CFAs: Retrofit Pathway Study for Sustainable Affordable Housing (Canada)
Issued by Government of Canada. · via fundsforNGOs — grants & funding calls
- Published
- 3 Sept 2026
- Closes
- 31 Dec 2026, 23:59 UTC
- Reference
- cfas-retrofit-pathway-study-for-sustainable-affordable-housing-canada
- Location
- Canada
- Sector
- Facility Management & Cleaning
At a glance
Government of Canada. in Canada has published a funding call in facility management & cleaning: “CFAs: Retrofit Pathway Study for Sustainable Affordable Housing (Canada)”. Submissions close on 31 December 2026, 49 days from today. Quote reference cfas-retrofit-pathway-study-for-sustainable-affordable-housing-canada in any correspondence with the buyer. There are 99 open facility management & cleaning notices in Canada on FreeTender. Bids are submitted to the buyer through fundsforNGOs — grants & funding calls, not through FreeTender.
Details
Deadline: 31-Dec-2026
The Retrofit Pathway Study Grant supports Canadian municipal, non-profit, and cooperative housing providers in planning phased building retrofits that reduce energy consumption and greenhouse gas (GHG) emissions while maintaining safe, reliable, and affordable housing. The grant supports comprehensive studies that compare retrofit options over 10-year and 20-year timelines and help housing providers coordinate upgrades with capital planning and equipment replacement schedules. Grants of up to $65,000 for a single building and $200,000 for a portfolio of buildings are available, covering up to 80% of eligible costs. Eligible Indigenous communities may qualify for up to 100% of eligible costs. What Is the Retrofit Pathway Study Grant? The Retrofit Pathway Study Grant is part of the Sustainable Affordable Housing initiative delivered through the Federation of Canadian Municipalities’ Green Municipal Fund and funded by the Government of Canada. The grant helps housing providers develop long-term strategies for improving the energy performance of existing affordable housing. Rather than funding a single isolated upgrade, the program supports studies that help organizations determine how different building improvements can be phased over time.
The approach allows housing providers to:
- Assess existing building performance. - Identify energy and GHG reduction opportunities. - Compare multiple retrofit pathways. - Understand projected costs and energy impacts. - Coordinate improvements with capital plans. - Align upgrades with equipment replacement schedules. - Plan long-term building improvements. - Maintain affordability and housing reliability. Why the Retrofit Pathway Approach Matters Affordable housing providers often need to balance energy improvements with limited capital resources, equipment replacement cycles, tenant needs, and long-term building maintenance. A phased retrofit pathway can help organizations make these decisions systematically. The study allows housing providers to compare different scenarios rather than committing immediately to a single retrofit strategy. This can help answer important planning questions such as: - Which building systems should be upgraded first? - How much energy could different retrofit strategies save? - How much could GHG emissions be reduced? - What are the projected costs of different pathways? - Which improvements should be coordinated with equipment replacement? - How can upgrades be phased over 10 and 20 years? - How can housing remain safe, reliable, and affordable during the transition? Main Objectives of the Grant The Retrofit Pathway Study Grant is designed to help housing providers plan long-term building improvements that achieve substantial reductions in energy use and GHG emissions.
The main objectives include:
- Improve energy efficiency in existing affordable housing. - Reduce greenhouse gas emissions. - Develop phased retrofit pathways. - Compare different retrofit scenarios. - Support long-term capital planning. - Coordinate building upgrades with equipment replacement. - Maintain safe and reliable housing. - Protect long-term housing affordability. - Support higher-performance retrofit strategies. - Explore electrification where buildings currently rely on fossil fuels. What Does the Retrofit Study Need to Assess? The grant supports comprehensive studies rather than limited assessments. The required study must include several core elements. Baseline Energy and GHG Assessment The study must establish a baseline for the building’s current: - Energy use. - Greenhouse gas emissions. This baseline provides the reference point for evaluating future retrofit scenarios. Building Components and Systems Inventory Applicants must also develop an inventory of relevant building components and systems. This helps establish the current condition and characteristics of the building and provides the foundation for comparing future retrofit pathways. Multiple Retrofit Scenarios The study must evaluate multiple retrofit scenarios over both 10-year and 20-year timelines. The scenarios allow housing providers to compare different approaches to improving building performance. Required Retrofit Scenarios At least three scenarios must be included in the study.
These include:
- Like-for-like replacement scenario: A scenario based on replacing building components or systems with similar replacements.
- Higher-performance scenario: A scenario that provides greater energy or GHG performance than like-for-like replacement.
- Second higher-performance scenario: Another higher-performance pathway that provides an alternative approach to achieving improved building performance.
At least one of the higher-performance scenarios must explore electrification when the building currently uses fossil fuels. Energy and GHG Reduction Targets The scenarios must meet or exceed minimum energy or GHG reduction targets. 10-Year Targets Within the 10-year pathway, the study must achieve at least one of the following: - 50% reduction in GHG emissions, or - 40% reduction in energy use. 20-Year Targets Within the 20-year pathway, the study must achieve at least one of the following: - 80% reduction in GHG emissions, or - 60% reduction in energy use. These targets are important when developing and comparing the proposed retrofit scenarios. Electrification Requirement For buildings that currently use fossil fuels, at least one higher-performance scenario must explore electrification. This ensures that the study considers pathways that can substantially reduce dependence on fossil-fuel-based building systems. Electrification should therefore be incorporated into the scenario analysis where applicable rather than treated as an unrelated option. 10-Year and 20-Year Retrofit Planning One of the defining features of the grant is its long-term planning approach. The study must assess retrofit pathways across: - A 10-year timeline. - A 20-year timeline. This enables
Context for bidders
There are 99 open Facility Management & Cleaning tenders in Canada. This one closes in 49 days.
Similar Facility Management & Cleaning tenders
- Fourniture sur demande de produits et accessoires d’entretien ménager· closes 7 Dec
- Exploitation d'une concession alimentaire à la place des Canotiers· closes 18 Dec
- Acquisition d’équipements d’entretien ménager· closes 14 Dec
- Water Treatment Preventive Maintenance Services at Various City of Peterborough Facilities· closes 3 Dec
- Station Workwear for a One (1) Year Period· closes 27 Nov
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this facility management & cleaning opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
Who won similar contracts
Recent contract awards in Canada, from published award notices.
- ÉTUDE DE FAISABILITÉ POUR LA MISE EN PLACE D’UN CENTRE NATIONAL DE RECHERCHE SCIENTIFIQUE (CNRS).Won by CIDE (consortium International De Developpement EN Education) (Canada) · USD 229,830.00 · 17 Aug 2026
More Facility Management & Cleaning tenders
- оказание услуги по техническому обслуживанию пожарной сигнализации, системы оповещения и управления эвакуациейМОУ "ЗЕЛЕНОВСКАЯ СШ" · Russia
- Согласно ФЗ №44 от 05.04.2013г. ст.93 ч.1 п. 4. Техническое обслуживание радиопередающего оборудования системы передачи извещений о пожаре "Стрелец-Мониторинг" с 01.01.2027 года по 31.12.2027 годаМУНИЦИПАЛЬНОЕ ОБЩЕОБРАЗОВАТЕЛЬНОЕ УЧРЕЖДЕНИЕ "СРЕДНЯЯ ШКОЛА № 124 КРАСНОАРМЕЙСКОГО РАЙОНА ВОЛГОГРАДА" · Russia
- Согласно ФЗ №44 от 05.04.2013г. ст.93 ч.1 п. 4. Техническое обслуживание оборудования СКУД с 01.01.2027 - 31.12.2027МУНИЦИПАЛЬНОЕ ДОШКОЛЬНОЕ ОБРАЗОВАТЕЛЬНОЕ УЧРЕЖДЕНИЕ "ДЕТСКИЙ САД № 309 КРАСНОАРМЕЙСКОГО РАЙОНА ВОЛГОГРАДА" · Russia
- Согласно ФЗ №44 от 05.04.2013г. ст.93 ч.1 п. 4. Техническое обслуживание радиопередающего оборудования системы передачи извещений о пожаре "Стрелец-Мониторинг" с 01.01.2027 года по 31.12.2027 годаМОУ ДЕТСКИЙ САД № 223 · Russia
- Согласно ФЗ №44 от 05.04.2013г. ст.93 ч.1 п.4. Техобслуживание комплекса тех.средств безопасности (тревожная сигнализация) в период с 01.01.2027г. - по 31.12.2027г.МОУ ДЕТСКИЙ САД № 223 · Russia
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →