Notice Inviting Tender (NIT) - Ash Utilization of APL TiroraTPP
Issued by Adani Power · via Adani Power — Tenders
- Published
- 28 Jul 2026
- Reference
- adanipower-notice-inviting-tender-nit-ash-utilization-of-apl-tirora-tpp
- Location
- India
- Sector
- Energy & Power
Details
Adani Power Limited (APL)
Bids for Utilization of Ash
Notice Inviting Tender (NIT)
SECTION A
NOTICE INVITING TENDERS (NIT)
FOR
UTILIZATION OF ASH
Issued by:
ADANI POWER LIMITED (APL) Tender Documents No. APL/2024-25/ASH/TENDER-01
Dated: 26.04.2024
Adani Power Limited (APL)
Bids for Utilization of Ash
Notice Inviting Tender (NIT)
Adani Power Limited (APL), invites sealed bids from eligible bidders for Sale / Utilization of Ash generated at its Tirora Thermal Power Plant (TPP) as detailed in Bidding Documents Numbered APL/24-25/ASH/TENDER-01 dated 26/04/2024. BRIEF OVERVIEW OF APL TIRORA THERMAL POWER PLANT: Adani Power Limited (APL), (hereinafter referred to as ‘APL’) is Company incorporated under the Companies Act, 2013 and is engaged in business of, inter alia, thermal power generation. Adani Power Limited’s Tirora TPP is a coal based Thermal Power Plant with a total installed capacity of 3300 MW, situated at Tirora, District: Gondia, State: Maharashtra (erstwhile Adani Power Maharashtra Limited - APML). It is in the process of electricity generation and the ash generated is collected through Electrostatic Precipitator & related process. For the year 2024-25, APL Tirora TPP is expected to generate 5.00 Million Metric Tonnes of Ash.
Preamble:
Ministry of Environment, Forest & Climate Change (MoEF&CC), vide its notification dated 31.12.2021 had mandated Thermal Power Plants to utilize 100% of ash generated and prescribed Environmental compensations for non-compliance and procedures for its Enforcement, Monitoring, Audit and Reporting. Relevant abstract of notification is
produced below for your kind reference:
… A. Responsibilities of thermal power plants to dispose ash and bottom ash. (4) Every coal or lignite based thermal power plant shall be responsible to utilize 100 per cent ash (ash and bottom ash) generated during that year, however, in no case shall utilisation fall below 80 per cent in any year, and the thermal power plant shall achieve average ash utilisation of 100 per cent in a three years cycle. … … C. Environmental compensation for non-compliance. (1) In the first two years of a three years cycle, if the coal or lignite based thermal power plant (including captive or co-generating stations or both) has not achieved at least 80 per cent ash (ash and bottom ash) utilisation, then such non-compliant thermal power plants shall be imposed with an environmental compensation of Rs. 1000 per ton on unutilized ash during the end of financial year based on the annual reports submitted and if it is unable to utilize 100 per cent of ash in the third year of the three years cycle, it shall be liable to pay an environmental compensation of Rs. 1000 per ton on the unutilized quantity on which environmental compensation has not been imposed earlier. … APL intends to ‘utilize / dispose off’ the entire Ash generated from its Tirora Thermal Power Plant on ‘As-is-where-is’ basis to comply with the MOEF&CC, MOP norms. 1.0 SCOPE OF WORK APL intends to sale / utilize / dispose-off 100% ash to be generated at its Tirora power plant on ‘As-is-where-is’ basis in FY’2024-25 and the same is expected to be around Adani Power Limited (APL)
Bids for Utilization of Ash
Notice Inviting Tender (NIT)
5.00 Million Metric Tonnes. The annual quantity for upcoming years may vary to the extent of generation of power at Tirora Thermal Power Plant. APL shall notify the Utilizer (herein called as successful bidder) regarding the scheduled quantity of ash to be utilized at Tirora TPP at the start of every quarter during the Agreement Term as per Article 3 & 4 of the Draft Ash Utilization Agreement (‘Draft-AUA’). The Ash to be utilized shall conform to the prescribed norms set out in Exhibit 9 of the ITB (Instructions to Bidder) which comprises notifications and guidelines as issued by MOEF&CC as well as MOP from time to time. Term of the Utilization Agreement shall be for a period of Ten (10) years from the Commencement Date and mutually extendable for another Ten (10) years, as per the provisions of Draft-AUA. 2.0 BID QUALIFICATION REQUIREMENTS The Bidder shall meet the qualifying requirements (QR) for Financial Capacity (Clause 2.1) and Technical Capacity (Clause 2.2). Bidder shall also note the stipulation of Clause 2.3 “Limitations” as specified herein below:
2.1 QR for Financial Capacity:
a) Net worth: Bidder shall have a Net worth of INR 1,00,00,00,000 (Indian
Rupees One Hundred Crores only) in the preceding financial year i.e., 2023-
24. Net Worth for the relevant year shall mean the sum of the paid-up equity
share capital, equity like instruments and free reserves and surpluses (free reserves and surpluses shall mean all reserves credited out of the profits and share premium account but does not include reserves credited out of revaluation of assets) less miscellaneous expenditure that has not been written off.
b) Turnover: Bidder shall have minimum average annual turnover of INR
2,50,00,00,000 (Indian Rupees Two Hundred Fifty crores only) in the preceding three (3) financial years i.e., 2021-22, 2022-23 and 2023-24. c) Bidder shall provide Certificate(s) from its Statutory Auditors (as per Exhibit 7 of ITB) specifying the Turnover and Net worth of the bidder.
2.2 QR for Technical Capacity:
a) Bidders should have utilized ash of quantity more than 5.0 Million Metric Tonnes in the preceding financial year i.e., 2023-24. (or) Bidders should have trading or logistic experience of value more than INR 3,50,00,00,000 (Indian Rupees Three Hundred Fifty crores only) in the preceding financial year i.e., 2023-24. b) Bidder shall provide Certificate(s) from its Statutory Auditors supporting the experience criteria (as per Exhibit 8 of ITB). Modifications to the formats attached in the ITB without changing the meaning or the purpose of the same, may be acceptable a
This notice has closed — what to do next
We hold 15 notices from Adani Power, going back to July 2026 — 15 of them still open. They buy mostly in Transport & Logistics, Chemicals & Materials and Energy & Power. There are 757 open Energy & Power tenders in India.
Open now from this buyer
- Advertisement for lifting Pond Ash on FOC Basis
- Providing Services for AC vehicles of various model & capacity on rental basis for APL Raipur
- Notice for Limited Auction for Fly Ash by ACL from ThermalPower Plants of APL
- Notice for Sale of 'Pond Ash Cenosphere'
- Notice Inviting Tender- FGD for Mundra Ph-III
Open Energy & Power tenders in India
- Biennial Operation and Maintenance of 1089kWp Grid Connected Rooftop Solar Photovoltaic Power Plant on Different Buildings at Bandel Thermal Power Station· closes 5 Oct
- Biennial Maintenance Contract of Boiler and Auxiliaries Including Optional Jobs of UNIT5 Btps· closes 26 Oct
- Installation of rooftop Solar on grid system and replacement of all outdated internal wirings with LT Panel at Ananda Chandra College In the district of Jalpaiguri· closes 5 Oct
- Repairing and servicing of 3 nos 11KV 800A Solenoid Actuated Biecco make OCB at CWPS under SWTP, KMDA.· closes 28 Sept
- Supply and Installation of LED Street Lights with 7 meter octagonal pole For Raiganj Municipal Area in the district of Uttar Dinajpur.· closes 23 Sept
Documents
- notice-inviting-tender-nit--ash-utilization-of-apl-tirora-tpp.pdfDownload
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this energy & power opportunity. Always verify the details on the official source.
- Confirm the closing date and submission window on the official portal before you start preparing your bid.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Energy & Power tenders
- Electrical Works — Repairing of 16/25 KVA Transformer for different location of BTS /TE under Darbhanga BA .BSNL — Bihar · India
- Electrical Works — Repairing of 16/25 KVA Transformer for different location of BTS /TE under Muzaffarpur BA .BSNL — Bihar · India
- Tender for Proposed Additions & Alterations to Existing Nanyang Polytechnic Block D1, Block P1, M&E Rooms at Block A and Existing Electrical Substation on MK18 Lot 19060W, 19061V at 180 Ang Mo Kio Avenue 8 (Ang Mo Kio Planning Area)Nanyang Polytechnic · Singapore
- Pr - equalification of Suppliers for Supply of fuel for Company Motor Vehicles and GeneratorsTANZANIA CONCRETE POLES MANUFACTURING CO.LTD · Tanzania
- Procurement of Electrical and Electronics Items Veta Western ZoneVETA - WESTERN ZONE · Tanzania
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →