Sélection directe du Consultant individuel Monsieur Emmanuel NSHIMIRIMANA pour l'élaboration du Cadre de Gestion Environnementale et Sociale (CGES) du Projet d'Accès à l'Eau Potable et à l'Assainissement (PAEPA)
Issued by World Bank project · via World Bank — Procurement Notices
- Published
- 2 Sept 2026
- Reference
- BI-MINEAGRIE-BCCR PIU-490698-CS-CDS
- Location
- Burundi
- Sector
- Water & Environment
- Type
- consultancy
Details
Contract Award
Project: P507207-Burundi Water Supply and Sanitation Access Project
Loan/Credit/TF Info: IDA-V5310
Bid/Contract Reference No: BI-MINEAGRIE-BCCR PIU-490698-CS-CDS
Procurement Method: CDS-Slection de consultants par entente directe
Scope of Contract: Elaboration du Cadre de Gestion Environnementale et Sociale (CGES) du Projet d'Accs l'Eau Potable et l'Assainissement (PAEPA)
Notice Version No: 0
Date Notification of Award Issued (YYYY/MM/DD) 2025/07/15
Duration of Contract
30 Day(s)
Awarded Firm(s):
EMMANUEL NSHIMIRIMANA (349112)
Country: Burundi
Final Evaluation Price BIF 78565042
Signed Contract Price BIF 83247500
Price:
Currency:
Amount:
Franc burundais (Franc burundais) 83247500
This notice has closed — what to do next
We hold 3,686 notices from World Bank project, going back to August 2026 — 3,686 of them still open. They buy mostly in Construction & Infrastructure, IT & Telecom and Financial & Professional Services. There are 7 open Water & Environment tenders in Burundi.
Open now from this buyer
- Direct RFP without REOI for, "Hiring of Consultancy firm for Multipurpose Disaster Shelter Needs Assessment, Development plan, Shelter Designs, and Operational Assistance in Uttarakhand State under U-PREPARE Project".
- Hiring an Implementation Facilitation and Closure Support of the Binding Final Advisory Determination - MoFP
- Procurement of ICT Equipment for the Strengthening of Landslide Resilience by NBRO
- Procurement of ICT Equipment for the Strengthening of Landslide Resilience by NBRO
- Procurement of ICT Equipment for the Strengthening of Landslide Resilience by NBRO
Open Water & Environment tenders in Burundi
- Acquisition de six (6) véhicules tous terrains pour les deux UGP du PAEPA, la DGR-PEPA et l'AHAMR
- Fourniture et installation du mobilier de bureau en faveur du Projet d'Accès à l'Eau Potable et à l'Assainissement au Burundi (PAEPA) -UGP MRMEICT
- Travaux de captage de l'eau dans le Lac Tanganyika et construction d'une usine de traitement d'eau: conception, approvisionnement, installation et mise en service· closes 29 Oct
- AMI - Burundi - Elaboration du plan de gestion des déchets dangereux au CEFORE-RUSI - PEAPJF
- Optimisation du système de désinfection à la station de pompage SP2, existante de la REGIDESO : Fourniture et installation d'électro-chloration· closes 7 Oct
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this water & environment opportunity. Always verify the details on the official source.
- Confirm the closing date and submission window on the official portal before you start preparing your bid.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Water & Environment tenders
- Civil Works — Repair of broken toilet pipeline and rectification of floor Slope for proper drainage of water at 3rd Floor, Main T.E., Budh Marg, Patna.BSNL — Bihar · India
- Avtale om avfallshåndtering i ÅlesundSTATSBYGG · Norway
- E-quotation for seeking firm rates for non-schedule items for preparing estimates ( For Mini Drinking water Supply Scheme for the Hundru Water Fall Tourist Campus ).DWSD EinC · DWSD CE RANCHI · DWSD SE MECH Ranchi · DWSD EE RANCHI Mech · India
- Consulting Services for the Preparation of an Environmental Impact Assessment (EIA), an Environmental and Social Impact Assessment (ESIA), and Other Environmental and Social Documents Required for the ProjectKathmandu Valley Water Supply Management Board · Nepal
- Contrôle et de supervision des travaux de drainage et protection côtièreMinistère de l'Amenagement du Territoire et de l'Urbanisme · Comoros
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →