Supply and Delivery of OHS Office Support and OHS Risk Register
Issued by Border Management Authority · via eTenders — South Africa (National Treasury)
- Published
- 29 Sept 2026
- Closes
- 2 Oct 2026, 09:00 UTC
- Reference
- H004L2709RFQ00170
- Location
- Centurion, Gauteng, South Africa
- Sector
- Defence & Security
Details
Supply and Delivery of OHS Office Support and OHS Risk Register
Buyer: Border Management Authority.
Category: Supplies: General.
Procurement method: Request for Quotation.
Province: Gauteng.
Delivery location: 67 Koranna Avenue-Doringkloof-Centurion, Pretoria-0157.
Electronic submission accepted.
Published: 29 September 2026.
Closing date: 02 October 2026 11:00 (South African time).
Tender documents:
- FINAL BMA QUOTE PACK AUG 2026 -RFQ00170.pdf
Source: National Treasury eTenders portal (www.etenders.gov.za); the same notice is published as Open Contracting (OCDS) data.
Context for bidders
We hold 4 notices from Border Management Authority, going back to September 2026 — 1 of them still open. They buy mostly in Defence & Security, IT & Telecom and Water & Environment. There are 34 open Defence & Security tenders in South Africa. This one closes in 3 days.
Similar Defence & Security tenders
- Request for Quotation (RFQ): Appointment of a Service Provider for the Provision of Physical Security Guarding Service at the Port Elizaberth for 5 Months.· closes 12 Oct
- Appointment of a Professional Service Provider for the Supply, Support and Maintenance of Electronic Traffic-Surveillance Equipment and a Contravention Management System for a Period of 36 Months, on a Rent-To-Own Basic, Including Debt and Fine Collection Services· closes 29 Sept
- The Supply and Installation of L13 Terraforce Retaining Wall and Security Fence with Security Lights for Southern Procurement Service Centre at Wynberg Military Base, Cape Town Proc Plan : 26-27/Log DIV/2443· closes 26 Oct
- The Supply and Delivery of One (1) Licensed Trooper Carrier (Armoured Personnel Carrier Vehicle) for NMB Metro Department· closes 29 Oct
- Outsourcing a Service Provider for Supply and Delivery of 02 X Horse Trailers at South African Specialised Infantry Capability, Potchefstroom, North West DOD Proc Plan 26-27/SA Army/202· closes 20 Oct
Documents
- FINAL BMA QUOTE PACK AUG 2026 -RFQ00170.pdfDownload (pdf)
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this defence & security opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Defence & Security tenders
- Serviços de Vigilância e SegurançaUnidade Local de Saúde do Alto Ave, E.P.E · Portugal
- Aquisição de Diverso Equipamento de Visão Noturna, de Visão Térmica e outros equipamentos para a GNR, no âmbito do DLPIEFSSSecretaria-Geral do Ministério da Administração Interna · Portugal
- 中国井冈山干部学院2027—2029年度安保委托管理项目公开招标公告中国井冈山干部学院 · China
- Fourniture et livraison des produits alimentaires repartis en trois lots.Lot1:Fourniture et livraison des produits alimentaires destinée à la BIA;Lot2:Fourniture et livraison des produits alimentaires destinée à la BIMA;Lot3:Fourniture et livraison des produits alimentaires destinée à la BANAMINISTERE DE LA DEFENSE NATIONALE · Madagascar
- Entretien et réparation de véhicule administratif NISSAN PATROL N°4690 TAC du SHSPEMINISTERE DE LA SANTE PUBLIQUE · Madagascar
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →