CONCEPT NOTE
Spring and Well-Based Piped Drinking Water Supply Scheme
Village: Pipariya (Sendurkh?r)
Gram Panchayat: Pipariya
Development Block: Bajag
District: Dindori, Madhya Pradesh
Water Sources: 1 Spring and 1 Well
Beneficiaries: 81 Baiga Families
1. Introduction
A Spring and Well-Based Piped Drinking Water Supply Scheme is proposed to provide safe, reliable, and year-round drinking water to the Baiga community residing in the Sendurkh?r area of Pipariya Village, Bajag Development Block, District Dindori, Madhya Pradesh.
At present, most families in the village depend on natural water sources and wells for their drinking water needs. During the summer season, the availability of water decreases significantly, resulting in water scarcity and increased hardship for the community.
The proposed intervention will focus on the protection and development of the natural spring (Jhiria) and well located near the settlement. The water sources will be strengthened and made more sustainable, and water will be conveyed through a piped distribution system to 81 Baiga families.
The project will include source protection, pumping, water storage, pipeline distribution, and community-level water management.
2. Need for the Project
Lack of regular and safe drinking water for Baiga families.
Reduced water availability during the summer season.
Need for protection and development of the natural spring and well.
Dependence on distant water sources for drinking water.
Risk of water-borne diseases due to unsafe water sources.
Need for a sustainable community-level drinking water supply system.
3. Key Objectives of the Project
To protect and develop the natural spring and well.
To provide piped drinking water to 81 Baiga families.
To establish a community-based water distribution system with 16 stand posts.
To establish a safe water storage and pumping system.
To develop a long-term and sustainable water management system at the community level.
4. Proposed Activities
A. Water Source Development and Protection
Protection of the natural spring and construction of a spring box.
Cleaning and deepening of the well.
Construction of safety and protection measures around the well.
Construction of a protection wall and implementation of water conservation measures around the source area.
B. Pumping and Electrical System
Installation of 02 submersible pumps of 1.5 HP capacity each.
Installation of 02 starter panels.
Provision of approximately 200–300 metres of Texmo 4 mm cable.
C. Water Storage System
Installation of a 10 KL capacity RCC storage tank.
Construction of a safe platform and required pipe connections.
D. Pipeline and Distribution System
Laying of HDPE pipeline.
Construction/installation of 16 stand posts.
Development of a safe drinking water distribution system for the community.
Installation of necessary valves, fittings, and connections.
5. Major Project Components
S. No.
Component / Activity
Proposed Quantity
1
Beneficiary Families
81 Baiga Families
2
Stand Posts
16 Nos.
3
RCC Storage Tank
10 KL
4
Spring Box
01 No.
5
Well Cleaning and Protection
01 Work
6
Submersible Pumps
1.5 HP – 02 Nos.
7
Leach Pits for Greywater Management
08 Nos.
8
Starter Panels
02 Nos.
9
Texmo Cable – 4 mm
200–300 metres
10
HDPE Pipeline
As per requirement
11
Fittings and Connection Materials
12
Storage Tank Foundation
01 Location
6. Potential Benefits
Social Benefits
Safe drinking water will be available closer to the households of the Baiga community.
Time and physical effort spent by women and children in collecting water will be reduced.
Improvement in health, hygiene, and overall well-being of the community.
Environmental Benefits
Protection and conservation of natural water sources.
Improved sustainability and water retention capacity of the sources.
Promotion of community-led water conservation practices.
Economic Benefits
Reduction in the time and expenditure associated with collecting water from distant sources.
Improved availability of water at the local level, contributing to better living conditions and quality of life.
7. Community Participation
Formation and/or strengthening of the Village Water and Sanitation Committee (VWSC).
Active participation of the community in operation and maintenance of the water supply system.
Awareness activities on water conservation, safe drinking water, sanitation, and hygiene.
Development of community-level rules for responsible water use and source protection.
8. Sustainability
The sustainability of the intervention will be ensured through:
Operation and maintenance by the local community/VWSC.
Regular cleaning and maintenance of water sources and pumps.
Periodic water quality testing.
Community-based water use and source protection mechanisms.
Promotion of local ownership and responsibility for the water supply system.
9. Expected Outcomes
Regular and safe drinking water access for 81 Baiga families.
Protection and rejuvenation of the natural spring and well.
Establishment of a safe and reliable piped drinking water distribution system.
Reduction in dependence on distant water sources.
Improved health, hygiene, and water security at the community level.
Strengthened community participation in water source management and operation and maintenance.
Improved long-term water security and resilience of the village.
10. Conclusion
The proposed Spring and Well-Based Piped Drinking Water Supply Scheme in Pipariya (Sendurkh?r) will be an important intervention to provide safe, reliable, and sustainable drinking water to the Baiga community.
The project will combine natural water source protection, water storage, pumping, piped distribution, greywater management, and community participation. It will not only improve access to safe drinking water but also strengthen local ownership and sustainable management of water resources.
The intervention has the potential to serve as a good example of community-based water source conservation and sustainable drinking water management, contributing to improved health, hygiene, water security, and quality of life for the rural and tribal community.
Along with the quote we need the following from the vendor which needs to be mentioned in the advertisement:
PAN Card
GST registration certificate
MSME registration certificate (if applicable)
Aadhar Card
Three years income tax return
Context for bidders
There are 158 open Water & Environment tenders in India. This one closes in 4 days.
Similar Water & Environment tenders
- Replacement of 2 HP single phase Submersible pump motor set for Staff quarter at Mithanpura Muzaffarpur under Muzaffarpur BA· closes 22 Sept
- Procurement of ONLINE PARTICULATE MATTER CONTINUOUS EMISSION MONITORING SYSTEM (PM CEMS) for Stack Emission at PPS-I· closes 16 Sept
- Engagement of 02 Nos. tractor mounted water tanker for supplying of water for domestic purpose at Dumaria rehab site for the period of 365 days under Rajmahal Area.· closes 19 Sept
- Engagement of tractor mounted water tanker (01 Nos. tanker) for supplying of drinking water Lalmatia colony rehab site (Rauf group and Karim) under Rajmahal Area for the period of 365 days.· closes 19 Sept
- Providing Installing and fixing of Online Effluent Monitoring System at 5 MLD STP Zone-II, 4 MLD STP Zone-I at Sirhind and 3 MLD STP at Bassi Pathana based on SBR Technology and all other works contingent thereto at Sirhind and Bassi Pathana.· closes 21 Sept
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this water & environment opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
More Water & Environment tenders
- Civil Works — Cleaning of garbage/malba, internal alteration of wall , internal & external painting, PVC flooring and dressing nearby area of old CCN building for renting out to LIC HFL in T.E. campus at Motihari.BSNL — Bihar · India
- Replacement of 2 HP single phase Submersible pump motor set for Staff quarter at Mithanpura Muzaffarpur under Muzaffarpur BABSNL — Bihar · India
- Water and Sanitation invites bids for SUPPLY AND DELIVERY OF STATIONERY FOR DWS CONSTRUCTION SOUTH IN THE WESTERN CAPE. Procurement method: Request for Bid(Open-Tender). Category: works. Delivery locaWater and Sanitation · South Africa
- Water and Sanitation Invites Bids for Supply and Delivery of Wall Mounting Instrumentation Vibrating Wire Piezometer and Vibrating Wire Handheld Readout for the Raising of Clanwilliam DAM Project in TWater and Sanitation · South Africa
- Water and Sanitation Invites Bids for Supply and Delivery of Wall Monitoring Temperature Monitoring and Linear Potentiometer for the Raising of Clanwilliam DAM Project in the Western Cape for DWS ConsWater and Sanitation · South Africa
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →