Supervision of construction and installation of equipment for the Administration Building (TN1); Laboratory center (TN2.1; TN2.2 & TN 2.3) and internal landscape, Center for Experiment and Research
Issued by University of Danang – ODA Project Management Unit · via World Bank — Procurement Notices
- Published
- 16 Sept 2026
- Closes
- 21 Sept 2026
- Reference
- DN-CS--03
- Location
- Viet Nam
- Sector
- Construction & Infrastructure
- Type
- consultancy
Details
To: The World Bank (WB) Task Team,
The ODA Project Management Unit (PMU) - The University of Da Nang respectfully presents this report and requests the World Bank’s review and comments on its proposal regarding the processing plan for Package DN-CS--03: Supervision of packages for Supply and installation of specialized equipment and furniture. This package is selected using the Consultants’ Qualifications Selection (CQS) method in accordance with the Project’s Procurement Plan. The Request for Expressions of Interest (REOI) for Package DN-CS--03 was published on the National Procurement Network System on August 25, 2026, under REOI No. IB2600484579, with the initial submission deadline set for 2:00 PM on September 11, 2026. At the closing time, only one (01) consultant submitted an Expression of Interest (EOI). To provide further opportunities for other firms to participate, thereby enhancing competition, fairness, transparency, and economic efficiency in the procurement process, the ODA PMU issued Document No. 276/QLDAODA-T dated September 11, 2026, extending the submission deadline to 2:00 PM on September 21, 2026 (a 10-day extension). This extension has been updated on the National Procurement Network System. Package DN-CS--03 is a supervisory consulting service with a broad scope of work that spans multiple specialized fields simultaneously. Consequently, the qualification requirements are comprehensive and specialized, covering various sectors. As a result, the number of interested consultants with relevant experience matching the package's required scope may be limited. This is an objective characteristic of the consulting market for multi-disciplinary supervision assignments. The selection of the supervisory consultant for Packages DN-GO--01, DN-GO--02 and DN-GO--03 is crucial to meeting the schedule for equipment supply, installation, acceptance, disbursement, and the overall progress of the Project. Therefore, we respectfully request the World Bank to review and provide its no-objection to the following proposal: In the event that only one (01) consultant has submitted an EOI by 2:00 PM on September 21, 2026, the ODA Project Management Unit will close the receipt of EOIs, prepare the closing minutes, and proceed to open the submitted EOI at 2:30 PM on the same day. We look forward to receiving the World Bank’s comments to serve as a basis for implementing the next steps, ensuring the progress of the consulting selection and the overall timeline of the Project. We highly appreciate the World Bank’s continued cooperation and support. Sincerely,
Nguyen Duc Phong Director of ODA PMU
To: The World Bank (WB) Task Team,
The ODA Project Management Unit (PMU) - The University of Da Nang respectfully presents this report and requests the World Bank’s review and comments on its proposal regarding the processing plan for Package DN-CS--03: Supervision of packages for Supply and installation of specialized equipment and furniture. This package is selected using the Consultants’ Qualifications Selection (CQS) method in accordance with the Project’s Procurement Plan. The Request for Expressions of Interest (REOI) for Package DN-CS--03 was published on the National Procurement Network System on August 25, 2026, under REOI No. IB2600484579, with the initial submission deadline set for 2:00 PM on September 11, 2026. At the closing time, only one (01) consultant submitted an Expression of Interest (EOI). To provide further opportunities for other firms to participate, thereby enhancing competition, fairness, transparency, and economic efficiency in the procurement process, the ODA PMU issued Document No. 276/QLDAODA-T dated September 11, 2026, extending the submission deadline to 2:00 PM on September 21, 2026 (a 10-day extension). This extension has been updated on the National Procurement Network System. Package DN-CS--03 is a supervisory consulting service with a broad scope of work that spans multiple specialized fields simultaneously. Consequently, the qualification requirements are comprehensive and specialized, covering various sectors. As a result, the number of interested consultants with relevant experience matching the package's required scope may be limited. This is an objective characteristic of the consulting market for multi-disciplinary supervision assignments. The selection of the supervisory consultant for Packages DN-GO--01, DN-GO--02 and DN-GO--03 is crucial to meeting the schedule for equipment supply, installation, acceptance, disbursement, and the overall progress of the Project. Therefore, we respectfully request the World Bank to review and provide its no-objection to the following proposal: In the event that only one (01) consultant has submitted an EOI by 2:00 PM on September 21, 2026, the ODA Project Management Unit will close the receipt of EOIs, prepare the closing minutes, and proceed to open the submitted EOI at 2:30 PM on the same day. We look forward to receiving the World Bank’s comments to serve as a basis for implementing the next steps, ensuring the progress of the consulting selection and the overall timeline of the Project. We highly appreciate the World Bank’s continued cooperation and support. Sincerely,
Nguyen Duc Phong Director of ODA PMU
Context for bidders
There are 18,267 open Construction & Infrastructure tenders. This one closes in 3 days.
Similar Construction & Infrastructure tenders
- SPL Repairs to Old Pipeline for Main Water Supply at Joginder Singh Enclave and Fafa Accn at Old Amritsar Cantt· closes 6 Oct
- Construction of Paver Block Road from Amalia PMSGY to Dumuria Vatiapara via Amalia ICDS under Sahapur-II G.P in Goalpokher-II Block in the District of Uttar Dinajpur.· closes 23 Sept
- Link Road in Distt Gorakhpur in FY 2026-27 Including 05 Year Maintenance Lot No 6 of 20· closes 19 Sept
- Renovation and Construction of RAJENDRA KANYA MS Katras, Block BAGHMARA, District Dhanbad· closes 29 Sept
- Construction of Paver Block Road and Urgent Repairing and Renovation of School Building at Darivit High School under Islampur Block in the District of Uttar Dinajpur.· closes 29 Sept
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Construction & Infrastructure tenders
- proposed renovation of njabini marketNyandarua County Government · Kenya
- Civil Works — Internal repairing, painting & misc. civil work in qtr. no. 01/T-II (M/W) at TE campus companybag, Muzaffarpur.BSNL — Bihar · India
- Installation of Solar Street Lights at 03 Paras of Ganjenar Village, Dantewada, Chhattisgarh.NMDC Limited · India
- Contract for renovation and refurbishment of the Existing Old FQANTPC Limited · Eastern Region - II Headquarter · Darlipalli Super Thermal Power Project · India
- Construction of Two Garzier HutsIHQ of MoD (Army)-(OSCC) · Eastern Comd-IHQ of MoD (Army)-(OSCC) · CORPS 1-Eastern Comd-IHQ of MoD (Army)-(OSCC) · DIV A-CORPS1-Eastern Comd-IHQ of MoD · India
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →