FreeTender
Accepting bidsUnited Kingdom

Manchester International Airport - Shotcrete works

Issued by Kier Transportation - CP7 NWC · via UK Contracts Finder

Published
6 Oct 2026
Closes
16 Oct 2026, 16:00 UTC
Value
GBP 500,000
Reference
C4N120562379
Location
United Kingdom
Sector
Construction & Infrastructure
Type
works

At a glance

Kier Transportation - CP7 NWC in United Kingdom has published a procurement notice in construction & infrastructure: “Manchester International Airport - Shotcrete works”. Submissions close on 16 October 2026, 11 days from today. The stated value is GBP 500,000. Quote reference C4N120562379 in any correspondence with the buyer. 2 documents are attached to this notice. FreeTender has recorded 4 notices from this buyer since 2026, 2 of them currently open. There are 428 open construction & infrastructure notices in United Kingdom on FreeTender. Bids are submitted to the buyer through UK Contracts Finder, not through FreeTender.

Details

The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable.Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport.

The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP):

A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services.

The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions.

The scope areas for this package are as follows:

-Preparation and cleaning of exposed contiguous piled retaining wall faces. -Supply and installation of mesh reinforcement, anchor bars and injection mortar. -Supply, delivery, application, curing and finishing of sprayed concrete (shotcrete). -Formation and sealing of expansion and construction joints. -Protection of adjacent assets from rebound, overspray and damage. -Testing, inspection, quality assurance and handover documentation. -Removal and disposal of rebound material, washout and associated waste. -Working within a live rail and airport environment in accordance with all project and Network Rail requirements.

Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract. Contract summary Industry - Ready-mixed concrete - 44114100 - Concrete piles - 44114210 - Construction work for railways and cable transport systems - 45234000 - Reinforced-concrete work - 45262310 Location of contract North West, Any region Value of contract £250,000 to £500,000 Procurement reference C4N120562379 Published date 6 October 2026 Closing date 16 October 2026 Closing time 5pm Contract start date 10 February 2027 Contract end date 27 July 2027 Contract type Works Contract is suitable for SMEs? Yes Contract is suitable for VCSEs? No Description The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable.Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport.

The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP):

A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services.

The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions.

The scope areas for this package are as follows:

-Preparation and cleaning of exposed contiguous piled retaining wall faces. -Supply and installation of mesh reinforcement, anchor bars and injection mortar. -Supply, delivery, application, curing and finishing of sprayed concrete (shotcrete). -Formation and sealing of expansion and construction joints. -Protection of adjacent assets from rebound, overspray and damage. -Testing, inspection, quality assurance and handover documentation. -Removal and disposal of rebound material, washout and associated waste. -Working within a live rail and airport environment in accordance with all project and Network Rail requirements. More information - Links -

- https: //www.competefor.co.uk/business/viewOpportunityDetailsSupplier.html?id=120562388

- Tender notice - Please follow this link to view the notice. How to apply Follow the instructions given in the description or the more information section.

About the buyer

Contact name Mark Thompson Address 2nd Floor Optimum House Clippers Quay M503XP UK

Telephone: [contact details removed]

Closing: 16 October 2026, 5pm

Context for bidders

We hold 4 notices from Kier Transportation - CP7 NWC, going back to August 2026 — 2 of them still open. There are 428 open Construction & Infrastructure tenders in United Kingdom. This one closes in 11 days.

Documents

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Construction & Infrastructure tenders

All Construction & Infrastructure tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →