FreeTender
Accepting bidstenderUnited States

Remediation and Restoration Activities — Other Environmental Services

Issued by TRANSPORTATION, DEPARTMENT OF · OFFICE OF THE SECRETARY · 6913G6 VOLPE NATL. TRANS. SYS CNTR · via SAM.gov — US federal contract opportunities

Published
9 Nov 2026
Closes
23 Nov 2026, 18:00 UTC
Reference
6913G627Q300003
Location
NJ, United States
Sector
Construction & Infrastructure

At a glance

TRANSPORTATION, DEPARTMENT OF · OFFICE OF THE SECRETARY · 6913G6 VOLPE NATL. TRANS. SYS CNTR in United States has published a tender in construction & infrastructure: “Remediation and Restoration Activities — Other Environmental Services”. Submissions close on 23 November 2026, 14 days from today. Quote reference 6913G627Q300003 in any correspondence with the buyer. FreeTender has recorded 6 notices from this buyer since 2026, 2 of them currently open. There are 399 open construction & infrastructure notices in United States on FreeTender. Bids are submitted to the buyer through SAM.gov — US federal contract opportunities, not through FreeTender.

Key requirements

Taken from the notice by FreeTender. The tender document on the official portal is binding — check it, and any corrigendum, before you bid.

To bid on SAM.gov (US federal)

You need an active SAM.gov entity registration with a Unique Entity ID (UEI) to be awarded a federal contract. Check the set-aside and NAICS size standard before you respond.

Details

TRANSPORTATION, DEPARTMENT OF · OFFICE OF THE SECRETARY · 6913G6 VOLPE NATL. TRANS. SYS CNTR is soliciting Remediation and Restoration Activities — Other Environmental Services. Solicitation number 6913G627Q300003 . Classified under NAICS 238910 — Site Preparation Contractors. Product/service code F999 — OTHER ENVIRONMENTAL SERVICES. Place of performance: NJ, USA. Responses are due by 23 November 2026 18:00 UTC. Posted on SAM.gov, the US federal contract opportunities system; registration is required to bid.

Under an Interagency Agreement, the U.S. Department of Transportation John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Environmental Cleanup (ECU) Program. As part of this effort, a Remedial Action (RA) will be conducted at one facility in the FAA Eastern Service Area (ESA) to remove identified soil contamination. The site requiring remediation for lead- and polychlorinated biphenyl (PCB)-contaminated soils is QPI RCAG – Matawan, NJ (40.370895°,-74.220954°). The FAA’s ECU Program has identified the potential for environmental and human health risks and/or liability associated with the facility above based on prior research, known historic operations and practices, and required cleanup actions. The Contractor shall conduct all work in accordance with Federal, State, and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirement. The Contractor shall submit a draft Remediation and Restoration work plan (Work Plan) (where applicable) within ten (10) business days of the project kick-off meeting that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all contaminated soil remediation, disposal, and site restoration activities described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished information (GFI) for pertinent information. The removal quantities and depths in the Preliminary Assessment/Site Investigation and Remedial Investigation reports (if provided) are to be used as a guide along with the estimated total quantities listed in this SOW Section 2.2.2. The Work Plan shall describe methods and procedures for performing soil remediation, disposal, and restoration. Disposal methods must be detailed by the contractor for the site. FAA has consulted a Licensed Site Remediation Professional (LSRP), and the LSRP will select and approve all disposal facilities where waste and debris is to be shipped. Disposal sampling and paperwork is the responsibility of the contractor. Confirmatory sampling has already been conducted at the site. Additionally, the work plan shall also identify any required permits needed to perform the work. Futhermore, components required with the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a brief Risk Management Plan that identifies major risks and hazards on each site and discusses ways to minimize these risks. An outline summarizing the required content of the work plan is Technical Approach (Method and procedures for soil remediation, removal, disposal a. Identification of required work permits and b. Site Safety Health Plan (SSHP). Risk Management Plan a. Identification of major risks and b.Risk mitigation plan. The contractor should expect a 5-business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments. Contaminated Soil Remediation: Preliminary Assessment/Site Investigation (PA/SI) and Remedial Investigation (RI) activities completed between 2020 and 2025 found soils at the below site containing contamination above FAA’s action levels, which are based on U.S. Environmental Protection Agency (EPA) and/or New Jersey Residential Soil Remediation Standards. Examples include lead-in-soil concentrations above 200 mg/kg (ppm) or PCB-in-soil concentrations above 0.25 mg/kg. See SOW for greater details.

Context for bidders

We hold 6 notices from TRANSPORTATION, DEPARTMENT OF · OFFICE OF THE SECRETARY · 6913G6 VOLPE NATL. TRANS. SYS CNTR, going back to August 2026 — 2 of them still open. They buy mostly in Construction & Infrastructure and Forestry & Wildlife. There are 399 open Construction & Infrastructure tenders in United States. This one closes in 14 days.

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Construction & Infrastructure tenders

All Construction & Infrastructure tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →