Gifford Pinchot National Forest - Fire Trailer Tank Assembly
Issued by AGRICULTURE, DEPARTMENT OF · FOREST SERVICE · USDA-FS, CSA NORTHWEST 2 · via SAM.gov — US federal contract opportunities
- Published
- 26 Aug 2026
- Closes
- 8 Sept 2026, 18:00 UTC
- Reference
- 1240BD26Q0087
- Location
- WA, United States
- Sector
- Manufacturing & Supply
Details
AGRICULTURE, DEPARTMENT OF · FOREST SERVICE · USDA-FS, CSA NORTHWEST 2 is soliciting Gifford Pinchot National Forest - Fire Trailer Tank Assembly. Solicitation number 1240BD26Q0087. Classified under NAICS 336212 — Truck Trailer Manufacturing. Product/service code 4210 — FIRE FIGHTING EQUIPMENT. Place of performance: WA, USA. Responses are due by 08 September 2026 18:00 UTC. Posted on SAM.gov, the US federal contract opportunities system; registration is required to bid.
This is a combined synopsis/solicitation for a commercial product prepared in accordance with Revolutionary FAR Overhaul (RFO) Part 12 and RFO Subpart 5.2. This announcement constitutes the only solicitation; quotes are being requested.This requirement incorporates provisions and clauses in effect through Federal Acquisition Circular (FAC) 2026-01. Requirement Description The U.S. Forest Service, Gifford Pinchot National Forest, Wind River Ranger District, requires the procurement of a brand new, commercial-grade Fire Trailer Tank and Pump Assembly.
- Critical Procurement Constraint: The Government currently owns the tandem-axle utility trailer (5’x10’, 7,000 lbs GVWR). This requirement is strictly for the fully integrated skid unit that bolts onto the existing frame.
- Exclusions: This acquisition explicitly does not include the purchase of a new trailer chassis, wheels, axles, tongue, or towing coupler.
Technical Specifications & Salient Characteristics
The skid unit must conform to the following core baselines:
- Tank Structure: Minimum 500-gallon capacity; heavy-duty 10-gauge carbon steel. Internal anti-surge baffles and interior epoxy coating required.
- Footprint & Weight: Maximum 5’x10’ footprint matching the structural channel layout of the government owned trailer. Total assembly dry weight must not exceed 2,300 lbs.
- Pump Assembly: 13 HP commercial gas engine paired with a twin-impeller portable centrifugal pump delivering ≥ 120 GPM @ 40 PSI and ≥ 20 GPM @ 146 PSI.
- Drafting & Plumbing: Integrated 2-inch manifold with self-loading/drafting system. Includes 2" x 20' suction hose with foot valve/strainer and a manual hand primer pump.
- Discharges: 2-inch quarter-turn ball valve main discharge. Valved auxiliary ports in 1-inch, 1.5-inch, and 3/4-inch configurations.
- Accessories: Manual-wind hose reel loaded with 250 feet of 1-inch utility hose and adjustable nozzle. Integrated lockable rear toolbox, shackle tie-down points, and integrated fenders/mud flaps matching tandem-axle placement.
- Aesthetics: Tank may be painted red but must not feature any fire use decals or markings.
******See Attached Solictation for Salient Characterisitcs******** Place of Performance/ Timelines
- Delivery/Production Timeline: Full manufacturing, plumbing, leak pressure testing, and final inspection availability must occur within thirty (30) calendar days from receipt of order (ARO).
- FOB Delivery Address: Wind River Work Center, 1262 Hemlock Road, Carson, WA 98610.
- Government Pickup Option: If the contractor’s manufacturing facility sits within a 100-mile driving radius of Carson, WA (98610), the Government reserves the right to execute a local pickup.
Evaluation Framework & Basis for Award Award will be made to the responsible offeror representing the most advantageous solution to the Government under the simplified procedures of FAR 12.203. The following factors will be evaluated:
- Technical Acceptability: Exact matching of technical baselines or validated technical justifications for proposed "or equal" elements.
- Delivery Timeline: Confirmed ability to meet the mandatory 30-day target.
- Price: Fair and reasonable evaluation.
Submission Protocol Quoters must maintain an Active SAM.gov Registration. Offers omitting a Unique Entity ID (UEI) will be immediately excluded from evaluation. Prices must remain firm for 90 calendar days from the submission deadline.
Required Package Components:
- Completed and signed SF-1449 (Blocks 17a, 30a, 30b, and 30c).
- Phone, Email, and SAM UEI within Block 17a.
- Completed unit costs and totals within the Schedule of Items.
- Completed Requirements Compliance Checklist (attached to Solicitation).
- Technical drawings, dimensional prints, or commercial component brochures.
- Signed copies of all issued SF-30 Amendments.
See attached solicitation for details, images and all required forms.
Context for bidders
We hold 4 notices from AGRICULTURE, DEPARTMENT OF · FOREST SERVICE · USDA-FS, CSA NORTHWEST 2, going back to August 2026 — 4 of them still open. They buy mostly in Manufacturing & Supply and Facility Management & Cleaning. There are 3,358 open Manufacturing & Supply tenders in United States. This one closes in 1 day.
More from this buyer
Similar Manufacturing & Supply tenders
- Valve, Solenoid — 129 each, NSN· closes 21 Sept
- Plate, Mounting — 186 each, NSN· closes 22 Sept
- Control Assembly, Push — 111 each, NSN· closes 22 Sept
- Clutch Half, Positive, N — 65 each, NSN· closes 22 Sept
- Shaw AFB Postal Metering Machine — Machining Centers and Way-Type Machines· closes 11 Sept
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this manufacturing & supply opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Manufacturing & Supply tenders
- Supply, Installation and Commissioning of FM 200 Fire Suppression System for Equipment Room at Kinyerezi II Gas PlantTANZANIA ELECTRIC SUPPLY COMPANY LIMITED · Tanzania
- Supply of stores Parking and packaging Materials for white maize Purchasing operation( sand snake, sewing machine, sewing threads)NFRA - SUMBAWANGA ZONE · Tanzania
- Supply of Information Communication Technology EquipmentsTHE MWALIMU NYERERE MEMORIAL ACADEMY · Tanzania
- Procurement of equipment for Improving Transmission system equipment performanceTANZANIA BROADCASTING CORPORATION · Tanzania
- Procurement of production equipment (Music instrument Camera and accessories)TANZANIA BROADCASTING CORPORATION · Tanzania
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →