USCG Station Lake Worth Inlet HVAC Diagnostic and Repairs
- Published
- 23 Oct 2026
- Closes
- 12 Nov 2026, 18:00 UTC
- Reference
- 3930313PR270000003
- Location
- FL, United States
- Sector
- Construction & Infrastructure
At a glance
A buyer in United States has published a tender in construction & infrastructure: “USCG Station Lake Worth Inlet HVAC Diagnostic and Repairs”. Submissions close on 12 November 2026, 19 days from today. Quote reference 3930313PR270000003 in any correspondence with the buyer. There are 352 open construction & infrastructure notices in United States on FreeTender. Bids are submitted to the buyer through SAM.gov — US federal contract opportunities, not through FreeTender.
Details
A US federal agency is soliciting USCG Station Lake Worth Inlet HVAC Diagnostic and Repairs. Solicitation number 3930313PR270000003. Classified under NAICS 238220 — Plumbing, Heating, and Air-Conditioning Contractors. Product/service code J041 — MAINT/REPAIR/REBUILD OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT. Place of performance: FL, USA. Responses are due by 12 November 2026 18:00 UTC. Posted on SAM.gov, the US federal contract opportunities system; registration is required to bid.
COMBINED SYNOPSIS / SOLICITATION FOR COMMERCIAL SERVICES
Solicitation Number: 3930313PR270000003
Project Title: HVAC Diagnostic and Repairs at USCG Station Lake Worth Inlet
Issuing Agency: United States Coast Guard (USCG) – Base Miami Beach (P&C) / CGD-SE
Notice Type: Combined Synopsis / Solicitation
Set-Aside Status: 100% Total Small Business Set-Aside
Applicable NAICS Code: 238220 – Plumbing, Heating, and Air-Conditioning Contractors
Small Business Size Standard: $19.0 Million
Contract Type: Firm-Fixed-Price (FFP)
Acquisition Authority: FAR Subpart 12.6, FAR Part 13 (Simplified Acquisition Procedures), and FAR Part 15
1. General Notice & Acquisition Overview
This document constitutes a combined synopsis/solicitation for commercial services prepared in accordance with the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice.
- Sole Solicitation: This announcement constitutes the only solicitation; no separate written solicitation will be issued.
- Small Business Set-Aside: This procurement is advertised as a 100% Total Small Business Set-Aside under NAICS code 238220.
- Basis for Award: Award will be made using simplified acquisition procedures to the responsible offeror whose proposal conforms to the solicitation requirements and represents the Lowest Price Technically Acceptable (LPTA) to the Government.
2. Key Procurement Schedule & Contacts
Milestone / Requirement Date / Time Details / Point of Contact Organized Site Visit
October 29 , 2026 @ 09: 00 AM EST (Coordinate base access 48 hrs in advance)
Questions Deadline
November 05, 2026 @ 1: 00 PM EST
Submit via email using the mandatory subject format below. Proposal Submission Deadline
November 12, 2026 @ 1: 00 PM EST
Electronic submission to Contracting Officer: Ulric.Waldron@uscg.mil. Period of Performance 14 Calendar Days All assessment, repair, testing, closeout documentation, and O&M manual submissions must be completed within 14 calendar days post-award. Authorized Work Hours Mon – Fri, 0700 – 1600 (7:00 AM – 4:00 PM) Work outside these hours requires prior written approval from the Coast Guard unit command/COR. No weekend or federal holiday work authorized without prior consent. Points of Contact
- Contracting & Proposal Inquiries:
Ulric Waldron, Contracting Officer / Contract Specialist
Email: Ulric.Waldron@uscg.mil
Mailing / Delivery Address:
Commanding Officer USCG Base Miami Beach (P&C)
Attn: [contact details removed]
16001 SW 117th Avenue Miami, FL 33177
- Technical, Scheduling Inquiries & Site Visit Access:
MKC Marissa Massey
Phone: [contact details removed]
Email: MARISSA.A.MASSEY@USCG.MIL
3. Place of Performance
- Facility: U.S. Coast Guard Station Lake Worth Inlet
- Building: Station Building (STA BULDG - CGD-SE)
- Physical Address:
3300 Lakeshore Drive Riviera Beach, FL 33404
4. Scope of Work (Summary of Specifications)
4.1 General Work Requirements The Contractor shall furnish all necessary labor, materials, equipment, transportation, and supervision to perform a comprehensive diagnostic assessment and repairs of the facility’s HVAC and cooling tower systems:
- Inspection & Assessment: Inspect all HVAC equipment, cooling towers, circulating pumps, piping, controls, and associated electrical/mechanical distribution assemblies.
- Operational Testing: Evaluate overall system condition, measure operational readings (pressures, temperatures, electrical draws, airflow), and identify functional deficiencies, component failures, and root causes of performance issues.
- Corrective Actions & Repairs: Execute required repairs, maintenance, component replacements, and necessary adjustments in accordance with manufacturer standards and National Electric Code (NEC).
- Comprehensive Summary Report: Provide a formal engineering/technical diagnostic report including detailed findings, photographic documentation, recommended follow-on corrective actions, and budgetary cost estimations.
4.2 Contractor Qualifications & Technical Standards
- Licensing: All installation, diagnostic, and repair work shall be performed by an HVAC contractor actively licensed and certified in the State of Florida.
- Code Compliance: All electrical and mechanical work shall strictly comply with the most current edition of the National Electrical Code (NEC) and applicable ASHRAE standards.
- Safety & Hot Work: The contractor shall comply with all Coast Guard safety regulations, including obtaining required hot work permits prior to open-flame brazing, cutting, or welding.
- Utilities & Facility Operations: Reasonable quantities of electricity and potable water will be made available without charge. The contractor shall furnish necessary backflow preventers, connections, and temporary facilities if required. Coordinate all staging and equipment laydown areas with the COR.
4.3 Required Submittals & Deliverables
- Personnel Roster: Full roster of on-site personnel submitted prior to pre-work conference (First Name, Last Name, Job Title, Company). All personnel must comply with the REAL ID Act of 2005 for base entry.
- Safety Program Plan: Outlining accident prevention, fall protection, and site-specific hazard mitigation.
- Project Schedule: Work progression schedule showing milestones within the 14-calendar-day performance period.
- Product Data Sheets: Technical catalog cuts and manufacturer specifications for any replaced components.
- Operation & Maintenance (O&M) Manuals & Training: Electronic submittal containing warranty details, parts list, test data, startup/shutdown sequence, and provision of operational training to designated station personnel prior to final acceptance.
5. Proposal Submission Instructions
5.1 Submission Methods & Protocols
- Electronic Submission (Preferred): Deliver via email in PDF format to Ulric.Waldron@uscg.mil. Telephone or verbal quotes will not be considered.
- Mailing / Hand Delivery: Must arrive at USCG Base Miami Beach (P&C), Attn: Ulric Waldron, 16001 SW 117th Avenue, Miami, FL 33177 prior to the closing deadline.
- Amendments: Formal solicitation amendments and Q&A notices will be publicized via SAM.gov.
5.2 Mandatory Email Subject Formatting All email communications must use the exact subject lines below:
- Proposal Submission:
[PROPOSAL SUBMISSION] [3930313PR270000003] - [USCG Station Lake Worth Inlet HVAC Diagnostic & Repair] ([Company Name])
- Question / Clarification Submission:
[QUESTION SUBMISSION] [3930313PR270000003] - [USCG Station Lake Worth Inlet HVAC Diagnostic & Repair] ([Company Name]) 5.3 Administrative & Technical Proposal Requirements Offerors must include the following documentation in their proposal package:
- Entity Identifiers: Unique Entity Identifier (UEI), Taxpayer Identification Number (TIN/EIN), and CAGE Code.
- Active SAM.gov Registration: Active registration with representations and certifications completed prior to award.
- State of Florida HVAC License: Proof of active State of Florida Certified HVAC Contractor licensing.
- Technical Capability Statement: Brief description of proposed methodology to complete the assessment, repairs, and deliverables within the 14-calendar-day performance window.
- Past Performance: Minimum of two (2) recent, relevant commercial or government marine/industrial HVAC projects.
- Price Proposal: Complete firm-fixed-price breakdown (Labor, Materials, Diagnostics/Reporting, and Total Proposed FFP).
6. Evaluation and Basis for Award
Award will be made to the responsible offeror whose quote represents the Lowest Price Technically Acceptable (LPTA) to the Government. Proposals will be evaluated under the following factors:
- Factor 1 – Technical Acceptability:
- Demonstrated capability to execute all requirements in Section 01 11 00.
- Verification of active State of Florida HVAC Contractor license.
- Confirmation of compliance with the 14-calendar-day completion schedule and NEC standards.
- Factor 2 – Past Performance:
- Record of satisfactory performance, quality of workmanship, and schedule adherence on similar facility HVAC systems.
- Factor 3 – Price:
- Evaluation of the total firm-fixed price for fairness, reasonableness, and completeness.
7. Applicable Clauses, Provisions, and Wage Determinations
7.1 Federal Acquisition Regulation (FAR) Clauses (Incorporated by Reference)
- FAR 52.212-1, Instructions to Offerors — Commercial Products and Commercial Services
- FAR 52.212-3, Offeror Representations and Certifications — Commercial Products and Commercial Services
- FAR 52.212-4, Contract Terms and Conditions — Commercial Products and Commercial Services
- FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders — Commercial Products and Commercial Services
- FAR 52.222-41, Service Contract Labor Standards
- FAR 52.222-90, In accordance with Executive Order (E.O.) 14398
- FAR 52.237-1, Site Visit
- FAR 52.237-2, Protection of Government Buildings, Equipment, and Vegetation
Full text of FAR clauses is accessible electronically at acquisition.gov/far. 7.2 Homeland Security Acquisition Regulations (HSAR) Clauses
- HSAR 3052.209-70, Prohibition on Contracts with Corporate Expatriates
- HSAR 3052.237-72, Contracting Officer's Technical Representative (COTR)
Full text of HSAR clauses is accessible electronically at dhs.gov. 7.3 Applicable Wage Determination
- U.S. Department of Labor Wage Determination: Service Contract Act (SCA) Wage Determination applicable to Palm Beach County, Florida (Riviera Beach), latest revision.
Context for bidders
There are 352 open Construction & Infrastructure tenders in United States. This one closes in 19 days.
Similar Construction & Infrastructure tenders
- A-E Services for Electron Injector Complex· closes 30 Nov
- GAOA Facilities, Barracks Inyo NF — Maintenance of Recreational Buildings· closes 6 Nov
- Triennial Circuit Breaker and Feeder Testing· closes 20 Nov
- NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009)· closes 2 Dec
- Install Generator- FCI Bastrop — Repair or Alteration of Penal Facilities· closes 2 Dec
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Construction & Infrastructure tenders
- proposed renovation of njabini marketNyandarua County Government · Kenya
- Строительно-монтажные работы по объекту: «Строительство сетей водоотведения социально-делового центра с парковой зоной «Алтын орда» г.Актобе» г.Актобе Актюбинский области»ГУ "Отдел строительства города Актобе" · Kazakhstan
- Услуги по осуществлению технического надзора по объекту: «Строительство сетей водоотведения социально-делового центра с парковой зоной «Алтын орда» г.Актобе» г.Актобе Актюбинский области»ГУ "Отдел строительства города Актобе" · Kazakhstan
- Replacement of damaged 2 Nos. PVC Water Storage Tanks in BSNL MW Staff Quarter Colony, TE Compound, Solan (HP)BSNL — Himachal Pradesh · India
- Electrical Works — Replacement of single phase Submersible pump motor set in place of faulty submersible pump at TE/Staff Quarter under Muzaffarpur BABSNL — Bihar · India
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →