FreeTender
Accepting bidseoiMongolia

Design Supervision of Mandalgobi-Arvaikheer 220 kV Transmission Line and Construction and Expansion of Associated Substations

Issued by Integrated Project Implementation Unit, Ministry of Energy, Mongolia · via World Bank — Procurement Notices

Published
4 Sept 2026
Closes
2 Oct 2026
Reference
MN-MOE-ESP4-3-CS-QCBS
Location
Mongolia
Sector
Energy & Power
Type
consultancy

Details

REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS SELECTION)

Country: Mongolia

Name of Project: Fourth Energy Sector Project (P509161)

IBRD Loan No.: 9873-MN

Assignment Title: Employer’s Technical Supervision

Reference No: MN-MOE-ESP4-3-CS-QCBS

The Government of Mongolia has received financing from the World Bank toward the cost of the Fourth Energy Sector Project (P509161) and intends to apply part of the proceeds for the following consulting services. The consulting services (“the Services”) will provide Employer’s Technical Supervision services for the design, construction, installation, testing, commissioning, handover, and Defects Notification Period of the Mandalgobi – Arvaikheer 220 kV transmission line and associated substation works, to be implemented under multiple contract lots, in ensuring compliance with contractual requirements, applicable laws and legislation of Mongolia, and the World Bank Environmental and Social Management Framework (ESMF), including relevant Quality standards and environmental, social, health and safety (ESHS) standards. The Services shall cover all phases of the Project lifecycle. The assignment duration shall be thirty-six (36) months, comprising approximately: (i) twenty-four (24) months for design review, construction supervision, testing and commissioning, and support to the Employer up to the issuance of the Taking-Over Certificate (TOC); and (ii) twelve (12) months of Defects Notification Period support on an oncall basis. The detailed Terms of Reference (TOR) for assignment can be found at:

https: //drive.google.com/file/d/1dGjcHPrmfl4bQQEB4LlzhboAafIhPHlO/view?usp=sharing

The Ministry of Energy now invites eligible consulting firms (“Consultants”) to express their interest in providing the Services. Interested Consultants should provide information demonstrating that they are qualified to perform the Services, including: Relevant experience in assignments of similar nature, scope, and complexity, particularly technical supervision for high-voltage transmission lines and substations and under comparable conditions (e.g., similar countries, sectors, climate conditions, or project environments); Firm’s core business, years in operation, and technical and managerial capabilities relevant to the assignment; Organizational capacity, availability of qualified personnel, quality monitoring approaches, and resources; Supporting documentation, as appropriate.

Shortlisting criteria are as follows:

The Consultant shall have proven experience in supervising of high-voltage transmission lines and substations (220 kV and above), FIDIC-based contract administration, and preferably World Bank-financed projects. At least seven (7) years of experience in assignments of similar nature and complexity in the energy sector, particularly in transmission network expansion; Proven experience in successfully completing at least one (1) technical supervision assignment for high-voltage transmission lines and substations (220 kV and above) preferably in countries with similar climatic conditions; Experience working with government agencies and international financial institutions (IFIs) is an advantage; Demonstrated organizational capacity, including strong technical and managerial capability, and effective management, coordination, and quality assurance arrangements.

Key Experts will not be evaluated at the shortlisting stage. The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank’s “Procurement Regulations for IPF Borrowers” February 2025 (“Procurement Regulations”), setting forth the World Bank’s policy on conflict of interest.

Consultants may associate with other firms to enhance their qualification, but should indicate clearly whether the association is in the form of a joint venture and/or sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected. A Consultant will be selected in accordance with the Quality and Cost Based Selection (QCBS) method set out in the World Bank’s Procurement Regulations for IPF Borrowers. Only selected firm through this expression of interest process will be invited to submit a technical and financial proposal. Expressions of interest must be delivered in a written form to the address below by e-mail at [contact details removed] no later than 10:00 a.m. (local time) on 2 October 2026 .

Attention: [contact details removed]

Integrated Project Implementation Unit, Ministry of Energy, Mongolia

Address: Room No.1201, Khan-Uul Tower, Sharav Street, Khoroo 20, Khan-Uul District, Ulaanbaatar 17060, Mongolia

Tel: [contact details removed]

Context for bidders

There is 1 open Energy & Power tender in Mongolia. This one closes in 27 days.

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this energy & power opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Energy & Power tenders

All Energy & Power tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.