ToR - Consultant For Hydrogeological Characterisation, Micro-Watershed Delineation And Detailed Project Report (DPR) Preparation

Issued by Tomorrow's Foundation · via SAMS-STC — social-sector RFPs & tenders

Published
26 Nov 2026
Closes
10 Dec 2026, 23:59 UTC
Reference
1389
Location
Location Jhargram, West Bengal · Issued Nov 26, 2026, India
Sector
Financial & Professional Services
Type
services

At a glance

Tomorrow's Foundation in India has published a request for proposals in financial & professional services: “ToR - Consultant For Hydrogeological Characterisation, Micro-Watershed Delineation And Detailed Project Report (DPR) Preparation”. Submissions close on 10 December 2026, 14 days from today. Quote reference 1389 in any correspondence with the buyer. FreeTender has recorded 4 notices from this buyer since 2026, 4 of them currently open. There are 2,176 open financial & professional services notices in India on FreeTender. Bids are submitted to the buyer through SAMS-STC — social-sector RFPs & tenders, not through FreeTender.

Details

The consultant shall be responsible for the hydrogeological study and DPR for the full project area of around 50 villages in 5 Gram Panchayats. List of Gram Panchayats- (Block – Binpur II, Jhargram)

  • Bhelaidiha
  • Shimulpal
  • Bhulaveda (Bhula Bheda)
  • Belpahari
  • Sandapara

The scope of work shall include, but not be limited to, the following. A0. Inception

  • Review the project proposal, work plan, logical framework and the planned unit targets for water security works.
  • Hold a kick-off meeting with TF and agree the micro-watershed boundaries, priority villages and data-sharing arrangements with the baseline survey agency.
  • Prepare an Inception Report covering methodology, field plan, sampling of wells and test sites, team deployment, timelines and quality assurance.

Component A: Hydrogeological Characterisation and Micro-Watershed Delineation

A1. Desk review and secondary data

  • Collect and review existing data: Central Ground Water Board (CGWB) and State Water Investigation Directorate (SWID), West Bengal reports and aquifer maps, NAQUIM outputs where available, Geological Survey of India maps, block-level groundwater assessment category, rainfall records, any earlier watershed DPRs for the area, and the water-source inventory and water quality data from the project's baseline survey.
  • Obtain base layers: Survey of India toposheets (1:50,000), a digital elevation model (CartoDEM / SRTM, 30 m or finer), recent satellite imagery, land use/land cover, soil and geomorphology layers (e.g., Bhuvan / NRSC).

A2. Micro-watershed delineation and drainage mapping

  • Delineate watershed and micro-watershed boundaries from the DEM, validated against toposheets and field observation; reconcile with official micro-watershed codes where they exist.
  • Map the full drainage network and classify every drainage line by Strahler stream order, with slope, length and catchment area for each segment.
  • Divide each micro-watershed into ridge, mid-slope and valley zones to support ridge-to-valley treatment planning.
  • Produce thematic maps for each micro-watershed: drainage, slope, contour (at an interval suitable for structure design), geology, geomorphology, lineaments, soils and land use.

A3. Hydrogeological field investigation

  • Traverse the main drainage lines on foot and record lithology, rock outcrops, weathered-zone thickness, fractures, lineaments, dykes and stream-bed material at regular intervals.
  • Inventory existing open wells, bore wells and hand pumps (target: at least 200 wells across the 40 villages), recording location (GPS), depth, depth to water, construction, yield, use and seasonality.
  • Measure pre- and post-monsoon water levels in a network of key observation wells, and establish this network for long-term monitoring by the Foundation.
  • Conduct infiltration tests at representative sites across major soil and geology units (minimum 20 tests).
  • Carry out geophysical surveys (vertical electrical sounding or electrical resistivity tomography) at priority sites, particularly proposed injection-well and check-dam locations (minimum 40 soundings).
  • Collect and test groundwater samples at a NABL-accredited laboratory for basic potability and recharge-relevant parameters (pH, EC/TDS, hardness, chloride, nitrate, fluoride, iron, arsenic where relevant) from at least 40 sources, avoiding duplication with the baseline survey's testing.
  • Record existing water harvesting and recharge structures, their condition and performance.

A4. Aquifer characterisation and recharge profile

  • Define the aquifer type(s) (e.g., unconfined weathered zone, fractured hard rock, alluvial, confined), with geometry, thickness and water-bearing properties, illustrated with hydrogeological cross-sections.
  • Estimate the groundwater balance for each micro-watershed (rainfall, runoff, recharge, draft and stage of extraction) using an approach consistent with the GEC-2015 methodology.
  • Identify and map recharge zones, discharge zones and areas of over-extraction or water-quality concern.
  • Prepare a recharge-potential zonation map combining field data with weighted GIS layers.

A5. Site identification and prioritisation

  • Identify candidate sites for each structure type along drainage lines, matched to stream order, slope, geology and aquifer response, for example:

– Ridge and upper reaches (1st–2nd order): trenches, gully plugs, loose boulder structures.

– Mid reaches (2nd–3rd order): recharge trenches, percolation ponds, farm ponds.

– Lower reaches (3rd–4th order): check dams, nala bunds, recharge shafts or injection wells where a permeable zone is confirmed.

  • Rank sites by expected recharge benefit, downstream beneficiaries, land availability and community preference.
  • Validate shortlisted sites with Gram Panchayats and user groups, and record land ownership and consent status.

Component B: Detailed Project Report (DPR) Preparation

B1. Intervention plan

  • Prepare a micro-watershed-wise treatment plan covering area treatment and drainage-line treatment from ridge to valley.
  • For each structure: unique ID, GPS location, survey number or land details, drainage order, type, purpose and justification from the hydrogeological findings.

B2. Engineering design

  • Carry out a topographic survey at every shortlisted structure site (levels, cross- and longitudinal sections).
  • Calculate catchment yield, design peak flood and storage capacity for each structure.
  • Prepare designs and drawings: plan, sections, dimensions, materials, foundation depth and spillway or overflow provision.
  • For injection or recharge wells: depth, casing, screen position, filter design and silt-trap arrangement, based on the geophysical and lithological data.
  • Follow applicable standards: CGWB Master Plan for Artificial Recharge to Groundwater, relevant Indian Standard codes, and the Common Guidelines for Watershed Development Projects / WDC-PMKSY 2.0 norms, or the State's own technical guidelines where these apply.

B3. Quantities and costs

  • Prepare bills of quantities and cost estimates for each structure using the current West Bengal Schedule of Rates (PWD / Irrigation & Waterways, as applicable) and MGNREGA rates, where applicable.
  • Summarise the budget by micro-watershed, structure type and implementation phase.
  • Identify components suitable for convergence with government schemes (e.g., MGNREGA, WDC-PMKSY, Jal Shakti Abhiyan, Atal Bhujal Yojana where applicable).

B4. Expected impact and monitoring

  • Estimate the additional storage and recharge volume, the area benefiting from irrigation and the households benefiting, for each structure and in total.
  • Propose a monitoring framework: observation wells, measurement frequency, indicators and a simple data format the Foundation's field staff can maintain.
  • Include an operation and maintenance plan, with roles for user groups and Gram Panchayats.

B5. Implementation and quality guidance

  • Set out a phased implementation schedule that sequences works ridge to valley and fits the working season.
  • Provide a quality supervision checklist for each structure type: critical dimensions, materials and stage-wise checks.
  • Note risks such as land, siltation and water quality, with mitigation measures.

B6. Stakeholder consultation and presentation

  • Present draft findings to the Foundation, Gram Panchayats and relevant government departments (e.g., Jhargram Zilla Parishad, Binpur-II Block Development Office, Water Resources Investigation & Development Department, Panchayat & Rural Development Department, Public Health Engineering Department).
  • Incorporate feedback and support the Foundation in sharing the final DPR for planning integration.

Deliverables

All reports in English, in editable (Word/Excel) and PDF formats; all maps and spatial data as GIS files (shapefile/GeoPackage, WGS 84) with metadata. Payment is linked to TF's acceptance of each deliverable. # Deliverable Key contents Payment 1 Inception Report Methodology, field plan, well and test-site sampling, team, work plan, QA 10% 2 Hydrogeological Characterisation and Micro-Watershed Report Micro-watershed boundaries and drainage maps by stream order; thematic maps; well inventory; post-monsoon water levels; infiltration, geophysical and water quality results; aquifer typology and cross-sections; water balance; recharge-potential zonation 25% 3 Site Prioritisation Package Ranked, GPS-tagged site list per structure type with justification; Gram Panchayat validation and land consent status; Year-1 priority sites flagged (with 4) 4 Draft DPR Structure-wise designs, drawings, BoQs and SoR-based estimates; budget by micro-watershed and phase; convergence mapping; impact estimates; monitoring, O&M and quality supervision plans 30% 5 Validation Presentation Presentation of findings and draft DPR to TF, Gram Panchayats and district/block officials – 6 Final DPR Final DPR incorporating feedback, with annexures, drawings, GIS database, raw field data, photographs and a summary presentation 25% 7 Pre-monsoon Addendum Pre-monsoon water levels from the observation network, seasonal fluctuation analysis and any resulting site revisions 10%

Job Email ID: purchase(at)tomorrowsfoundation.in

Download Attachment: TOR Hydrogeology MicroWatershed DPR Jhargram TF.docx

Organisation: Tomorrow's Foundation

Listed on the SAMS-STC social-sector RFP board.

Context for bidders

We hold 4 notices from Tomorrow's Foundation, going back to November 2026 — 4 of them still open. They buy mostly in Financial & Professional Services and Research, Studies & Evaluation. There are 2,176 open Financial & Professional Services tenders in India. This one closes in 14 days.

Explore India

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this financial & professional services opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

Who won similar contracts

Recent contract awards in India, from published award notices.

More contract awards →

More Financial & Professional Services tenders

All Financial & Professional Services tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →