Early Market Engagement Notice: P000811-M37 Corridor Improvement Project, Phase 1
Issued by AIIB-financed project (Uzbekistan) · via AIIB — Project Procurement Notices
- Published
- 18 Sept 2026
- Reference
- aiib-uzbekistan-p000811-m37-corridor-improvement-project-phase-1-early-market-engagement-notice-sep-18-2026
- Location
- Uzbekistan
- Sector
- Construction & Infrastructure
At a glance
AIIB-financed project (Uzbekistan) in Uzbekistan has published a tender in construction & infrastructure: “Early Market Engagement Notice: P000811-M37 Corridor Improvement Project, Phase 1”. The notice does not state a closing date, so confirm the timetable on the official portal. Quote reference aiib-uzbekistan-p000811-m37-corridor-improvement-project-phase-1-early-market-engagement-notice-sep-18-2026 in any correspondence with the buyer. One document is attached to this notice. FreeTender has recorded 56 notices from this buyer since 2020, 55 of them currently open. There are 29 open construction & infrastructure notices in Uzbekistan on FreeTender. Bids are submitted to the buyer through AIIB — Project Procurement Notices, not through FreeTender.
Details
Early Market Engagement M37 Corridor Improvement Project—km 207–276 and Bukhara Bypass Project and proposed opportunities The Government of the Republic of Uzbekistan is preparing the reconstruction of the M37 Samarkand–Bukhara–Turkmenbashi road between km 207 and km 276, together with a 4.5 km Bukhara bypass, for proposed financing by the Asian Infrastructure Investment Bank (AIIB). The Project will be implemented by the “Avtoyulinvest” Agency under the Committee for Roads under the Ministry of Transport of the Republic of Uzbekistan. The Project covers a total road length of approximately 73.5 km and includes reconstruction and upgrading with cement-concrete pavement. The proposed procurement comprises:
- Civil Works—Lot 1: reconstruction of the M37 between km 207 and km 249,
covering approximately 42 km;
- Civil Works—Lot 2: reconstruction of the M37 between km 249 and km 276,
together with the 4.5 km Bukhara bypass, covering approximately 31.5 km;
- Construction Supervision and Project Management Consulting Services:
independent supervision and contract administration across both Civil Works lots, including quality control, progress monitoring, certification of works and project management support; and
- Technical Audit Consulting Services: independent technical audits at key stages of
implementation, covering the Civil Works and associated supervision services. Bidders are expected to be permitted to bid for one or both Civil Works lots, with contracts potentially awarded separately or in combination. The anticipated construction period is approximately three years, followed by a two-year Defects Notification Period. What the EME will explore The EME will focus on the following areas. Civil Works
- market appetite for the proposed opportunity;
- the suitability of the proposed two-lot structure and arrangements for bidding for and
awarding one or both lots;
- qualification and evaluation criteria;
- constructability, deliverability, implementation schedule and mobilization;
- sourcing, supply-chain and cross-border logistics constraints;
- opportunities for innovation or alternative delivery approaches; and
- other measures that could encourage participation by capable contractors.
Consulting Services
- market appetite for the proposed assignments;
- the proposed scope, packaging and interfaces between the two assignments;
- contract duration, mobilization and staffing requirements; …
Member: Uzbekistan
Sector: Transport
Notice type: Early Market Engagement Notice
Issue date: Sep 18, 2026
This notice has closed — what to do next
We hold 56 notices from AIIB-financed project (Uzbekistan), going back to March 2020 — 55 of them still open. They buy mostly in Water & Environment, Construction & Infrastructure and Energy & Power. There are 29 open Construction & Infrastructure tenders in Uzbekistan.
Open now from this buyer
- Specific Procurement Notice: Bukhara Region Water Supply and Sewerage Project - Phase 1· closes 30 Nov
- Early Market Engagement Notice: Uzbekistan: Karakalpakstan and Khorezm Local Roads Network Reconstruction Project
- Specific Procurement Notice: Bukhara Region Water Supply and Sewerage Project - Phase 1
- Early Market Engagement Notice: Bukhara Region Water Supply and Sewerage Project
- Specific Procurement Notice: Karakalpakstan and Khorezm Local Roads Network Rehabilitation Project
Open Construction & Infrastructure tenders in Uzbekistan
- Detailed Design Services for Energy Efficiency Measures, Structural Strengthening and Seismic Stability of 5 Public Buildings in Namangan Region.
- Detailed Design Services for Energy Efficiency Measures, Structural Strengthening and Seismic Stability of 4 Public Buildings in Namangan Region.
- Detailed Design Services for Energy Efficiency Measures, Structural Strengthening and Seismic Stability of 5 Public Buildings in Namangan Region.
- Detailed Design Services for Energy Efficiency Measures, Structural Strengthening and Seismic Stability of 4 Public Buildings in Namangan Region.
- Detailed Design Services for Energy Efficiency Measures, Structural Strengthening and Seismic Stability of 4 Public Buildings in Namangan Region.
Documents
- EME-Publication-M37.pdfDownload (pdf)
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.
- Confirm the closing date and submission window on the official portal before you start preparing your bid.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Construction & Infrastructure tenders
- Smale Scale Water resources works for Padma Beel Ramnagar Subproject under Manda Upazila of Naogaon. Part A: Construction of Padma Beel Regulator (Size: 2V- 1.50mx1.80m) Part B: Construction of a Drainage Culvert (Size: 1V- 3.00mx3.50m) Part C: Construction of WMCA Office. Part D: Documentation of WMCA Office. Part E: Indicative Environmental ManaMinistry of Local Government, Rural Development and Co-operatives, Local Government Division, Local Government Engineering Department (LGED), Office of the Executive Engineer, LGED, Naogaon · Bangladesh
- Construction of Workshop Cum Laboratory Building at 5 Mushroom Sub-Centers(Sirajgonj, Thakurgaon,Rajshahi, Magura, Potuakhali) under INRPMC ProjectMinistry of Agriculture, Department of Agricultural Extension (DAE), Improvement of Nutrition and Reduction of Poverty through Mushroom Cultivation · Bangladesh
- Decoration and Interior works of the Room of the Superintending Engineer, Operation & Maintenance Circle, WZPDCL, Barishal.Ministry of Energy, Power and Mineral Resources, Power Division, West Zone Power Distribution Company Ltd (WZPDCL), Office of the Superintendent Engineer, O & M Circle, Barisal · Bangladesh
- Repair and Maintenance of Existing Laboratory cum Office Building at Horticulture Center, Songacha, Comilla.Ministry of Agriculture, Department of Agricultural Extension (DAE), Improvement of Nutrition and Reduction of Poverty through Mushroom Cultivation · Bangladesh
- Maintenance of 1. East Ranipur Govt. Primary School 2. Basonda Govt. Primary School 3. Poschim Kownia GPS 4. Buramojumder GPS under [Betagi] Upazila 5. Paschim Boloibunia Govt. Primary School 6. Ruhita Govt. Primary School 7. Gudighata Adarsha Primary School 8. Uttar Kakchira Govt. Primary School under [Bamna] Upazila 9. Modho Kupdhon(Kristandari) GPS 10. Mia-Bari GPS 11. TalMinistry of Local Government, Rural Development and Co-operatives, Local Government Division, Local Government Engineering Department (LGED), Office of the Executive Engineer, LGED, Barguna · Bangladesh
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →