FreeTender
tenderClosed

Notice Inviting Tender (NIT) - Ash Utilization of APL TiroraTPP

Adani Power

Published
28/7/2026
Closes
Bid opening
Value
Reference
adanipower-notice-inviting-tender-nit-ash-utilization-of-apl-tirora-tpp
Location
India
Sector
Water & Environment
Type

Details

Adani Power Limited (APL)

Bids for Utilization of Ash

Notice Inviting Tender (NIT)

SECTION A

NOTICE INVITING TENDERS (NIT)

FOR

UTILIZATION OF ASH

Issued by:

ADANI POWER LIMITED (APL) Tender Documents No. APL/2024-25/ASH/TENDER-01

Dated: 26.04.2024

Adani Power Limited (APL)

Bids for Utilization of Ash

Notice Inviting Tender (NIT)

Adani Power Limited (APL), invites sealed bids from eligible bidders for Sale / Utilization of Ash generated at its Tirora Thermal Power Plant (TPP) as detailed in Bidding Documents Numbered APL/24-25/ASH/TENDER-01 dated 26/04/2024. BRIEF OVERVIEW OF APL TIRORA THERMAL POWER PLANT: Adani Power Limited (APL), (hereinafter referred to as ‘APL’) is Company incorporated under the Companies Act, 2013 and is engaged in business of, inter alia, thermal power generation. Adani Power Limited’s Tirora TPP is a coal based Thermal Power Plant with a total installed capacity of 3300 MW, situated at Tirora, District: Gondia, State: Maharashtra (erstwhile Adani Power Maharashtra Limited - APML). It is in the process of electricity generation and the ash generated is collected through Electrostatic Precipitator & related process. For the year 2024-25, APL Tirora TPP is expected to generate 5.00 Million Metric Tonnes of Ash.

Preamble:

Ministry of Environment, Forest & Climate Change (MoEF&CC), vide its notification dated 31.12.2021 had mandated Thermal Power Plants to utilize 100% of ash generated and prescribed Environmental compensations for non-compliance and procedures for its Enforcement, Monitoring, Audit and Reporting. Relevant abstract of notification is

produced below for your kind reference:

… A. Responsibilities of thermal power plants to dispose ash and bottom ash. (4) Every coal or lignite based thermal power plant shall be responsible to utilize 100 per cent ash (ash and bottom ash) generated during that year, however, in no case shall utilisation fall below 80 per cent in any year, and the thermal power plant shall achieve average ash utilisation of 100 per cent in a three years cycle. … … C. Environmental compensation for non-compliance. (1) In the first two years of a three years cycle, if the coal or lignite based thermal power plant (including captive or co-generating stations or both) has not achieved at least 80 per cent ash (ash and bottom ash) utilisation, then such non-compliant thermal power plants shall be imposed with an environmental compensation of Rs. 1000 per ton on unutilized ash during the end of financial year based on the annual reports submitted and if it is unable to utilize 100 per cent of ash in the third year of the three years cycle, it shall be liable to pay an environmental compensation of Rs. 1000 per ton on the unutilized quantity on which environmental compensation has not been imposed earlier. … APL intends to ‘utilize / dispose off’ the entire Ash generated from its Tirora Thermal Power Plant on ‘As-is-where-is’ basis to comply with the MOEF&CC, MOP norms. 1.0 SCOPE OF WORK APL intends to sale / utilize / dispose-off 100% ash to be generated at its Tirora power plant on

…full terms are in the official tender document.

Documents

  • notice-inviting-tender-nit--ash-utilization-of-apl-tirora-tpp.pdfDownload

More Water & Environment tenders

All Water & Environment tenders →

Ready to bid? Verify the details and apply on the official tender page.

Verify & apply on the official portal →
📣Your ad hereAdvertise or sponsor FreeTenderPut your brand in front of buyers, bidders & consultants.Get in touch →