FreeTender
eoi Open for bids

Design for the improvement of the RD PET-08 road section: Chacté Village – Santa Cruz Frontera, municipality of San Luis, department of Petén, for the preparation of detailed engineering studies and technical, economic, socio-environmental evaluation

Inter-American Development Bank (IDB)

Published
8/8/2026
Closes
21/8/2026, 2:59:00 am UTC
Bid opening
Value
USD 3,30,000
Reference
RG-T4625
Location
RG
Sector
Construction & Infrastructure
Type

Details

The Inter-American Development Bank (IDB) invites specialized consulting firms to submit their proposals for the preparation of detailed engineering studies and technical, economic, socio-environmental and risk assessment for the project to improve the RD PET-08 highway, in the Aldea Chacté – Santa Cruz Frontera section, located in the municipality of San Luis. department of Petén, Guatemala.

The main objective is to complement the existing preliminary studies to develop a comprehensive executive design that guarantees the reliability, road safety and sustainability of the corridor for the international transit of goods and people.

1. Technical scope and engineering studies

Traffic study and geometric design: Modeling of traffic volumes, estimation of growth rates and geometric design based on the SIECA manual (Rural Minor Artery - ARM standard) or AASHTO, with validation from the General Directorate of Roads (DGC).

Topography and rights of way: Survey of polygons (stations every 20 m on tangents and 10 m on curves) and cadastre of land affected by extensions or changes in layout for the design of right-of-way plans.

Geotechnics and pavements: Execution of pits, SPT soundings, soil characterization, rotary soundings for bridge foundations and structural design of flexible pavement, including the slope protection solution.

Hydrology, hydraulics and structures: Georeferenced inventory of existing drainage, pathological diagnosis of bridges to be reused and hydraulic/structural design of new vaults and bridges with channel profiles every 10 m.

2. Environmental, social and safety assessment

Socio-environmental management: Evaluation of physical, biological, and socioeconomic impacts under the IDB's Environmental and Social Policy Framework, with a priority focus on the impacts on the indigenous populations settled in the section.

Comprehensive road safety: Analysis of interaction between pedestrians, cyclists and vehicles for the definition of protection and signaling solutions in accordance with the Central American Manual of Uniform Traffic Control Devices (SIECA 2014).

3. Economic evaluation and bidding documents

Profitability analysis: Quantification of work quantities, structuring of unit prices and calculation of indicators at account prices (NPV with a 12% rate, TIRE, B/C and IBAN), accompanied by sensitivity analysis.

Bidding documents: Drafting of special technical specifications (description, materials, tolerances, measurement) and preparation of bidding documents under standard IDB formats.

Note: Interested companies should review the requirements on the BEO Bidder Portal. TheInter-AmericanDevelopmentBank(IDB)invitesspecializedconsultingfirmstosubmittheirproposalsforthepreparationofdetailedengineeringstudiesandtechnical,economic,socio-environmentalandriskassessmentfortheprojecttoimprovetheRDPET-08highway,intheAldeaChacte–SantaCruzFronterasection,locatedinthemunicipalityofSanLuis.departmentofPeten,Guatemala.Themainobjectiveistocomplementtheexistingpreliminarystudiestodevelopacomprehensiveexecutivedesignthatguaranteesthereliability,roadsafetyandsustainabilityofthecorridorfortheinternationaltransitofgoodsandpeople.1.TechnicalscopeandengineeringstudiesTrafficstudyandgeometricdesign:Modelingoftrafficvolumes,estimationofgrowthratesandgeometricdesignbasedontheSIECAmanual(RuralMinorArtery-ARMstandard)orAASHTO,withvalidationfromtheGeneralDirectorateofRoads(DGC).Topographyandrightsofway:Surveyofpolygons(stationsevery20montangentsand10moncurves)andcadastreoflandaffectedbyextensionsorchangesinlayoutforthedesignofright-of-wayplans.Geotechnicsandpavements:Executionofpits,SPTsoundings,soilcharacterization,rotarysoundingsforbridgefoundationsandstructuraldesignofflexiblepavement,includingtheslopeprotectionsolution.Hydrology,hydraulicsandstructures:Georeferencedinventoryofexistingdrainage,pathologicaldiagnosisofbridgestobereusedandhydraulic/structuraldesignofnewvaultsandbridgeswithchannelprofilesevery10m.2.Environmental,socialandsafetyassessmentSocio-environmentalmanagement:Evaluationofphysical,biological,andsocioeconomicimpactsundertheIDB'sEnvironmentalandSocialPolicyFramework,withapriorityfocusontheimpactsontheindigenouspopulationssettledinthesection.Comprehensiveroadsafety:Analysisofinteractionbetweenpedestrians,cyclistsandvehiclesforthedefinitionofprotectionandsignalingsolutionsinaccordancewiththeCentralAmericanManualofUniformTrafficControlDevices(SIECA2014).3.EconomicevaluationandbiddingdocumentsProfitabilityanalysis:Quantificationofworkquantities,structuringofunitpricesandcalculationofindicatorsataccountprices(NPVwitha12%rate,TIRE,B/CandIBAN),accompaniedbysensitivityanalysis.Biddingdocuments:Draftingofspecialtechnicalspecifications(description,materials,tolerances,measurement)andpreparationofbiddingdocumentsunderstandardIDBformats.Note:InterestedcompaniesshouldreviewtherequirementsontheBEOBidderPortal.

Executing unit: Inter-American Development Bank (IDB)

IDB project: RG-T4625

Contact: rafaelp@iadb.org

Financed by the Inter-American Development Bank (IDB).

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Construction & Infrastructure tenders

All Construction & Infrastructure tenders →

Ready to bid? Verify the details and apply on the official tender page.

Verify & apply on the official portal →
📣Your ad hereAdvertise or sponsor FreeTenderPut your brand in front of buyers, bidders & consultants.Get in touch →