OMH South Beach Psychiatric Center Rehab of Auditorium in Building 8 and Asbestos Abatement
Issued by Dormitory Authority of the State of New York (DASNY) · via Dormitory Authority of the State of New York — RFPs and bids
- Published
- 3 Oct 2026
- Closes
- 31 Mar 2028
- Location
- United States
- Sector
- Construction & Infrastructure
Details
OMH South Beach Psychiatric Center Rehab of Auditorium in Building 8 and Asbestos Abatement
Solicitation #: 376600 Issue Date: 10/01/2026 Proposal Due: 10/29/2026 - 2:00 PM Classification: Construction Contracts Type: Expression of Interest (EOI) Status: New Subcontracting Provisioning Goals (%) Minority Owned: 18 Women Owned: 12 Service Disabled Veteran Owned: 6 Equal Employment Opportunity: 45 Contract Terms March 31, 2028 Location Where Goods to be Delivered or Service Performed South Beach Psychiatric Center, 777 Seaview Avenue, Building #8, Staten Island, New York 10305 Ad Notice THIS SOLICITATION IS FOR EXPRESSIONS OF INTEREST (EOI) ONLY See the Eligibility Requirements further down in this document. The Dormitory Authority- State of New York (DASNY) is seeking qualified single-prime general contractors to bid on the renovation of the existing auditorium in Building 8 at the South Beach Psychiatric Center Campus, Staten Island. The project consists of renovation of an existing auditorium including demolition, replacement of approximately 420 fixed seats, new carpet and acoustic wall treatments, stage curtain replacement, upgraded stage lighting and rigging systems, complete audiovisual modernization, associated electrical modifications, architectural repairs and refinishing, and environmental abatement coordination. The Estimated Cost for this work is: $2,000,000 to $2,500,000. Project Labor Agreement The successful low bidder as a condition of being awarded this Contract, must execute the PLA included in the Contract Documents following the Form of Bid. The Work undertaken in connection with this Project will be governed by, and subject to the conditions set forth in the PLA. All Subcontractors of every tier, will be required to execute a Letter of Assent, included in the enclosed PLA, agreeing to be bound by the PLA. The PLA has been approved by the Building and Construction Trades Department, AFL-CIO. Bidders for the construction of this project will be selected only after the review and evaluation of the qualification packages received in response to this notice. Please note that the project drawings and specifications attached to DASNY’s website associated with this solicitation do not reflect 100% construction / bid documents. The documents provided are for reference only. Finalized construction / bid documents shall be distributed to the qualified contractors invited to bid. Please find links to the specifications and drawings below: Project Manual Drawings General Conditions for Construction dated February 4, 2026, will apply to the Contract Documents. The anticipated goals for EEO and M/WBE participation in the Work of the Contract are as follows: Percent of Total Work Force (EEO): Minority & Women Workforce Goal (for all trades) 45 % Percent of Total Contract (M/WBE): Minority Business Enterprise Goal 18 % Women's Business Enterprise Goal 12 % Service-Disabled Veteran Owned Businesses 6 % Please note the Owner will determine the goals for EEO and M/WBE participation when the finalized construction / bid documents are distributed to the qualified contractors invited to bid. Firms shall provide one (1) copy in pdf format of the EOI package via e-mail to [email protected] . Upon receipt, confirmation of delivery will be provided by email for each submission. If a firm does not receive confirmation of receipt, the EOI package shall be deemed not received. Firms are responsible for ensuring that confirmation of receipt is obtained and should follow up promptly if confirmation is not received. Instructions for Submission of the EOI Packages: Each firm responding to this solicitation shall submit an EOI package organized and assembled in a clear, logical and professional manner consistent with the requirements set forth herein. Failure to comply with these instructions may render the submission non-responsive and subject to rejection. Each package shall be submitted with: A Cover Page that clearly identifies: The Legal Name of the Company submitting the EOI The Project Name for which the EOI is being submitted The Date of Submission Immediately following the Cover Page, the contractor shall provide a Table of Contents listing all Tabbed sections, exhibits and attachments contained in the submission with the corresponding page number. The EOI package shall be divided into clearly labeled tabbed sections, each separated by a Cover Sheet identifying the contents that follow. Tabs should correspond to the order of the items specified in the solicitation. All items outlined in each Tab must be provided. The Owner may reject any EOI package not prepared and submitted in accordance with the provisions as stated in this solicitation. Tabs must be in the following sequence: Tab 1 – Company Profile Provide a company profile that includes the following information: Company Contact – Name, Title, E-mail address, and Phone Number of primary point of contact for this project. Date Established – When the company was founded. Company Address – Primary business location. Ownership Information – Name and resumes of all principal owners. Client List – Summary of public and private sector clients. Employee Breakdown – Number of employees by role: Architects, Engineers, Project Managers, Administrative Staff, Superintendents and Foremen, Trade Laborers. Equipment - Overview of all equipment owned by the company. Self-Performed Services - Description of all services the company performs directly (not subcontracted). Tab 2 – Experience Provide documentation showing a minimum of five (5) years of experience with projects similar in size, scope, and complexity to the one being proposed. Provide details for the five (5) relevant projects that have been completed- or substantially completed- within the last ten (10) years. For each project, include the following information: Name of the project designer Firm name and contact information Project title and location/facility Brief description of the project Total construction cost Construction start date Substantial completion date Indicate role as
Issued by Dormitory Authority of the State of New York (DASNY).
Context for bidders
We hold 29 notices from Dormitory Authority of the State of New York (DASNY), going back to August 2026 — 29 of them still open. They buy mostly in Construction & Infrastructure, Education & Training and Healthcare & Pharma. There are 304 open Construction & Infrastructure tenders in United States. This one closes in 545 days.
More from this buyer
- CUNY Baruch College Information & Technology Building 2nd, 3rd, & 4th Floor Library Renovation & Associated Asbestos Abatement· closes 8 May
- CUNY Baruch College South Campus Boilers and Asbestos Abatement· closes 31 Mar
- CUNY John Jay College Haaren Hall Gymnasium Facilities Upgrade· closes 19 Oct
- York College - Furnish and Provide Training Services of Mobile Light Tower
- York College-Furnish, Deliver and Provide Training on Installation of Sideline Tarp
Similar Construction & Infrastructure tenders
- Renovate Military Family Housing Tower 4511, Camp Courtney· closes 6 Nov
- Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project· closes 19 Oct
- Loleta Water System Upgrades — Construction of Water Supply Facilities· closes 12 Oct
- Construct Concrete Targets — Construction of Other Non-Building Facilities· closes 9 Oct
- Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair, Haleiwa, Oahu, Hawaii· closes 8 Oct
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Construction & Infrastructure tenders
- proposed renovation of njabini marketNyandarua County Government · Kenya
- Public notice regarding procurement of reagents for hematology analyzer at Dr Hedgewar Arogya SansthanHealth & Family Welfare Department, Govt. of NCT of Delhi · India
- Civil Works — Maintenance of 40 M Ground Base Towers by providing Missing Members, Nut Bolt Tightening, Painting etc. for Bhimkanhar (Balod) under Durg OA. (II Call)BSNL — Chhattisgarh · India
- Proposed Construction of Modern Laundry at Kapsabet County Referral HospitalNandi County Government · Kenya
- Приобретение (сооружения) скотомогильника в с. Жалаулы, Актогайского районаГУ "Управление ветеринарии Павлодарской области" · Kazakhstan
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →