FreeTender
Accepting bidstenderUnited States

B118 Fire Panel — Installation of Equipment- Alarm, Signal, and Security Detection Systems

Issued by DEPT OF DEFENSE · DEPT OF THE ARMY · NGB · W7NU USPFO ACTIVITY OHANG 180 · via SAM.gov — US federal contract opportunities

Published
2 Sept 2026
Closes
10 Sept 2026, 14:00 UTC
Reference
W50S8S26QA013
Location
OH, United States
Sector
Construction & Infrastructure

Details

DEPT OF DEFENSE · DEPT OF THE ARMY · NGB · W7NU USPFO ACTIVITY OHANG 180 is soliciting B118 Fire Panel — Installation of Equipment- Alarm, Signal, and Security Detection Systems. Solicitation number W50S8S26QA013. Classified under NAICS 238210 — Electrical Contractors. Product/service code N063 — INSTALLATION OF EQUIPMENT- ALARM, SIGNAL, AND SECURITY DETECTION SYSTEMS. Place of performance: OH, USA. Responses are due by 10 September 2026 14:00 UTC. Posted on SAM.gov, the US federal contract opportunities system; registration is required to bid.

Solicitation has been amended: Quoters must acknowledge amendment in section 19.

Amendment 1 (2 September 2026):

Request for Information (RFIs) have been received and answered. Q&A Document is attached to this posting along with the new 1442 acknowledging the amendment to include Q&As. Additionally, the offers due date has been changed from 3 September 2026 at 10 AM Eastern to 10 September 2026 10 AM Eastern time. This change allows time for acknowledgement of the amendment. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~ The 180th Fighter Wing is issuing a Request for Quotes to award a single firm fixed-price contract for commercial construction services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, and supervision necessary for roof repairs on buildings 101 and 136, located at the 180th Fighter Wing (FW), Swanton, Ohio Air National Guard Base. This project includes a Brand Name requirement for the fire panel (Monaco) and the justification is attached to this posting. Objective is

Phase 1 – Design & Demolition:

  • Provide a complete, stamped Fire Protection System design from a NICET certified designer.
  • Demo the existing Simplex Panel, carefully labeling all inputs and outputs for transfer to the new system.
  • Demo the existing Monaco M-2 Panel, carefully labeling all inputs and outputs.
  • Demo the existing Monaco BT2-8, antenna, and lightning arrestor.

Phase 2 – FACP Installation and Upgrade:

  • Install a new Monaco MAPP X panel, complete with all necessary expansion cards and devices to accommodate all existing and new equipment.
  • Install a new NFPA-compliant battery backup system and cabinet.
  • Install a new antenna and lightning arrestor system for the new panel.
  • Replace approximately 90 existing smoke detectors with new, compatible models.
  • Replace approximately 12 existing heat detectors.
  • Replace approximately 4 existing duct detectors.
  • Replace approximately 18 existing pull stations.
  • Replace approximately 22 existing horn strobes.
  • Install all new copper wiring as required to connect all devices to the new FACP.
  • Fully program the new FACP to manage all connected initiating and notification devices.
  • Perform a complete 100% functional and acceptance test of the entire system in accordance with NFPA and UFC standards, to be witnessed by the COR and Base Fire Department.

In accordance with the attached Performance Work Statement. The contract duration will be 90 days after award. This project is set aside 100% for Small Business. The North American Industry Classification (NAICS) Code is 238210, with a size standard of $19,000,000.00. The magnitude is between $25,000 and $100,000. Alternative payment protections apply under clause 52.228-13. The contractor shall submit one of the following payment protections: An irrevocable letter of credit (ILC), A tripartite escrow agreement, Certificates of deposit, or a payment bond. The amount of the payment protection shall be 100 percent of the contract price. The submission of the payment protection is required within 10 days of contract award. The payment protection shall provide protection for the full contract performance period plus a one-year period. Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties. When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement. An optional site visit will be held on Wednesday August 26th, 9am local time, at the 180th Fighter Wing 2660 S Eber Rd, Swanton, Ohio 43558. Interested parties are required to RSVP to [contact details removed] with the number of visitors attending, names, and company information by Tusday August 25th, 4pm local time. REAL ID drivers license is required for access to the installation, those without compliant identification will not be allowed on base. Any questions related to this posting can be sent to [contact details removed].

Context for bidders

There are 516 open Construction & Infrastructure tenders in United States. This one closes in 3 days.

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Construction & Infrastructure tenders

All Construction & Infrastructure tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →