26 Oct 2026, 18:00 UTC
- Reference
- SPRPA126RYD37
- Location
- United States
- Sector
- space-satellite
Details
DEPT OF DEFENSE · DEFENSE LOGISTICS AGENCY · DLA AVIATION · DLA AVIATION PHILADELPHIA · DLA AVIATION AT PHILADELPHIA, PA is soliciting Pistons, Matched SE — Aircraft Landing Equipment. Solicitation number SPRPA126RYD37. Classified under NAICS 336413 — Other Aircraft Parts and Auxiliary Equipment Manufacturing. Product/service code 1710 — AIRCRAFT LANDING EQUIPMENT. Responses are due by 26 October 2026 18:00 UTC. Posted on SAM.gov, the US federal contract opportunities system; registration is required to bid.
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report (Combo)|Invoice 2in1|TBD|SPRPA1|TBD|TBD|SEE SCHEDULE|TBD|TBD|TBD|TBD|||||| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|[contact details removed] | VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 MONTHS|45 DAYS AFTER DISCOVERY OF DEFECT||||| SMALL BUSINESS SUBCONTRACTING PLAN (DEV 2026-O0037)(FEB 2026)|4||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (DEV 2026-O0042)(FEB 2026)|10|1|LOT 0001|14|570 days or sooner|DLA Weapons Support Philadelphia [contact details removed]|TBD|0001|30||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| NOTICE OF DISASTER OR EMERGENCY AREA SET-ASIDE (NOV 2007)|1|| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| DISASTER OR EMERGENCY AREA REPRESENTATION (NOV 2007)|1|| COST ACCOUNTING STANDARD NOTICES AND CERTIFICATION (DEV 2026-O0006)(FEB 2026)|1|| INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (DEV 2026-O0048)(MAR 2026)|2||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| ONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1|| EVALUATION OF FIRST ARTICLE TESTING|3|||x| Critical Safety Items (CSI), DFARS clause 252.209-7010, Identification of Critical Safety Items, is incorporated by reference. As applicable, DFARS clause 252.242-7005, Contractor Business Systems, is incorporated by reference. All potential offers shall provide newly manufactured spares only. Refurbished, remanufactured, or repaired material will not be acceptable;Offers for such are ineligible for award. Drawings are not available for this request for quotation. Offerors are advised that offers received from sources which are not government-approved sources of supply will be deemed technically unacceptable, and therefore ineligible for award. Any distributors of approved source(s) MUST submit a copy of their authorized distributor letter, on the source's letterhead, to the buyer point of contact indicated on the solicitation via email, at time of proposal submittal. Any clauses that do not apply are hereby self deleting. \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval Brochure. 1.4 Sampling rates (AQLs) indicated below shall be used in accordance with ANSI Z1.4 for Single Sampling and a General Inspection Level of II. 1.5 In addition to the 100% PCO Mandatory, critical and major characteristics, attributes for plating, hardness and non-destructive testing will be inspected one hundred percent. 1.6 Contractor shall develop a system for identification of individual piece parts for traceability purposes. Markings shall not be permanent. 1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and geometric feature controls with a tolerance range of .010 or less. 1.8 For minor characteristics, a sampling rate determined by the contractor and subject to QAR approval will be used. 1.9 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST; drawing number ( ;80020; ) ;626960-3; , Revision ;REV L; and all details and specifications referenced therein. 1.11 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.12 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS DRAWING DATA=MISC-482400-0025 |80020| D| |D| | | | DRAWING DATA=MPR 10 |80020| F| |D| | | | DRAWING DATA=MPR 1072 |80020| | |D| | | | DRAWING DATA=MPR 1075 |80020| | |D| | | | DRAWING DATA=MPR 1223 |80020| C| |D| | | | DRAWING DATA=MPR 45 |80020| D| |D| | | | DRAWING DATA=NAEC-ENG-6518 |80020|BP| |D| | | | DRAWING DATA=12-50303 |80020|AH| |D| | | | DRAWING DATA=14-41941 |80020| J| |D| | | | DRAWING DATA=14-50700 |80020|AA| |D| | | | DRAWING DATA=416774 |80020| C| |D| | | | DRAWING DATA=417241 |80020| K| |D| | | | DRAWING DATA=417242 |80020| L| |D| | | | DRAWING DATA=417245 |80020| M| |D| | | | DRAWING DATA=425250 |80020| G| |D| | | | DRAWING DATA=427738 |80020| C| |D| | | | DRAWING DATA=504657 |80020| W| |D| | | | DRAWING DATA=509441 |80020|AC| |C| | | | DRAWING DATA=524237 |80020| B| |D| | | | DRAWING DATA=524238 |80020| H| |D| | | | DRAWING DATA=524239 |80020| A| |D| | | | DRAWING DATA=524240 |80020| H| |D| | | | DRAWING DATA=524276 |80020| B| |D| | | | DRAWING DATA=524277 |80020| A| |D| | | | DRAWING DATA=614942 |80020| T| |D| | | | DRAWING DATA=615055 |80020| G| |D| | | | DRAWING DATA=622266 |80020| K| |D| | | | DRAWING DATA=626960-3 |80020| L| |D| | | | DRAWING DATA=626962 |80020| H| |D| | | | DRAWING DATA=626963 |80020| F| |D| | | | DRAWING DATA=626964 |80020| D| |D| | | | DRAWING DATA=627366 |80020| G| |D| | | | DRAWING DATA=627409 |80020| E| |D| | | | DRAWING DATA=628524 |80020| A| |D| | | | 3. REQUIREMENTS 1. Interim Inspection Requirements: The following item(s) requires an Interim Inspection at the contractor's location: a. P/N 626960-3, Piston Assembly - Matched Set (CSI): i. Witness of piston assembly weight requirement per Note 1 of Drawing 626960 (M101). ii. Witness of identification of piston assembly per Note 2 of Drawing 626960 (M102). iii. Witness of packaging requirements per Note 9 of Drawing 626960 (M104). b. P/N 14-50700-5, Spear (CSI): i. Witness of all major and critical dimensional inspections per Drawing 14-50700. ii. Witness of magnetic particle inspection per Drawing 14-50700. c. P/N 524238-1, Screw (CSI): i. Verification of material properties, heat treatment, and tensile strength per Note 2 of Drawing 524238 (M104). ii. Witness of hardness testing per Note 3 of Drawing 524238 (C1). iii. Witness of penetrant inspection per Note 4 of Drawing 524238 (C2). iv. Witness of all major and critical dimensional inspections per Drawing 524238. d. P/N 626963-1L/-1R, Connector Assembly (CSI): i. Verification of material properties per Note 3 of Drawing 626963 (C1). ii. Witness of magnetic particle inspection per Note 5 of Drawing 626963 (C2). iii. Witness of all major and critical dimensional inspections per Drawing 626963. e. P/N 626964-3L/-3R, Connector Assembly (CSI): i. Witness of assembly per Note 1 of Drawing 626964 (M101). f. P/N 627366-1, Barrel Assembly (CSI): i. Verification of material properties per Note 10 of Drawing 627366 (M129. ii. Witness of penetrant inspection per Note 11 of Drawing 627366 (M124). iii. Witness of ultrasonic inspection per Note 15 of Drawing 627366 (M125). iv. Witness of penetrant inspection per Note 19 of Drawing 627366 (M130). v. Witness of all major and critical dimensional inspections per Drawing 627366. 2. ALRE CSI parts require certification. a. When certified, an ALRE part is marked with a Material Identification Code (MIC). NAWCADLKE QA will provide the MIC to DCMA if the component is source accepted, and after receipt of all associated data. Application of MIC shall be in the same methodology as the drawing note for part marking, and in same area as part marking (next to, above, or below). 3. Receipt inspection and Certification of Sub-Components: a. P/Ns 14-50700-5, 524238-1, 626963-1L, 626963-1R, 626964-3L, 626964-3R, and 627366-1 will be certified and marked as directed by NAWCADLKE. 4. Receipt Inspection and Certification of the Top Assembly: a. The receipt Inspection and Certification of the Top Assembly, P/N 626960-3, shall occur during the final inspection. 5. Contractor Assist and Part Marking: a. The contractor shall assist on the conduct of the inspections (both final and interim) required that are necessary to certify the critical items specified herein. The contractor shall provide adequate facilities, inspection equipment, and skilled personnel, to support the NAWCADLKE Inspector in the conduct of the interim inspection(s). The contractor shall provide gauges, tools, fixtures, and jigs necessary to perform the inspections. The contractor shall also provide sufficient rigging/material handling services and manpower to setup/configure/operate equipment & machines used to accomplish the inspection task. This contractor assist requirement shall be applicable to 100% of the production quantities. As part of the MRI process, the NAWCADLKE QA representative will provide, in writing, a certification number along with direction for marking the Critical Safety Items (CSI). 4. QUALITY ASSURANCE QUALITY ASSURANCE REQUIREMENTS: 1. The solicitation/contract shall contain the NAWCADLKE inspection surveillance clause as follows: a. Because of the critical nature of this material, a representative of the Naval Air Warfare Center Aircraft Division Lakehurst (NAWCADLKE) is available to furnish technical assistance on Quality Assurance (QA) matters and shall have the option of conducting QA surveillance for the first lot produced under this contract (and all subsequent lots if necessary). This requirement will be performed in conjunction with the government QAS of the cognizant Defense Contract Management Activity and does not abrogate the authority or responsibility of the designated government QAS. The contractor agrees to notify [contact details removed], NAWC QA section Code BL41600,Lakehurst, NJ 08733-5035 and the PCO when the material is scheduled to be presented to the DCMA government QAS for Government inspection and acceptance. This notice shall afford the NAWCADLKE QA representative the option of being present during the inspection. A minimum of fourteen (14) working days is required to arrange the surveillance visit. Notification shall include the following information: Company Name, Cage Code, Phone number, Fax number, Contract number, Point of Contact, Part Nomenclature, Part Number, NIIN, Type of Inspection, and Quantity of parts. b. Due to the critical nature of this item, it is necessary to conduct in-process inspections on critical component features, attributes, or manufacturing processes. The contractor agrees to notify [contact details removed], NAWC QA section Code BL41600, Lakehurst, NJ 08733-5035 and the PCO when material is scheduled for the interim inspection(s) that are identified herein. This notice shall afford the NAWCADLKE QA representative the option of being present during the inspection. A minimum of seven(7) working days is required to arrange the surveillance visit. Notification shall include the following information: Company Name, Cage Code, Phone number, Fax number, Contract number, Point of Contact, Part Nomenclature, Part Number, NIIN, Type of Inspection, andQuantity of parts. 2. The contractor shall perform Quality Conformance and Lot Sampling Inspection for all associated features that are present in the drawings and specifications: a. Features/attributes/requirements classified as Critical and Major on the drawing(s) or within the technical specification shall be inspected and shall have the actual dimensions documented 100%; b. Attributes for plating, hardness, and non-destructive testing shall be inspected 100%; c. Class 3 Threads, dimensions, and geometric feature controls with a tolerance range of .010 or less shall be inspected using an AQL of 1.5 and the General Inspection Level II as defined by ANSI Z1.4 d. Minor Characteristics: Sampling shall be inspected using an AQL of 4.0 and the General Inspection Level II as defined by ANSI Z1.4. 3. The material covered in this contract/purchase order will be used in a crucial shipboard system supporting the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems, or loss of aircraft. Therefore, the material has been designated as Critical Safety Item (CSI) material and special control procedures are invoked to ensure receipt of correct material. 4. First Article Testing: The contractor shall conduct First Article testing on this item of ALRE/SE and must address all elements listed below and prepare a First Article Test Report documenting the outcome. Unless otherwise specified, the report and its acceptance shall be per the provisions of the applicable Contract Data Requirements List (CDRL). a. Requirements: i. First Article quantity is one (1); in uncoated condition. ii. The First Article shall be available for Government evaluation per the contract schedule. The Evaluation shall be conducted in the presence of the Government personnel. Accordingly, the contractor shall allow time to arrange for NAWC participation in accordance with the "NAWCADLKE Inspection Witness Option"; iii. The contractor shall provide facilities and personnel sufficient to conduct all necessary tests to establish conformance; iv. The contractor shall have available for review all certifications, test reports, in-process inspection documents needed to substantiate product quality; this same documentation shall also be included in the First Article test report; v. The contractor shall, at the time of First Article, have corrected any problem areas deemed significant and documented as deficient by the Government within his/her Quality Assurance system not previously identified during prior evaluations and/or surveys; any problems identified during the conduct of the test will also require correction. b. Testing and evaluation: i. The contractor shall accomplish 100% inspection and/or testing of all critical, major, and minor dimensions and/or requirements identified in the drawings, drawing notes, and process and fabrication specifications. Results shall consist of actual dimensions, measurements, and test outcomes and shall be recorded and included in the First Article test report. c. Acceptance/reject criteria: i. Satisfactorily meeting all requirements cited in the First Article Testing "Requirements" paragraph above and satisfactorily demonstrating 100% conformance to the test and evaluation elements cited in the First Article Testing "Testing and evaluation" paragraph above shall constitute acceptance of the First Article; ii. Failure to meet any of the conditions in the First Article Testing "Requirements" paragraph above or the First Article Testing "Testing and evaluation" paragraph above shall be cause for rejection. d. Delivery: i. The accepted First Article exhibit may be delivered and counted along with the contract production quantities providing the item has not been damaged during testing, and has been found to be conforming; ii. The contractor is responsible for preparing the First Article Test Report in accordance with CDRL's. 5. Production Lot Special Tests: N/A 6. For purposes of this TDR, the term NDT shall refer to the following methods: MT - Magnetic Particle Testing, PT - Penetrant Inspection, UT - Ultrasonic Testing, RT - Radiographic Testing, and VT - Visual Testing. 7. Companies performing NDT shall be NADCAP accredited, or a laboratory accredited by one of the organizations listed below as satisfying ISO 17025 (General requirements for the competence of testing and calibration laboratories). NDT certificates shall bear the symbols of accreditation and the accreditation body. a. American Association for Laboratory Accreditation (A2LA) b. ANSI National Accreditation Board (ANAB) c. International Accreditation Service, Inc. (IAS) d. National Voluntary Laboratory Accreditation Program (NVLAP) e. Perry Johnson Laboratory Accreditation, Inc. (PJLA) f. Canadian Association for Laboratory Accreditation Inc. (CALA) g. Standards Council of Canada (SCC) 4.1 Review documentation as provided under DD 1423 requirements. 4.2 CRITICAL MANUFACTURING PROCESSES ( ;Applies; ) HEAT TREAT ( ;Applies; ) WELDING ( ; ; ) CADMIUM PLATING ( ;Applies; ) ENGINEERING CHROME PLATING ( ; ; ) NICKEL CHROME PLATING ( ;Applies; ) CASTING(S) ( ; ; ) FORGING(S) ( ;Applies; ) MPR (MATERIAL PROCESSING REQUIREMENTS) 4.3 The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below 4.3.1 Dimensional test (special) ;CLOSE MACHINE TOLDERANCES; 4.3.2 Requirements of: ;LKE DRAWING PACKAGE; 4.3.3 Form ;APPLIES; 4.3.4 Fit ;N/A; 4.3.5 Function ;N/A; 4.3.6 Compliance with drawing ( ;80020; ) ;626960; , Revision ;L; and specifications referenced therein. 4.4 In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements 4.5 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection 4.6 The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing. 4.6.1 The QAR shall be present to witness all First Article Testing. 4.6.2 The following additional personnel shall witness the First Article Testing: ;DCMA QAR; 4.7 Disposition of FAT samples 4.7.1 ; ; Sample(s) may be destroyed during testing. 4.7.2 ;APPLIES; Unless otherwise provided for in the contract, sample(s) shall remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s) have inspection approval of the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment. 4.8 Test Sample Coating Instructions 4.8.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required. 4.9 Notice to Government of Testing at the contractors facility. 4.9.1 FAR 52.209-3 applies (A) The contractor shall present ;ONE; ; unit(s) of the following CAGE( ;80020; ; ), Part Number ;626960-3; ; , Revision ;L; ; as specified in this contract. At least fourteen (14) calendar days before the beginning of the First Article testing, the contractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests. (B) The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;PCO; ; The contractor shall mark the report "First Article Test Report" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements. (C) Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional approval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for disapproval. (D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First Article or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified in paragraph B above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests. (E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract. (F) Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for acceptance. (G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay. (H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be allocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair of the First Article during any First Article test. (I) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article. (J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on Form DD1222 (2 copies) which shall be forwarded with the test report. Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test report. 4.10 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate) (A) Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that: (I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and (II) the production location to be used for this requirement is the same as used for the previous production run. Additionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that: (I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer, and (II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause. (NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.) (B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and one that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First Article Approval Requirements (C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the government notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule he offers to the government. Offeror's Proposed Alternate Delivery Schedule (Based on waiver of First Article Approval Requirements) Within Days: Item No. _____________ Quantity:_______ After Date of Contract:_________ 4.11 . Mandatory Inspection Requirements: 100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR). During production, mandatory inspection is required to be accomplished by the contractor as follows: A. Level of Inspection (LOI). 1. Critical characteristics: 100% inspection shall apply. 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR. B. Critical characteristics: ;JOSE TORRACA NAWCADLKE QA REP / Tel: [contact details removed] E-mail: [contact details removed]; C. Major and Minor characteristics 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications. 4.12 SPECIAL INSPECTION REQUIREMENTS ( ;Applies; ) MAGNETIC PARTICLE INSPECTION ( ;Applies; ) SURFACE INSPECTION ( ;Applies; ) PENETRANT INSPECTION ( ;Applies; ) RADIOGRAPHIC INSPECTION ( ;Applies; ) ULTRSONIC INSPECTION ( ; ; ) HIGH SHOCK TEST ( ; ; ) MECHANICAL VIBRATION TEST 4.13 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying office/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of witnessing the final inspection. The contractor shall notify by email or TELEFAX PCO and NAWC Lakehurst QA ;JOSE TORRACA NAWCADLKE QA REP / Tel: [contact details removed] E-mail: [contact details removed]; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units. 4.14 IN PROCESS INSPECTION REQUIREMENTS: Due to the critical nature of this item it is necessary to conduct in-process inspections on critical component features, attributes, or manufacturing processes. The contractor shall notify the PCO and NAWC via email or TELEFAX PCO and NAWC Lakehurst QA ;JOSE TORRACA NAWCADLKE QA REP / Tel: [contact details removed] E-mail: [contact details removed]; to arrange for the in-process inspection. A minimum of 10 days is needed for advance notice for each occurrence. The authority of the QAR shall not be abrogated. The QAR shall verify that timely notification was given all parties listed below. CHARACTERISICS TO BE INSPECTED: ; ; ; ; ; ; ; ; ; ; ; ; 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE THIS IS AN ALRE CRITICAL SAFETY ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET. NAVSUP REFERENCE ONLY: PROCUREMENT TDR (26-10010): THE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS "CRITICAL" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMBMITTED AND BEEN APPROVED WILL BE ELIGIBLE FOR AWARD UNDER THIS SOLICITATION. ANY COMPANY MAY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED IN THIS SOLICITATION. All records pertaining to ALRE CSI/CAI manufacture and inspection/test shall be provided to the ALRE Cognizant Technical Authority. All records shall be maintained by LKE QA and by the manufacturer for a period of seven years. DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS: (BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with delivery of FAT Items. Inspection/Certification data needed to substantiate the Quality of the First Article Test unit shall be includedin First Article unit packaging. The outside of the package that contains the data shall be clearly marked "INSPECTION/CERTIFICATIONDATA INCLUDED". Data Requirements: a. Copies of all approved requests for variations. b. Piston assembly weight requirement per Drawing 626960. c. Identification, including photos of all part identifiers, per Drawing 626960, 12-50303, 14-50700, 416774, 417241, 417242, 417245, 425250, 427738, 504657, 509441, 524237, 524238, 524239, 524240, 524276, 524277, 614942, 615055, 622266, 626962, 626963, 626964, 627366, 627409, 628524. d. Assembly and torque per Drawing 626960, 425250, 615055, 626964, 627366, 628524. e. Packaging and/or storage per Drawing 626960, 12-50303, 417245, 504657, 615055. f. Manufacturing and testing per Drawing 14-41941, 14-50700. g. Dimensional inspection per Drawing 14-41941, 12-50303, 14-50700, 416774, 417241, 417242, 417245, 425250,427738, 504657, 509441, 524237, 524238, 524239, 524240, 524276, 524277, 614942, 622266, 626962, 626963,627366, 627409. h. Testing per Drawing 14-41941. i. Surface finish of bare metal per Drawing 12-50303, 14-50700, 417241, 417242, 417245, 425250, 427738, 504657,504657, 524238, 524240, 614942, 622266, 626962, 626963, 627366, 627409 j. Heat treatment per Drawing 12-50303, 416774, 427738, 504657, 509441, 524239, 524240, 524276, 524277, 614942, 627409. k. Hardness measurements per Drawing 12-50303, 417241, 417242, 504657, 509441, 524238. l. Magnetic particle inspection per Drawing 12-50303, 417241, 417242, 417245, 425250, 504657, 509441, 614942, 626963, 627409. m. Material properties per Drawing 12-50303, 416774, 417241, 417242, 417245, 425250, 427738, 504657, 509441, 524237, 524238, 524239, 524240, 524276, 524277, 614942, 622266, 626962, 626963, 627366, 627409. n. Penetrant inspection per Drawing 416774, 427738, 524237, 524238, 524239, 524240, 524276, 524277, 622266, 626962, 627366. o. Spring data per Drawing 416774. p. Design requirements per Drawing 509441, 524238. q. Thread dimensions and designations per Note 2 of Drawing 524237 and per Note 4 of Drawing 627366. Documentation shall include verification that the pitch and functional diameters were 100% inspected in accordance with System 22 of FED-STD-H28/20. r. Part configuration per Drawing 524239, 524240, 524276. s. Welding per Drawing 614942, 626964, 628524. t. Radiographic inspection per Drawing 614942, 626962. u. Laser hardening per Drawing 626963. v. Ultrasonic inspection per Drawing 627366. w. Shot peening per Drawing 627366. DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS: (BLOCK 12) DATE OF FIRST SUBMISSION: Concurrently with Final Inspection. Data Requirements a. Copies of all approved requests for variations. b. Piston assembly weight requirement per Drawing 626960. c. Identification, including photos of all part identifiers, per Drawing 626960, 12-50303, 14-50700, 416774, 417241, 417242, 417245, 425250, 427738, 504657, 509441, 524237, 524238, 524239, 524240, 524276, 524277, 614942, 615055, 622266, 626962, 626963, 626964, 627366, 627409, 628524. d. Assembly and torque per Drawing 626960, 425250, 615055, 626964, 627366, 628524. e. Packaging and/or storage per Drawing 626960, 12-50303, 417245, 504657, 615055. f. Manufacturing and testing per Drawing 14-41941, 14-50700. g. Dimensional inspection per Drawing 14-41941, 12-50303, 14-50700, 416774, 417241, 417242, 417245, 425250, 427738, 504657, 509441, 524237, 524238, 524239, 524240, 524276, 524277, 614942, 622266, 626962, 626963, 627366, 627409. h. Testing per Drawing 14-41941. i. Surface finish of bare metal per Drawing 12-50303, 14-50700, 417241, 417242, 417245, 425250, 427738, 504657, 504657, 524238, 524240, 614942, 622266, 626962, 626963, 627366, 627409. j. Plating per Drawing 12-50303, 504657. k. Heat treatment per Drawing 12-50303, 416774, 427738, 504657, 509441, 524239, 524240, 524276, 524277, 614942, 627409. l. Hardness measurements per Drawing 12-50303, 417241, 417242, 504657, 509441, 524238. m. Magnetic particle inspection per Drawing 12-50303, 417241, 417242, 417245, 425250, 504657, 509441, 614942, 626963, 627409. n. Material properties per Drawing 12-50303, 416774, 417241, 417242, 417245, 425250, 427738, 504657, 509441, 524237, 524238, 524239, 524240, 524276, 524277, 614942, 622266, 626962, 626963, 627366, 627409 o. Penetrant inspection per Drawing 416774, 427738, 524237, 524238, 524239, 524240, 524276, 524277, 622266, 626962, 627366. p. Spring data per Drawing 416774. q. Nitride per Drawing 417241, 417242, 417245. r. Coating per Drawing 425250, 614942, 626963, 627409. s. Anodize per Drawing 622266. t. Design requirements per Drawing 509441, 524238. u. Thread dimensions and designations per Note 2 of Drawing 524237 and per Note 4 of Drawing 627366. Documentation shall include verification that the pitch and functional diameters were 100% inspected in accordance with System 22 of FED-STD-H28/20. v. Part configuration per Drawing 524239, 524240, 524276. w. Welding per Drawing 614942, 626964, 628524. x. Radiographic inspection per Drawing 614942, 626962. y. Laser hardening per Drawing 626963. z. Ultrasonic inspection per Drawing 627366. aa. Shot peening per Drawing 627366. DATE OF FIRST SUBMISSION=090 DAC 16. REMARKS: (Block 5) Data Requirements: a. Weld procedure IAW NAVSEA S9074-AR-GIB-010/278 Revision NONE, para 4.2 per Drawing 614942, 626964, 628524. (Block 13) DATE OF SUBSEQUENT SUBMMISION: Approval or reason for disapproval shall be given by NAVAIRWARCENACDIVLKE via the P.C.O. NLT 45 days after disapproval. (Block 14) Addresses for NAVAIR Codes: NAVAIRWARCENACDIVLKE Code BL14000 Bldg 596 HWY 547 JOINT BASE MDL, NJ 08733-5000 NAVAIRWARCENACDIVLKE Code BL32300 Bldg 562 HWY 547 JOINT BASE MDL, NJ 08733-5000 NAVAIRWARCENACDIVLKE Code BL41600 Bldg 148 HWY 547 JOINT BASE MDL, NJ 08733-5000 DATE OF FIRST SUBMISSION=090 DAC 16. REMARKS: (Block 4) AUTHORITY (Data Acquisition Document No.): DI-MISC-80876 (Block 5 ) Data Requirements a. The Weld Procedure Qualification Test Report, including all supporting test reports and documentation, IAW NAVSEA S9074-AQ-GIB-010/248 Revision 1, para 4.2.3 and 4.6 Drawing 614942, 626964, 628524. (Block 13) DATE OF SUBSEQUENT SUBMMISION: Approval or reason for disapproval shall be given by NAVAIRWARCENACDIVLKE via the P.C.O. NLT 45 days after disapproval. (Block 14) Addresses for NAVAIR Codes: NAVAIRWARCENACDIVLKE Code BL14000 Bldg 596 HWY 547 JOINT BASE MDL, NJ 08733-5000 NAVAIRWARCENACDIVLKE Code BL32300 Bldg 562 HWY 547 JOINT BASE MDL, NJ 08733-5000 NAVAIRWARCENACDIVLKE Code BL41600 Bldg 148 HWY 547 JOINT BASE MDL, NJ 08733-5000 DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS: (Block 5) CONTRACT REFERENCE: a. Evidence of Welder Performance Qualification, including supporting test results anddocumentation, IAW NAVSEA S9074-AQ-GIB-010/248 Revision 1, para 5.2 perDrawing 614942, 626964, 628524. (Block 12) DATE OF FIRST SUBMISSION ? 30 days prior to production. (Block 13) Provide qualification evidence for all welders. (Block 14) Addresses for NAVAIR Codes: NAVAIRWARCENACDIVLKE Code BL32300 Bldg 562 HWY 547 JOINT BASE MDL, NJ 08733-5000 NAVAIRWARCENACDIVLKE Code BL41600 Bldg 148 HWY 547 JOINT BASE MDL, NJ 08733-5000 DATE OF FIRST SUBMISSION=090 DAC (Block 5) CONTRACT REFERENCE: a. Evidence of Level III Certification IAW T9074-AS-GIB-010/271^ para 1.6 for the individual who approved the Welders Qualification Training Program IAW NAVSEAS9074-AQ-GIB-010/248 para 5.2.3.1, per Drawing 614942, 626964, 628524. (Block 14) Addresses for NAVAIR Codes: NAVAIRWARCENACDIVLKE Code BL32300 Bldg 562 HWY 547 JOINT BASE MDL, NJ 08733-5000 NAVAIRWARCENACDIVLKE Code BL41600 Bldg 148 HWY 547 JOINT BASE MDL, NJ 08733-5000 DATE OF FIRST SUBMISSION=090 DAC 16. REMARKS: (Block 5) CONTRACT REFERENCE: a. Visual Inspection Written Procedure to be used to visually inspect all welds IAW T9074-AS-GIB-010/271^ para 8.3 and 1.7 thru 1.7.3 per Drawing 614942, 626964, 628524. (Block 14) Addresses for NAVAIR Codes: NAVAIRWARCENACDIVLKE Code BL32300 Bldg 562 HWY 547 JOINT BASE MDL, NJ 08733-5000 NAVAIRWARCENACDIVLKE Code BL41600 Bldg 148 HWY 547 JOINT BASE MDL, NJ 08733-5000 DATE OF FIRST SUBMISSION=090 DAC 16. REMARKS: (Block 5) CONTRACT REFERENCE: a. Evidence of approval of the Welder Qualification Training Program IAW NAVSEAS9074-AQ-GIB-010/248 Revision 1, para 5.2.3.1(d), per Drawing 614942, 626964, 628524. (Block 14) Addresses for NAVAIR Codes: NAVAIRWARCENACDIVLKE Code BL32300 Bldg 562 HWY 547 JOINT BASE MDL, NJ 08733-5000 NAVAIRWARCENACDIVLKE Code BL41600 Bldg 148 HWY 547 JOINT BASE MDL, NJ 08733-5000 DATE OF FIRST SUBMISSION=090 DAC 16. REMARKS: (Block 5) CONTRACT REFERENCE: b. Evidence of Maintenance of Qualification for all welders IAW NAVSEA S9074-AQGIB-010/248 Revision 1, para 5.2.11 and 5.2.12 per Drawing 614942, 626964, 628524. (Block 14) Addresses for NAVAIRCodes NAVAIRWARCENACDIVLKE Code BL32300 Bldg 562 HWY 547 JOINT BASE MDL, NJ 08733-5000 NAVAIRWARCENACDIVLKE Code BL41600 Bldg 148 HWY 547 JOINT BASE MDL, NJ 08733-5000 DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS: (Block 5) CONTRACT REFERENCE: a. Radiographic Inspection of casting IAW T9074-AS-GIB-010/271^ per Drawing 626962. (Block 12) DATE OF FIRST SUBMISSION: Prior to Machining. (Block 14) Addresses for NAVAIR Codes: NAVAIRWARCENACDIVLKE Code BL41600 Bldg 148 HWY 547 JOINT BASE MDL, NJ 08733-5000 DATE OF FIRST SUBMISSION=090 DAC 16. REMARKS: (Block 5) CONTRACT REFERENCE: a. Radiographic Inspection of welds IAW T9074-AS-GIB-010/271^ per Drawing 614942. (Block 14) Addresses for NAVAIR Codes: NAVAIRWARCENACDIVLKE Code BL41600 Bldg 148 HWY 547 JOINT BASE MDL, NJ 08733-5000 DATE OF FIRST SUBMISSION=030 DAC 16. REMARKS: Data Requirements (Block 2) Title of Data Item: Proposed Critical Manufacturing Process Description (Block 3)Subtitle: Description of Forming Process and Heat Treatment for Barrel (Block 4) Data Acquisition Document No: DI-SESS-81012 (Block 5) Contract Reference: Para 3.2.1 of NAWCADLKE-MISC-482400-0025 DATE OF FIRST SUBMISSION=030 DAC 16. REMARKS: (Block 5) CONTRACT REFERENCE: Para 3.2.2 of NAWCADLKEMISC-482400-0025 (Block 12) Date for First Submission: 30 DAC. Next submissionrequired when manufacturing plan has been revised, NLT 15 daysbefore the original date of the affected milestone. DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS: (Block 3) Production Progress Report. (Block 4) AUTHORITY (Data Acquisition Document No.): DI-MGMT-80034 (Block 5) CONTRACT REFERENCE: Para 3.2.2.2 of NAWCADLKEMISC-482400-0025 (Block 12) Date for First Submission: 30 days after start of production. (Block 13) Date of Subsequent Submission: Subsequent reports to be submitted no later than the 5th day of the month (for the month proceeding). Local DCASMA verification required on all status reports. DATE OF FIRST SUBMISSION=090 DAC 16. REMARKS: (Block 2) Hazardous Materials Management Program (HMMP) Plan (Block 4) AUTHORITY (Data Acquisition Document No.): DI-MGMT-81398 (Block 5) Contract Reference: Para 3.7.3 of NAWCADLKE-MISC-482400-0025 Approval or reason for disapproval shall be given no later than 30 days after receipt by the NAVAIRWARCENACDIVLKE. DATE OF FIRST SUBMISSION=090 DAC 16. REMARKS: (Block 2) TITLE OF DATA ITEM: Hazardous Materials Management Program (HMMP) Report (Block 4) AUTHORITY (Data Acquisition Document No.): DI-MISC-81397 (Block 5) CONTRACT REFERENCE: Para 3.7.4 of NAWCADLKEMISC-482400-0025 DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ 16. REMARKS: (Block 4) AUTHORITY (Data Acquisition Document No.): DI-CMAN-80639 (Block 5) CONTRACT REFERENCE: Para 3.8 of NAWCADLKEMISC-482400-0025 (Block 14) Distribution: DD1998 signed by the cognizant DCMAO representative shall be submitted with Engineering Change Proposal to NAVAIRWARCENACDIVLKE Code BL14000 Block 6: Forward additional copy to ASO code cited in block 10.A on page 1. 1.This Data Item Description (DID) contains the format, content and preparation instructions for the data product resulting from the work task described in paragraphs 5.4.2.3.5 and 5.4.2.4.1, or 5.4.8.2.1 of MIL-STD-973. This DID is used in conjuction with a Notice of Revision (NOR), DI-CMAN-80642B and/or a Specification Change Notice (SCN), DI-CMAN-80643B. A requirement for NORs and SCNs, as applicable, should be contractually imposed in conjunction with this DID. 2. Format and Content: The Engineering Change Proposal format and content shall be in accordance with Apendix D of MIL-STD-973. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ 16. REMARKS: (Block 5) CONTRACT REFERENCE: Para 3.8 of NAWCADLKEMISC-482400-0025 (Block 14) Distribution: DD1998 signed by the cognizant DCMAO representative shall be submitted with Request for Deviation to NAVAIRWARCENACDIVLKE Code BL14000 1. This DID supercedes DI-CMAN-80640B and DI-CMAN-80641B 2.A Request for Deviation describes a proposed departure from a nonconformance with the contractually-specified configuration documentation for a specific number of units or for a specified period of time. 3.Format and content. The Request for Deviation (RFD) shall be prepared in contractor format. The RFD content shall include the consideration to be provided if the government accepts the deviation and, where applicable, the following information: a. A complete description of the contract requirement affected and the nature of the deviation (non-conformance b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares,tools, and similar) being utilized by government personnel or to the operational use of the product. d.Information about remedial actions being taken to prevent reoccurrence of the non-conformance. The following references may be useful in defining content: MIL-HDBK-61, Configuration Management Guidance (paragraph 4.3 and Table 4-9 ANSI/EIA-649-1998, National Consensus Standard for Configuration Management (paragraph 5.3.4). DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ 16. REMARKS: (Block 5) CONTRACT REFERENCE: Para 3.8 of NAWCADLKEMISC-482400-0025 (Block 14) Distribution: DD1998 signed by the cognizantDCMAO representative shall be submitted with Request for Waiverto NAVAIRWARCENACDIVLKE Code BL14000 Block 6: Forward additional copy to ASO code cited in block 10.A on page 1. 1. This Data Item Description (DID) contains the format, content, and preparation instructions for the data product resulting from the work task described in paragraph 5.4.4.4 or 5.4.8.4.3 of MIL-STD-973. 2. Copies of the Request for Waiver form are available from the DODSSP, Standardization Documents Order Desk, Building 40, 700 Robbins Avenue, Philadephila, PA 19111-5094. 3. Format and content: The Request for Waiver format and content shall be in accordance with Appendix E of MIL-STD-973. DATE OF FIRST SUBMISSION=045 DAC 16. REMARKS: (Block 2) TITLE OF DATA ITEM: Product Assurance Quality Program Plan (Block 5) CONTRACT REFERENCE: Para 4.2.1.1 of NAWCADLKEMISC-482400-0025 Approval or reason for disapproval shall be no later than 30 days after receipt by the NAVAIRWARCENACDIVLKE. DATE OF FIRST SUBMISSION=045 DAC 16. REMARKS: (Block 4) AUTHORITY (Data Acquisition Document No.): DI-QCIC-81110 (Block 5) CONTRACT REFERENCE: Para 4.2.1.2 of NAWCADLKEMISC-482400-0025 Approval or reason for disapproval shall be no later than 30 days after receipt by the NAVAIRWARCENACDIVLKE. DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS: (Block 5) CONTRACT REFERENCE: Para 4.2.1.3, 4.3.1, and 4.3.2 of NAWCADLKEMISC-482400-0025 (Block 12) Date of First Submission: Report shall be submitted 30 Days prior topart delivery to the NAVAIRWARCENACDIVLKE. Approval or reason for disapproval shall be no later than 30 days after receipt by the NAVAIRWARCENACDIVLKE. DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS: (Block 2) Title: Quality Conformance Inspection & Test Procedures (Block 3) Subtitle: Manufacturer's First-Article and Production Inspection Procedure (Block 5) CONTRACT REFERENCE: Para 4.3.1.1 and 4.3.2.1 of NAWCADLKE-MISC- 482400-0025 (Block 12) Date of First Submission: 45 DAC for First Article Inspection Procedure and 120 DAC for Production Inspection Procedure. Approval or reason for disapproval shall be no later than 30 days after receipt by the NAVAIRWARCENACDIVLKE. DATE OF FIRST SUBMISSION=045 DAC 16. REMARKS: (Block 4) AUTHORITY (Data Acquisition Document No.): DI-QCIC-80906 (Block 5) CONTRACT REFERENCE: Para 4.4 of NAWCADLKEMISC-482400-0025 DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS: (Block 2) TITLE OF DATA ITEM: Certification Data for Non-Nuclear Level I Material (Block 3) SUBTITLE: Reports for Chemical and Mechanical Properties (Block 4) AUTHORITY (Data Acquisition Document No.): DI-MISC-81020 (Block 5) CONTRACT REFERENCE: Para 4.5 of NAWCADLKEMISC-482400-0025 (Block 12) Date of First Submission: 15 days after receipt of materialat manufacturer?s facility. Submission required prior to utilizingmaterial for manufacture. (Block 13) Date of Subsequent Submission: 30 Days prior to partdelivery to NAVAIRWARCENACDIVLKE. Reports are to be prepared for all Chemical Composition and Mechanical Properties tests, including the following tests, which arespecifically addressed in Report No. NAWCADLKE-MISC-4842400-0025; Paragraphs: 4.5.1.1 Tensile Tests (for Barrel) 4.5.1.2 Fracture Toughness Tests (for Barrel) 4.5.1.3 Axial Fatigue Tests (for Barrel) 4.5.1.4 Fatigue Crack Growth Rate Tests (for Barrel) 4.5.3.1 Tensile Tests (for Blank Plate) 4.5.3.2 Fracture Toughness (for Blank Plate) 4.5.5 Mechanical Property Tests (for Inconel Fasteners) DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS: (Block 3) SUBTITLE: Reports for Non-destructive Tests and Shot Peening (Block 5) CONTRACT REFERENCE: Para 4.5 of NAWCADLKEMISC-482400-0025 (Block 12) Date of First Submission: Report shall be submitted 30Days prior to part delivery to NAVAIRWARCENACDIVLKE. Reports are to be prepared for all Non-Destructive Tests and ShotPeening, including the following tests which are specifically addressedin Report No. NAWCADLKE-MISC-4842400-0025; Paragraphs: 4.5.2.1 Ultrasonic Inspection (for Barrel) 4.5.2.2 Liquid Penetrant Inspection (for Barrel) 4.5.2.3 Liquid Penetrant Inspection for Special Areas At ForwardLug (for Barrel) 4.5.2.4 Test and Inspections for Shot Peened Surfaces (for Barrel) 4.5.4.1 Liquid Penetrant Inspection (for Blank Plate) 4.5.6.1 Liquid Penetrant Inspection (for Inconel Fasteners) DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS: (Block 3) SUBTITLE: Inspection Report for Special Characteristics on Barrel, Connector, and Sealing Strip Guide (Block 4 Barrel) Authority: Pages 3 and 4 of Report No. NAECENG-6518 for forms. Pages 1, 2, and 2A of Report No. NAECENG-6518 for instructions. (Block 4 Connector) Authority: Pages 7 and 8 of Report No.NAEC-ENG-6518 for forms. Pages 1, 2, and 2A of Report No.NAEC-ENG-6518 for instructions. (Block 4 Sealing Strip Guide) Authority: Page 9 of Report No.NAEC-ENG-6518 for forms. Pages 1, 2, and 2A of Report No.NAEC-ENG-6518 for instructions. (Block 5) CONTRACT REFERENCE: Para 4.6 of NAWCADLKEMISC-482400-0025, Note 4, Drawing 626963, and Note 4, Drawing 627409 (Block 12) Date of First Submission: 30 Days prior to part delivery. (Block 13) Date of Subsequent Submission: Reports shall accompany piston assy.
Context for bidders
We hold 187 notices from DEPT OF DEFENSE · DEFENSE LOGISTICS AGENCY · DLA AVIATION · DLA AVIATION PHILADELPHIA · DLA AVIATION AT PHILADELPHIA, PA, going back to August 2026 — 110 of them still open. They buy mostly in space-satellite, Manufacturing & Supply and electronics-semiconductors. There are 527 open space-satellite tenders in United States. This one closes in 31 days.
More from this buyer
- Coupling, Refueling — Miscellaneous Aircraft Accessories and Components· closes 26 Oct
- Wing Station Contro — Miscellaneous Aircraft Accessories and Components· closes 26 Oct
- Panel, Control, Elect — Electrical Control Equipment· closes 26 Oct
- Initiator, Propellan — Cartridge & Propellant Devices· closes 26 Oct
- Recorder, Flight DAT — Flight Instruments· closes 26 Oct
Similar space-satellite tenders
- Door, Aircraft — Airframe Structural Components· closes 26 Oct
- Command Station, Oil — Aircraft Launching Equipment· closes 26 Oct
- Flight Management C — Miscellaneous Aircraft Accessories and Components· closes 26 Oct
- Wing Station Contro — Miscellaneous Aircraft Accessories and Components· closes 26 Oct
- Coupling, Refueling — Miscellaneous Aircraft Accessories and Components· closes 26 Oct
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this space-satellite opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More space-satellite tenders
- Command Station, Oil — Aircraft Launching EquipmentDEPT OF DEFENSE · DEFENSE LOGISTICS AGENCY · DLA AVIATION · DLA AVIATION PHILADELPHIA · DLA AVIATION AT PHILADELPHIA, PA · United States
- Coupling, Refueling — Miscellaneous Aircraft Accessories and ComponentsDEPT OF DEFENSE · DEFENSE LOGISTICS AGENCY · DLA AVIATION · DLA AVIATION PHILADELPHIA · DLA AVIATION AT PHILADELPHIA, PA · United States
- Wing Station Contro — Miscellaneous Aircraft Accessories and ComponentsDEPT OF DEFENSE · DEFENSE LOGISTICS AGENCY · DLA AVIATION · DLA AVIATION PHILADELPHIA · DLA AVIATION AT PHILADELPHIA, PA · United States
- Door, Aircraft — Airframe Structural ComponentsDEPT OF DEFENSE · DEPT OF THE NAVY · NAVSUP · NAVSUP WEAPON SYSTEMS SUPPORT · NAVSUP WSS PHILADELPHIA · NAVSUP WEAPON SYSTEMS SUPPORT · United States
- Flight Management C — Miscellaneous Aircraft Accessories and ComponentsDEPT OF DEFENSE · DEFENSE LOGISTICS AGENCY · DLA AVIATION · DLA AVIATION PHILADELPHIA · DLA AVIATION AT PHILADELPHIA, PA · United States
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →