Consulting to develop an Electrical Master Plan (PME) for Electro Ucayali S.A., 2050
Issued by Inter-American Development Bank (IDB) · via IDB — BID for the Americas (Inter-American Development Bank)
- Published
- 21 Aug 2026
- Closes
- 1 Sept 2026, 02:59 UTC
- Value
- USD 90,000
- Reference
- PE-T1642
- Location
- Peru
- Sector
- Energy & Power
Details
The Inter-American Development Bank (IDB), in coordination with Electro Ucayali S.A., invites consulting companies to submit proposals for the preparation of the Electricity Master Plan 2026-2050 (Selection No. PE-T1642-B260095). The objective is to design a comprehensive strategy to guarantee a safe, reliable, sustainable and affordable electricity supply in the Ucayali Region, Peru.
1. Geographical scope and time horizons
Scope of study: Ucayali Region (provinces of Coronel Portillo, Padre Abad, Atalaya and Purús) and adjacent border or interconnection areas (Loreto, Huánuco, Junín and neighboring isolated systems).
Planning period (2026–2050):
Short term: 2026–2030 (immediate priority projects and investments).
Medium term: 2031–2040 (consolidation and integration of infrastructure).
Long-term: 2041–2050 (strategic vision of decarbonization and resilience).
2. Main components of the Master Plan (SMP)
Diagnosis and projection of demand: Evaluation of the state of the current infrastructure (generation, transmission, subtransmission, distribution) and modeling of energy/power demand by 2050, incorporating socioeconomic growth, energy efficiency and electromobility.
Renewable generation strategy: Evaluation of the potential of renewable sources (solar, biomass, wind and small hydro), diversification of the energy matrix and analysis of vulnerability to climate risks.
Transmission and sub-transmission expansion plans: Modeling of the network that interconnects Pucallpa, Campo Verde and Aguaytía, resolving bottlenecks under N-1 safety criteria and in coordination with Osinergmin's Transmission Investment Plan (PIT).
3. Architecture for Isolated Systems and Investment
NCRE + BESS hybrid systems: Design of hybrid solutions with high penetration of Non-Conventional Renewable Energies integrated with Battery Energy Storage (BESS) and efficient diesel thermal backup/biofuel for the isolated areas of Atalaya and Purús.
Network regulation: Definition of BESS systems for peak support and frequency regulation in non-interconnected areas.
Project and investment portfolio: Formulation of the comprehensive investment plan at market prices and costs recognized by regulations for the three time horizons.
Note: Interested companies should review the requirements on the BEO Bidder Portal. TheInter-AmericanDevelopmentBank(IDB),incoordinationwithElectroUcayaliS.A.,invitesconsultingcompaniestosubmitproposalsforthepreparationoftheElectricityMasterPlan2026-2050(SelectionNo.PE-T1642-B260095).Theobjectiveistodesignacomprehensivestrategytoguaranteeasafe,reliable,sustainableandaffordableelectricitysupplyintheUcayaliRegion,Peru.1.GeographicalscopeandtimehorizonsScopeofstudy:UcayaliRegion(provincesofCoronelPortillo,PadreAbad,AtalayaandPurus)andadjacentborderorinterconnectionareas(Loreto,Huanuco,Juninandneighboringisolatedsystems).Planningperiod(2026–2050):Shortterm:2026–2030(immediatepriorityprojectsandinvestments).Mediumterm:2031–2040(consolidationandintegrationofinfrastructure).Long-term:2041–2050(strategicvisionofdecarbonizationandresilience).2.MaincomponentsoftheMasterPlan(SMP)Diagnosisandprojectionofdemand:Evaluationofthestateofthecurrentinfrastructure(generation,transmission,subtransmission,distribution)andmodelingofenergy/powerdemandby2050,incorporatingsocioeconomicgrowth,energyefficiencyandelectromobility.Renewablegenerationstrategy:Evaluationofthepotentialofrenewablesources(solar,biomass,windandsmallhydro),diversificationoftheenergymatrixandanalysisofvulnerabilitytoclimaterisks.Transmissionandsub-transmissionexpansionplans:ModelingofthenetworkthatinterconnectsPucallpa,CampoVerdeandAguaytia,resolvingbottlenecksunderN-1safetycriteriaandincoordinationwithOsinergmin'sTransmissionInvestmentPlan(PIT).3.ArchitectureforIsolatedSystemsandInvestmentNCRE+BESShybridsystems:DesignofhybridsolutionswithhighpenetrationofNon-ConventionalRenewableEnergiesintegratedwithBatteryEnergyStorage(BESS)andefficientdieselthermalbackup/biofuelfortheisolatedareasofAtalayaandPurus.Networkregulation:DefinitionofBESSsystemsforpeaksupportandfrequencyregulationinnon-interconnectedareas.Projectandinvestmentportfolio:Formulationofthecomprehensiveinvestmentplanatmarketpricesandcostsrecognizedbyregulationsforthethreetimehorizons.Note:InterestedcompaniesshouldreviewtherequirementsontheBEOBidderPortal.
Executing unit: Inter-American Development Bank (IDB)
IDB project: PE-T1642
Contact: [contact details removed]
Financed by the Inter-American Development Bank (IDB).
Context for bidders
Inter-American Development Bank (IDB) has 20 open notices on FreeTender. There is 1 open Energy & Power tender in Peru. This one closes in 11 days.
More from this buyer
- Consulting for Diagnosis and Mapping of the Tariff Change Flow of CAMEX
- Consultancy service for carrying out face-to-face surveys within the framework of the impact assessment of the public transport subsidy
- Feasibility study for the design of a mixed carbon pricing instrument in Peru (carbon tax, emissions trading system)
- Preliminary Analysis of the Business Case for the development of the Academy of Prosecutors of the Public Ministry of Chile, via Public-Private Partnerships (PPP)
- Strategic Infrastructure Investment Planning for Andean Productive Corridors: From Baseline to Bankable Projects
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this energy & power opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Energy & Power tenders
- Engagement of Supporting Staff on purely Temporary Basis through Placement Agency for the National Highway Division, ChitradurgaMinistry of Road Transport and Highways · P6 Delhi - MoRTH · RO Bangalore - MoRTH · NH Division-Chitradurga - MoRTH · India
- RMO electrical and mechanical services at 200 bedded JPC Hospital, Shastri Park, Delhi.Public Works Department · CE/SE/B2-B24 · EE/B242(N) · India
- Providing High Mast LED Fittings 9 mtr Height at ward no 10 SIPCOT Roundana at Perundurai MunicipalityMAWS · Perundurai Municipality · India
- Purchase of Street Light EquipmentsDirectorate of Panchayat · Deputy Director of Panchayat Kollam · Thazhava Gramapanchayat · India
- Providing, installation, testing and commissioning of solar batteries against BER with buyback of old batteries for 25 KWp solar power plant installed at BOP S S Nagar, Jhinga, Gumti, Pargumti and Kanikathi of 77 Bn BSF under SHQ BSF Kolkata (Ftr SB)DG,BSF,MHA · South Bengal(Kolkata),BSF,MHA · India
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →