Technologies for innovative processing of raw materials (IA)
Issued by European Commission · via EU Funding & Tenders Portal
- Published
- 9 Oct 2026
- Closes
- 2 Feb 2027
- Reference
- HORIZON-CL4-2027-01-MAT-PROD-16
- Location
- European Union
- Sector
- Water & Environment
At a glance
European Commission in European Union has published a funding call in water & environment: “Technologies for innovative processing of raw materials (IA)”. Submissions close on 2 February 2027, 116 days from today. Quote reference HORIZON-CL4-2027-01-MAT-PROD-16 in any correspondence with the buyer. FreeTender has recorded 361 notices from this buyer since 2026, 358 of them currently open. There are 44 open water & environment notices in European Union on FreeTender. Bids are submitted to the buyer through EU Funding & Tenders Portal, not through FreeTender.
Details
Expected Outcome:
- Increased recovery rates of valuable raw materials, particularly critical raw materials from low grade or complex ores and/or from mining waste;
- Increased economic performance in terms of higher material-, water-, energy- and cost-efficiency and flexibility in minerals processing and metallurgical processes; and
- Improved health, safety and environmental performance of the operations throughout the whole life cycle that is considered, including a reduction in waste, wastewater and generation of emissions of air pollutants and a better recovery of resources from generated waste, reducing the environmental footprint and contributing to biodiversity and ecosystems preservation.
Scope:
Actions should develop and validate / demonstrate pilot scale facility located in the EU integrating relevant processing and refining technologies for improved recovery of raw materials from low grade and/or complex ores from extractive wastes, reduction of waste and water and air pollution, higher energy efficiency and reduction of land and sea-use change, habitat loss, degradation and fragmentation. The action can also focus on reducing the content of toxic elements or compounds in the resulting material products. The actions should target minerals and metals, particularly critical raw materials. The solution proposed should be flexible enough to adapt to different or variable ore grades and extractive waste streams and should be supported by efficient and robust process control. Where relevant, any solution proposed for the reduction of the content of toxic elements or compounds in the resulting materials should also include the appropriate management of the hazardous substances removed. Actions should develop intelligent and innovative production systems which better utilise natural resources by minimising losses during waste-rock separation in an optimised and energy-efficient process and by minimising use of water. Recycling of end-of-life products is excluded from this topic. Actions should envisage clustering activities with other relevant selected projects for cross-projects co-operation, consultations and joint activities on cross-cutting issues and share of results as well as participating in joint meetings and communication events. To this end proposals should foresee a dedicated work package and/or task, and earmark the appropriate resources accordingly. Actions should facilitate the market uptake of solutions developed through industrially- and user-driven multidisciplinary consortia covering the relevant value chain and should consider standardisation aspects when relevant. The action should also include the analysis of financial opportunities ensuring the market exploitation and replication of the circular business model behind the developed solutions as new processes, products and/or services. The industry based in the EU, and users of recovered secondary raw materials should assume prominent role in the proposed actions, supported by adequate allocation of resources. Proposals submitted under this topic should include a business case and exploitation strategy, as outlined in the introduction to this Destination. For TRLs 6-7, a credible strategy to achieve full-scale deployment in the EU is expected, indicating the commitments of the leading partners after the end of the project. International cooperation is encouraged with countries with which the EU has signed Strategic Partnerships on raw materials, especially with Ukraine. [1] Technology Readiness Level - Technology readiness level expected from completed projects Activities are expected to start at TRL 5 and achieve TRL 7 by the end of the project – see General Annex B.
[1] https: //single-market-economy.ec.europa.eu/sectors/raw-materials/areas-specific-interest/raw-materials-diplomacy_en
Submissions open on 13 October 2026.
Part of call HORIZON-CL4-2027-01
Type of action: HORIZON Innovation Actions
Programme period: 2021 - 2027
Priorities: DigitalAgenda, INCO, AI
"> General conditions
1. Admissibility Conditions: Proposal page limit and layout
In order to include a business case and exploitation strategy, as outlined in the introduction to this Destination, the page limit is exceptionally extended by 3 pages.
Admissibility conditions are described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes.
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System.
2. Eligible Countries
described in Annex B of the Work Programme General Annexes. A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide .
3. Other Eligible Conditions
To increase EU resilience in raw materials supply chains and thus reduce the serious risk to the Union's strategic assets, economic and societal interests, autonomy and security associated with the current EU reliance on a few third countries for critical raw materials, by increasing sustainable and responsible sourcing of primary and secondary raw materials necessary to enable the green and digital transition and in alignment with the objectives of the Critical Raw Materials Act[[Regulation (EU) 2024/1252 of the European Parliament and of the Council of 11 April 2024 establishing a framework for ensuring a secure and sustainab
Context for bidders
We hold 361 notices from European Commission, going back to August 2026 — 358 of them still open. They buy mostly in Water & Environment, Forestry & Wildlife and IT & Telecom. There are 44 open Water & Environment tenders in European Union. This one closes in 116 days.
More from this buyer
- Sustainable and Competitive Cell Production Techniques for Lithium-ion And Sodium-ion Batteries (BATT4EU Partnership)· closes 31 Mar
- Open topic: Innovative solutions for the European Water Resilience Strategy· closes 8 Apr
- Open grounds for future pre-commercial procurement of innovative security technologies· closes 4 Nov
- Development of innovative antimicrobials against pathogens resistant to antimicrobials· closes 17 Feb
- ‘Proof of market’ to improve valorisation and commercialisation of Horizon generated R&I results (IA)· closes 2 Feb
Similar Water & Environment tenders
- Developing novel recycling technologies for complex plastic materials applying biotech solutions· closes 22 Sept
- EIC Pre-accelerator - Widening· closes 18 Nov
- Open topic: Innovative solutions for the European Water Resilience Strategy· closes 8 Apr
- Europe-wide environmental benchmarking system of the industrial bioeconomy sectors· closes 22 Sept
- Open topic: Using the Circular Cities and Regions Initiative to strengthen urban manufacturing in support of the Clean Industrial Deal· closes 8 Apr
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this water & environment opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Water & Environment tenders
- Услуги по вывозу твердо-бытовых отходов на 2027 годРГУ "Департамент Комитета национальной безопасности Республики Казахстан по Кызылординской области и городу Байконыр" · Kazakhstan
- Услуга по утилизации списанного медицинского оборудованияГосударственное коммунальное предприятие на праве хозяйственного ведения "Городская поликлиника №6" управления здравоохранения акимата Западно-Казахстанской области" · Kazakhstan
- Утилизация ртутных лампНАО "Торайгыров университет" · Kazakhstan
- Услуги по демеркуризации ртутьсодержащих ламп (согласно технической спецификации)КГУ "Костанайский дом ребенка "Дельфин" Управления здравоохранения акимата Костанайской области · Kazakhstan
- Repairing of 3 HP monoblock pump sets & 1 Nos 7.5 HP Submersible pump set in TE Bldg BundiBSNL — RAJASTHAN · India
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →