FreeTender
Accepting bidstenderUnited States

United States Coast Guard Ketchikan Alaska New Carpet Installation

Issued by HOMELAND SECURITY, DEPARTMENT OF · U.S. COAST GUARD · BASE KETCHIKAN(00035) · via SAM.gov — US federal contract opportunities

Published
23 Sept 2026
Closes
30 Oct 2026, 19:00 UTC
Reference
UNITEDSTATESCOASTGUARDKETCHNEWCARPET
Location
AK, United States
Sector
Construction & Infrastructure

Details

HOMELAND SECURITY, DEPARTMENT OF · U.S. COAST GUARD · BASE KETCHIKAN(00035) is soliciting United States Coast Guard Ketchikan Alaska New Carpet Installation. Solicitation number UNITEDSTATESCOASTGUARDKETCHNEWCARPET. Classified under NAICS 238330 — Flooring Contractors. Product/service code 7220 — FLOOR COVERINGS. Place of performance: AK, USA. Responses are due by 30 October 2026 19:00 UTC. Posted on SAM.gov, the US federal contract opportunities system; registration is required to bid.

ANTICIPATED AWARD DATE/START OF CARPET INSTALLATION  SERVICES SHALL BE CONTINGENT ON AVAILABILTY OF A FUNDED AWARD. EXPECT AWARD & START DATE TO BE November  OF 2026. ******************                                                                      PERIOD OF PERFORMANCE IS NINETY (90) CALENDAR DAYS FROM DATE OF A SIGNED GOVERNMENT CONTRACT AWARD.

CLIN: 0001

Schedule of Supplies/Services

Qty 01

Unit: PROJECT

Unit Price Total Amount REMOVAL/DISPOSAL OF OLD CARPET AND INSTALLATION OF NEW CARPET INSTALLATION  AS SPECIFIED IN ATTACHED SOW, SPECS AND MAP- Base Ketchikan  ****ENTIRE THIRD FLOOR/DECK INCLUDING ALL HALLWAYS. SEE ATTACHED MAP. AGAIN=     ENTIRE THIRD FLOOR/DECK INCLUDING ALL HALLWAYS.

1 EACH: $

Total  $ Total Contract Value $ *The Contractor shall also include regular and overtime rates for any other labor categories proposed. Preparation of this quote is completely voluntary and shall be submitted to the United States Government by date specified herein . ****This shall be awarded to the LOWEST PRICED/ TECHNICALLY ACCEPTABLE/ QUALIFIED CONTRACTOR AND IS CONTINGENT ON THE UNITED STATES COAST GUARD SECURING PROPER FUNDING. 1.0       General 1.1       Background The United States Coast Guard (USCG) is procuring  NEW CARPET INSTALLATION Services & REMOVAL/DISPOSAL OF CURRENT CARPET as described within this PWS for USCG Base Ketchikan, AK.  Base Ketchikan serves as the single touch point for the support of Coast Guard operations within the 17th Coast Guard District, standing shoulder-to-shoulder with our operational partners to ensure the delivery of professional, responsive, and cost-effective services to the American public. 1.2      Scope The Contractor shall provide the proper mix of personnel, management, supervision, materials, supplies, equipment, tools, transportation, and other items or services (except utilities and limited facilities as defined in section 12.0) necessary to accomplish the CARPET REMOVAL AND INSTALLATION OF BRAND NEW CARPET services required by this PWS.  The efforts to be accomplished under this contract are scalable in nature to include other tasks, services, or locations within scope, as required. The contractor is encouraged to assess the work requirements and recommend revisions that would provide beneficial savings to the contractor and the government. 1.2.1    REMOVE EXISTING CARPET AND INSTALL BRAND NEW CARPETcleaning  Base Ketchikan for: Administrative building 3RD FLOOR ONLY.

a. GENERAL REQUIREMENTS:

b. Services to Be Preformed: Carpet REMOVAL AND INSTALLATION OF NEW CARPET is required at each location specified below as determined by the Contracting Officer’s Representative (COR). The Contractor shall provide all necessary labor, equipment, and supplies required to perform these services. All cleaning procedures and treatment shall be accomplished in accordance with the manufacturer’s directions and/or listed specifications and industry standards applicable to the Professional Cleaning & Restoration Industry.

1.2.2     Location of Work Performance:

Administrative building 3rd Floor – SEE ATTACHED MAP FOR:  sqft 2.3       Work Hours: All carpet REMOVAL AND NEW  installation services shall be performed between the hours of 0700 and 1630 AKST.  Monday through Friday or by appointment scheduled in advance. The Contractor shall notify the designated Contracting Officer Representative of any deviations to the previously agreed upon appointment and schedule an alternate appointment carpet cleaning. No keys to Government facilities are to be provided to Contractors under any circumstances.

3.         PERFORMANCE REQUIREMENTS

OLD CARPET SHALL BE REMOVED AND BRAND NEW CARPET SHALL BE INSTALLED  IN according to industry standard to protect the investment as part of a maintenance program that will preserve the appearance and extend the life of the carpet. The contractor will develop a cost-effective cleaning strategy, plan, and schedule. MAPS OF AREAS WITH CARPET TO BE REMOVED AND NEW CARPET INSTALLED- SEE ATTACHMENT ***LAST DAY TO SUBMIT ANY QUESTIONS FOR THIS REQUIRMENT IS:  FRIDAY, 25 SEPTEMBER 2026. ALL QUESTIONS AND GOVERNMENT ANSWERS SHALL BE POSTED HERE AS WELL BEFORE THE OFFICIAL CLOSING DATE.

Context for bidders

There are 389 open Construction & Infrastructure tenders in United States. This one closes in 37 days.

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Construction & Infrastructure tenders

All Construction & Infrastructure tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →