USCGC Healy Relief Valves Overhaul — Maint-Rep of Ship & Marine EQ
Issued by HOMELAND SECURITY, DEPARTMENT OF · U.S. COAST GUARD · SFLC PROCUREMENT BRANCH 2(00085) · via SAM.gov — US federal contract opportunities
- Published
- 23 Sept 2026
- Closes
- 28 Sept 2026, 15:00 UTC
- Reference
- 70Z08526Q0028500
- Location
- WA, United States
- Sector
- Manufacturing & Supply
Details
HOMELAND SECURITY, DEPARTMENT OF · U.S. COAST GUARD · SFLC PROCUREMENT BRANCH 2(00085) is soliciting USCGC Healy Relief Valves Overhaul — Maint-Rep of Ship & Marine EQ. Solicitation number 70Z08526Q0028500. Classified under NAICS 336611 — Ship Building and Repairing. Product/service code J020 — MAINT-REP OF SHIP & MARINE EQ. Place of performance: WA, USA. Responses are due by 28 September 2026 15:00 UTC. Posted on SAM.gov, the US federal contract opportunities system; registration is required to bid.
STATEMENT OF WORK (SOW)
Vessel: USCGC HEALY (WAGB 20)
Project: Relief Valves Overhaul
1.0 SCOPE Requirements for the inspection, overhaul, and testing of two (2) relief valves, Part Number: S8LJE-02RF1-03RF1-SS-H2-TB, belonging to the United States Coast Guard Cutter (USCGC) HEALY, homeported in Seattle, WA. 2.0 BACKGROUND USCGC HEALY requires routine periodic maintenance and overhaul of mechanical systems to ensure operational readiness and safety. The specified relief valve requires a full overhaul, including the replacement of all soft goods, reassembly, and testing to restore it to Original Equipment Manufacturer (OEM) specifications. 3.0 REFERENCES The Contractor shall adhere to the following references during the performance of this
work:
3.1 Original Equipment Manufacturer (OEM) Technical Manuals and specifications for
PN: S8LJE-02RF1-03RF1-SS-H2-TB.
3.2 U.S. Coast Guard Standard Specification (CG-47) - General Requirements for Ship Repair. 4.0 TECHNICAL REQUIREMENTS CLIN 001 The Contractor shall provide all labor, materials, equipment, and facilities necessary to
perform the following:
4.1 Disassembly and Cleaning Carefully disassemble the relief valve in accordance with OEM guidelines. Thoroughly clean all internal and external components to remove scale, debris, and marine growth without damaging the base metal or seating surfaces. 4.2 Inspection Perform a visual and dimensional inspection of all hard parts (body, spring, stem, disc, nozzle, etc.). Identify any wear, pitting, scoring, or damage that exceeds OEM tolerances.
Deliverable: Submit a Condition Found Report (CFR) to the Coast Guard Technical
Point of Contact (TPOC) detailing the inspection results and recommending any additional repairs or replacement of hard parts prior to proceeding. 4.3 Overhaul and Reassembly Upon approval of the CFR, replace all soft goods (including O-rings, gaskets, packing, and seals) using 100% genuine OEM replacement parts. Machine or lap seating surfaces as necessary to achieve a proper seal, strictly within OEM tolerances. Reassemble the valve in accordance with OEM specifications, applying the correct torque values to all fasteners. 4.4 Testing and Calibration Perform hydrostatic shell testing and seat leakage testing in accordance with applicable OEM and industry standards. Set, calibrate, and pop-test the relief valve to the designated set pressure required by the ship's system parameters. Aix a new metallic calibration tag to the valve indicating the set pressure, test date, and contractor identification.
Deliverable: Provide a certified Test Report documenting the set pressure, pop
pressure, reseat pressure, and confirmation of zero leakage. 5.0 GOVERNMENT FURNISHED PROPERTY (GFP) The Coast Guard will provide the following:
Two (2) Relief Valve, PN: S8LJE-02RF1-03RF1-SS-H2-TB. USCG will ship valves to the
contractor. Contractor is responsible for shipment of valves to USCG Base Seattle via two-day delivery methods.
6.0 Period of Performance: within 15 days from the award.
6.1 CLIN 0002: Potential Repairs based on CFR not to exceed ($1,500 dollars)
6.2. Pricing for any additional travel costs, material, or field service days will be requested and handled by the KO under the terms of the contract. Any repairs beyond the base scope identified because of the troubleshooting shall be documented in a Condition Found Report (CFR) with a technical description of the recommended repairs. The CFR shall be provided to the Technical POCs and the Contracting Oicer. 6.3. Any additional work will be authorized only by the KO through a written contract modification. The contractor shall not perform any repairs beyond the base scope until specifically authorized in writing by the KO. If the Government elects to proceed with additional repairs, the KO will issue a written contract modification that identifies the authorized additional work and associated firm fixed price. The contractor shall base any proposal for additional repairs on the findings in the CFR.
For questions regarding this SOW contact: MKCM Armando Perez @
[contact details removed]
Context for bidders
We hold 42 notices from HOMELAND SECURITY, DEPARTMENT OF · U.S. COAST GUARD · SFLC PROCUREMENT BRANCH 2(00085), going back to August 2026 — 12 of them still open. They buy mostly in Manufacturing & Supply, Financial & Professional Services and electronics-semiconductors. There are 3,256 open Manufacturing & Supply tenders in United States. This one closes in 4 days.
More from this buyer
- Repair / Overhaul Allied Systems Marine Crane Dual Point Davits· closes 20 Oct
- Uscgc Calhoun DS FQ2 FY27 — Non-Nuclear Ship Repair (East)· closes 7 Oct
- CGC Healy Fire Detection System Overhaul· closes 29 Sept
- CGC Hollyhock Drydock — Non-Nuclear Ship Repair (West)· closes 7 Oct
- CGC Healy Vacuum Breaker Valves — Non-Nuclear Ship Repair (West)· closes 28 Sept
Similar Manufacturing & Supply tenders
- Retainer, Spare Tire — 57 each, NSN· closes 9 Oct
- Seal, Hatch Rim — 82 each, NSN· closes 9 Oct
- Box, Accessories Stowag — 56 each, NSN· closes 9 Oct
- Filter Element, Fluid — 444 each, NSN· closes 9 Oct
- Valve, Pneumatic Tire — 182 each, NSN· closes 9 Oct
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this manufacturing & supply opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Manufacturing & Supply tenders
- Fornecimento de CadeirasDIRECCAO PROVINCIAL DE CULTURA E TURISMO DE INHAMBANE · Mozambique
- Cleaning, Replacing with new filter media of Water Treatment plant and repairs to pipe line and valve at Hailakandi BSNL Quarter Complex SilcharBSNL — Assam · India
- Proposed Civil & Interior Works for Proposed Renovation of Ground Floor Canteen in Main Building at OUR LHO Campus, Bengaluru.State Bank of India · India
- 9967 Supply of Various Steel Sections and PlatesIarnród Eireann-Irish Rail · Ireland
- PRE-QUALIFICATION QUESTIONNAIRE (PQQ) for Design, Build, Manufacture and Installation of Adaptable Educational Workstation Frames for TU DublinTechnological University Dublin (TU Dublin) · Ireland
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →