FreeTender
Accepting bidstenderUnited States

Design-Build Services – STM Security Fencing - North Boundary

Issued by ENERGY, DEPARTMENT OF · ENERGY, DEPARTMENT OF · ALLIANCE SUSTAINABLE ENRGY-DOECONTR · via SAM.gov — US federal contract opportunities

Published
7 Oct 2026
Closes
12 Nov 2026
Reference
RFP-2027-27107
Location
CO, United States
Sector
Construction & Infrastructure

At a glance

ENERGY, DEPARTMENT OF · ENERGY, DEPARTMENT OF · ALLIANCE SUSTAINABLE ENRGY-DOECONTR in United States has published a tender in construction & infrastructure: “Design-Build Services – STM Security Fencing - North Boundary”. Submissions close on 12 November 2026, 35 days from today. Quote reference RFP-2027-27107 in any correspondence with the buyer. FreeTender has recorded 4 notices from this buyer since 2026, 3 of them currently open. There are 315 open construction & infrastructure notices in United States on FreeTender. Bids are submitted to the buyer through SAM.gov — US federal contract opportunities, not through FreeTender.

Details

ENERGY, DEPARTMENT OF · ENERGY, DEPARTMENT OF · ALLIANCE SUSTAINABLE ENRGY-DOECONTR is soliciting Design-Build Services – STM Security Fencing - North Boundary. Solicitation number RFP-2027-27107. Classified under NAICS 238990 — All Other Specialty Trade Contractors. Product/service code 5660 — FENCING, FENCES, GATES AND COMPONENTS. Place of performance: CO, USA. Responses are due by 12 November 2026 00:00 UTC. Posted on SAM.gov, the US federal contract opportunities system; registration is required to bid.

This description is intended to summarize the project at a high level for procurement purposes. Interested parties must refer to the full SOW for complete technical requirements, detailed scope elements, design and construction deliverables, environmental obligations, safety standards, and administrative procedures. The SOW governs all expectations for this procurement. Project Overview The National Laboratory of the Rockies (NLR) is soliciting design‑build services for installation of new perimeter fencing along the North boundary of the South Table Mountain (STM) Campus. The work includes designing and installing new fencing, removing designated sections of existing chain‑link fence, and completing all related construction activities in accordance with NLR’s design standards, construction specifications, and DOE site requirements. Portions of the work require coordination with the State Historic Preservation Office (SHPO). Interested parties must reference the full Statement of Work (SOW) for all detailed scope, technical requirements, and performance expectations. Design‑Build Requirements The Subcontractor shall develop and submit design documents consistent with NLR’s required 50% and 90% design reviews, followed by preparation of a complete 100% Issued‑for‑Construction package. All design work must comply with applicable codes, NLR Design Standards, and required CAD/BIM formats. Throughout the effort, the Subcontractor must maintain alignment with NLR’s design‑to‑cost objectives and utilize Procore for all project documentation, including drawings, specifications, RFIs, and submittals. Construction Requirements All construction activities must comply with NLR’s safety, security, and environmental guidelines, including requirements for site access, personnel qualifications, and safe work practices. The Subcontractor is responsible for completing all utility locates before performing any excavation and must implement erosion control, material handling, and environmental protection measures as required. Waste prevention, recycling, and proper tracking of off‑site disposal activities must be performed in accordance with the SOW and associated exhibits. Management, Coordination, and Quality Assurance The Subcontractor shall provide qualified project management and on‑site supervision, maintain an approved Quality Assurance Plan, and participate in all required meetings, field observations, testing, and commissioning activities. The Subcontractor is responsible for coordinating deliveries, securing access authorization for personnel, and following all NLR and DOE security protocols. At project completion, the Subcontractor must deliver accurate as‑built documentation, testing records, and turnover materials in accordance with NLR standards and support NLR’s Beneficial Occupancy process.

Context for bidders

We hold 4 notices from ENERGY, DEPARTMENT OF · ENERGY, DEPARTMENT OF · ALLIANCE SUSTAINABLE ENRGY-DOECONTR, going back to September 2026 — 3 of them still open. They buy mostly in Research, Studies & Evaluation, Construction & Infrastructure and Manufacturing & Supply. There are 315 open Construction & Infrastructure tenders in United States. This one closes in 35 days.

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Construction & Infrastructure tenders

All Construction & Infrastructure tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →