FreeTender
Accepting bidstenderUnited States

Please ensure a 60-day quote validity

Issued by DEPT OF DEFENSE · DEFENSE LOGISTICS AGENCY · DLA MARITIME · DLA MARITIME MECHANICSBURG · SPRMM1 DLA MECHANICSBURG · via SAM.gov — US federal contract opportunities

Published
17 Sept 2026
Closes
21 Oct 2026, 20:30 UTC
Reference
SPRMM1-26-Q-GC75
Location
United States
Sector
electrical-equipment

Details

DEPT OF DEFENSE · DEFENSE LOGISTICS AGENCY · DLA MARITIME · DLA MARITIME MECHANICSBURG · SPRMM1 DLA MECHANICSBURG is soliciting 61_MOTOR, a.C.. Solicitation number SPRMM1-26-Q-GC75. Classified under NAICS 335312 — Motor and Generator Manufacturing. Product/service code 6105 — MOTORS, ELECTRICAL. Responses are due by 21 October 2026 20:30 UTC. Posted on SAM.gov, the US federal contract opportunities system; registration is required to bid.

Please ensure a 60-day quote validity. Please submit pricing support such as, but not to limited to, an estimated informal cost breakdown, previous sales invoices for the item or any other supporting cost/price information. In accordance with FAR 15.404-1(b), other than certified cost or pricing data is required to determine pricing fair and reasonable. While this requirement is under the TINA threshold, Additional pricing support/cost drivers greatly assists in determining price reasonableness to move forward with award.

1. All contractual documents (i.e. contracts, purchase orders, task orders,

Delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.

2. Drawings or technical data are not available for this item

3. Delivery days_________aro

4. Offer valid for _____ days

5. When submitting quotes via Electronic Data Interchange (EDI), make sure

you specify any exceptions (i.e. Mil specs/standards, packaging, Inspection & Acceptance (I&A), packaging houses etc) or follow up with a hardcopy of the exceptions. If nothing is indicated or received, award will be based upon solicitation requirements. Changes or requests for changes after award will have consideration costs deducted on modifications. 6. If you are not the manufacturer of the material you are offering, you MUST state who the Original Equipment Manufacturer (OEM) is ¨Commercial and Government Entity Code (CAGE) code) and the part number you are offering.

7. Please provide an email address for follow up communications

____________________________________________________________ 8. It is recommended that vendors provide contact information to NAVSUP Weapon System Support (WSS) Mechanicsburg in order to receive automated notifications from Navy Electronic Commerce Online (NECO) when contracts/modifications are issued by Defense Logistics Agency (DLA) Weapons Support Mechanicsburg and posted on Procurement Integrated Enterprise Environment (PIEE) Electronic Data Access (EDA). To receive these notifications, contact: NAVSUPWSS code 025, procurement systems design and contract support division Via email at [contact details removed]. Please include the following

information with your request: CAGE code, company name, address and

Point-of-Contact (POC) with phone number and email address.

9. Contractors can view their orders, contracts and modifications at the

EDA web tool. This web tool is located at the PIEE website. It is recommended that the contractor register for EDA at https://piee.eb.mil/. Click on new user and registration. Any order resulting from this Request for Quotation will require electronic submittal of Invoice and Receiving Report (COMBO) through PIEE-WAWF.

10. The following DLA Procurement Notes are applicable to this requirement

E06 Inspection and Acceptance at Source (JUN 2018)

11. INSPECTION OF MATERIAL WILL BE AT (CAGE & ADDRESS)

______________________________________________________________ INSPECTION OF PACKAGING AND FINAL ACCEPTANCE OF MATERIAL WILL BE AT (CAGE &

ADDRESS):

______________________________________________________________

12. UCF SECTION F PRODUCTION FACILITY CHANGES

(a) The performance of any of the work contracted for in any place other than that named in the contract is prohibited unless specifically approved by the Contracting Officer. Written requests for a change in production facilities must be submitted in writing to the Contracting Officer. Changes in production

facilities may be approved, provided:

(1) Performance by small business or in labor surplus areas as required by the contract will not be changed; (2) The change will not cause a delay in delivery or necessitate a change in the purchase description; (3) The free on board (f.o.b.) point is not changed; and (4) Each request is supported by a price reduction of $250.00 to cover the Government's administrative costs to process the change. (b) The Government reserves the right to deny approval even if these four elements are met. INSPECTION AT ORIGIN ACCEPTANCE AT ORIGIN

POC EMAIL: [contact details removed]

Context for bidders

We hold 185 notices from DEPT OF DEFENSE · DEFENSE LOGISTICS AGENCY · DLA MARITIME · DLA MARITIME MECHANICSBURG · SPRMM1 DLA MECHANICSBURG, going back to August 2026132 of them still open. They buy mostly in Manufacturing & Supply, electronics-semiconductors and electrical-equipment. There are 494 open electrical-equipment tenders in United States. This one closes in 34 days.

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this electrical-equipment opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More electrical-equipment tenders

All electrical-equipment tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →