FreeTender
Accepting bidstenderUnited States

Wright-Patterson Air Force Base Multiple Award Construction Contract (MACC)

Issued by DEPT OF DEFENSE · DEPT OF THE AIR FORCE · AIR FORCE MATERIEL COMMAND · AIR FORCE LIFE CYCLE MANAGEMENT CENTER · FA8601 AFLCMC PZIO · via SAM.gov — US federal contract opportunities

Published
20 Nov 2026
Closes
11 Dec 2026, 19:00 UTC
Reference
FA860127R0004
Location
United States
Sector
Construction & Infrastructure

At a glance

DEPT OF DEFENSE · DEPT OF THE AIR FORCE · AIR FORCE MATERIEL COMMAND · AIR FORCE LIFE CYCLE MANAGEMENT CENTER · FA8601 AFLCMC PZIO in United States has published a tender in construction & infrastructure: “Wright-Patterson Air Force Base Multiple Award Construction Contract (MACC)”. Submissions close on 11 December 2026, 21 days from today. Quote reference FA860127R0004 in any correspondence with the buyer. FreeTender has recorded 29 notices from this buyer since 2026, 5 of them currently open. There are 392 open construction & infrastructure notices in United States on FreeTender. Bids are submitted to the buyer through SAM.gov — US federal contract opportunities, not through FreeTender.

Key requirements

Taken from the notice by FreeTender. The tender document on the official portal is binding — check it, and any corrigendum, before you bid.

To bid on SAM.gov (US federal)

You need an active SAM.gov entity registration with a Unique Entity ID (UEI) to be awarded a federal contract. Check the set-aside and NAICS size standard before you respond.

Details

DEPT OF DEFENSE · DEPT OF THE AIR FORCE · AIR FORCE MATERIEL COMMAND · AIR FORCE LIFE CYCLE MANAGEMENT CENTER · FA8601 AFLCMC PZIO is soliciting 2027-2034 Wright-Patterson Air Force Base Multiple Award Construction Contract (MACC). Solicitation number FA860127R0004. Classified under NAICS 236220 — Commercial and Institutional Building Construction. Product/service code Z2JZ — REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS. Responses are due by 11 December 2026 19:00 UTC. Posted on SAM.gov, the US federal contract opportunities system; registration is required to bid.

This is a follow-on Multiple Award Construction Contract (MACC) Indefinite-Delivery Indefinite-Quantity (IDIQ) contract for design-build, design-bid-build, and Progressive Design Build (PDB) construction projects, which are specific to WPAFB, and applicable to individual Task Orders. Work will consist of a broad range of maintenance, repair, alteration and/or new construction work on various real property. Type of work the contractor can expect (not inclusive): new construction of buildings and structures; alteration and repair of buildings, structures, roads, airfields, ground, roofs; specialty construction; utilities; and miscellaneous services including remediation/hazardous waste removal (i.e. asbestos, lead paint etc.). Contractor efforts may also include design/build from concept to 100% design. Amendment 0001 incorporates the most recent round of Requests for Information (RFIs) and updates Attachments 1, 2, 3, 5, 8, 9, and 10. Attachment 4 is removed from the solicitation. Amendment 0002 incorporates the remaining RFIs and updates Attachments 1, 2, 3, 7, and 8.

Context for bidders

We hold 29 notices from DEPT OF DEFENSE · DEPT OF THE AIR FORCE · AIR FORCE MATERIEL COMMAND · AIR FORCE LIFE CYCLE MANAGEMENT CENTER · FA8601 AFLCMC PZIO, going back to August 2026 — 5 of them still open. They buy mostly in Manufacturing & Supply, Electronics & Semiconductors and Facility Management & Cleaning. There are 392 open Construction & Infrastructure tenders in United States. This one closes in 21 days.

Explore United States

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Construction & Infrastructure tenders

All Construction & Infrastructure tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →