FreeTender
Accepting bidstenderUnited States

Kautz Road Substation Construcion, UIP Subproject 2- KRS

Issued by ENERGY, DEPARTMENT OF · ENERGY, DEPARTMENT OF · FERMILAB - DOE CONTRACTOR · via SAM.gov — US federal contract opportunities

Published
5 Nov 2026
Closes
18 Dec 2026, 22:00 UTC
Reference
RFP-383167-CD
Location
IL, United States
Sector
Construction & Infrastructure

At a glance

ENERGY, DEPARTMENT OF · ENERGY, DEPARTMENT OF · FERMILAB - DOE CONTRACTOR in United States has published a tender in construction & infrastructure: “Kautz Road Substation Construcion, UIP Subproject 2- KRS”. Submissions close on 18 December 2026, 43 days from today. Quote reference RFP-383167-CD in any correspondence with the buyer. FreeTender has recorded 25 notices from this buyer since 2026, 7 of them currently open. There are 381 open construction & infrastructure notices in United States on FreeTender. Bids are submitted to the buyer through SAM.gov — US federal contract opportunities, not through FreeTender.

Details

ENERGY, DEPARTMENT OF · ENERGY, DEPARTMENT OF · FERMILAB - DOE CONTRACTOR is soliciting Kautz Road Substation Construcion, UIP Subproject 2- KRS. Solicitation number RFP-383167-CD. Classified under NAICS 237130 — Power and Communication Line and Related Structures Construction. Product/service code Z2MZ — REPAIR OR ALTERATION OF EPG FACILITIES - OTHER, INCLUDING TRANSMISSION. Place of performance: IL, USA. Responses are due by 18 December 2026 22:00 UTC. Posted on SAM.gov, the US federal contract opportunities system; registration is required to bid.

November 5, 2026- Amendment 1 issued to clarify timne and location of the Pre-Proposal Meeting. This scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab’s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab.  The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – 60 Calendar Days after issuance of Notice to Proceed (NTP). This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 4th January 2028; This milestone marks the point where access is permitted inside Kautz Road Substation yard and construction work may begin. Milestone 3 – 31st of March 2028; This milestone marks the completion of building foundation and ready for placement of the new prefabricated control house building (provided by FermiForward). Milestone 4 – 2nd July 2029; This milestone marks the formal issuance of an Authorization for Use and Possession (AUP) of the KRS Substation facility, including all remedial work following removal of site trailers, but not including seasonal work and all final punch list items addressed.. Milestone 5 – 30th September 2029; This milestone marks the completion of the project.

Context for bidders

We hold 25 notices from ENERGY, DEPARTMENT OF · ENERGY, DEPARTMENT OF · FERMILAB - DOE CONTRACTOR, going back to August 2026 — 7 of them still open. They buy mostly in Manufacturing & Supply, Construction & Infrastructure and Electronics semiconductors. There are 381 open Construction & Infrastructure tenders in United States. This one closes in 43 days.

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Construction & Infrastructure tenders

All Construction & Infrastructure tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →