FreeTender

This tender closed on 23 October 2026 — kept here for reference.

Bids are no longer accepted. Scroll down for this buyer's record and what they have open now, or browse Construction & Infrastructure tenders · latest notices worldwide

ClosedtenderDenmark

Framework agreement - Purchase of fittings for glass insulator strings - 26/17723

Issued by Energinet Eltransmission A/S · via udbud.dk — Denmark (national procurement notices)

Published
29 Sept 2026
Closed
23 Oct 2026, 10:00 UTC
Value
EUR 12,684,564
Reference
670046-2026
Location
Denmark
Sector
Construction & Infrastructure
Type
goods

At a glance

Energinet Eltransmission A/S in Denmark has published a tender in construction & infrastructure: “Framework agreement - Purchase of fittings for glass insulator strings - 26/17723”. The deadline passed on 23 October 2026. The stated value is EUR 12,684,564. Quote reference 670046-2026 in any correspondence with the buyer. One document is attached to this notice. FreeTender has recorded 11 notices from this buyer since 2026, 6 of them currently open. There are 176 open construction & infrastructure notices in Denmark on FreeTender. Bids are submitted to the buyer through udbud.dk — Denmark (national procurement notices), not through FreeTender.

Key requirements

Taken from the notice by FreeTender. The tender document on the official portal is binding — check it, and any corrigendum, before you bid.

To bid on EU public procurement

Most EU buyers ask for the European Single Procurement Document (ESPD) as a self-declaration with the bid. Submission is on the e-procurement platform named in the notice.

Details

The Contracting Authority wants to purchase complete glass insulator strings.

For further details regarding the purchase, reference is made to the tender documents: Ap-pendix 2A scope of works for powerlines and 2B Scope of work for substations.

The tendered framework agreement has a duration of four (4) years. The framework agree-ment can be extended two (2) times for two (2) years each time.

The framework agreement is divided into the following lots:

  • Lot 1: Complete glass insulator strings for powerlines. Expected consumption to be:

EUR 10.000.000. Maximum value is EUR 24.000.000

  • Lot 2: Complete glass insulator strings for substations. Expected consumption to be:

EUR: 2.684.563,75. Maximum value is EUR 6.442.953,00 euro.

Tenders can be submitted for all Lots. Tenderers are not required to submit a tender for both lots

Offers can be submitted for all partial agreements

The estimated consumption during the term of the framework agreement is expected to amount to be divided into lots.

The consumption figures are estimates only and are consequently not binding for the Contract-ing Authority. During the specified period, the Contracting Authority has the right to purchase the services and/or goods comprised by the framework agreement from the selected tenderer but is not obligated to do so cf. the framework sec. 1.3.

Contracting authority: Energinet Eltransmission A/S

Notice type: Contract notice – sectoral directive, standard regime

Change notice: yes — this notice amends an earlier one

Main nature of the contract: Supplies

CPV: 44111500 Insulators and insulating fittings

Estimated value: EUR 12,684,564

TED publication: 670046-2026

Lots: 2

Procurement documents and submission are through the buyer's e-tendering system linked from the notice on udbud.dk.

This notice has closed — what to do next

We hold 11 notices from Energinet Eltransmission A/S, going back to May 2026 — 6 of them still open. They buy mostly in Construction & Infrastructure, Financial & Professional Services and Water & Environment. There are 176 open Construction & Infrastructure tenders in Denmark.

Browse all open Construction & Infrastructure tenders →

Explore Denmark

Documents

  • Procurement documents (www.comdia.com)Download

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Construction & Infrastructure tenders

All Construction & Infrastructure tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →