Perluasan dan Revitalisasi Mushola Kantor PLN UIW Bangka Belitung
Issued by PT PLN (Persero) — UNIT INDUK WILAYAH BANGKA BELITUNG · via Indonesia — PLN e-Procurement (PT PLN (Persero))
- Published
- 16 Nov 2026
- Closes
- 25 Nov 2026, 16:59 UTC
- Value
- IDR 420,372,152
- Reference
- EPROC-3200-20261116-3200-00001
- Location
- Indonesia
- Sector
- Construction & Infrastructure
- Type
- works
At a glance
PT PLN (Persero) — UNIT INDUK WILAYAH BANGKA BELITUNG in Indonesia has published a tender in construction & infrastructure: “Perluasan dan Revitalisasi Mushola Kantor PLN UIW Bangka Belitung”. Submissions close on 25 November 2026, 8 days from today. The stated value is IDR 420,372,152. Quote reference EPROC-3200-20261116-3200-00001 in any correspondence with the buyer. There are 22 open construction & infrastructure notices in Indonesia on FreeTender. Bids are submitted to the buyer through Indonesia — PLN e-Procurement (PT PLN (Persero)), not through FreeTender.
Details
Construction works procurement by PT PLN (Persero), UNIT INDUK WILAYAH BANGKA BELITUNG.
Items / scope:
- Renovasi Gedung/Rumah/Ruangan: 1 AU
Procurement type: TENDER TERBUKA. Method: Terbuka Pascakualifikasi 1 Tahap 1 Sampul. Contract type: KONTRAK GABUNGAN LUMPSUM DAN HARGA SATUAN. Qualification: PASCA KUALIFIKASI. Bid submission: SATU TAHAP SATU SAMPUL. Evaluation: SISTEM GUGUR. Price offer: BIDDING. Eligible supplier classes: Kecil, Menengah. Owner's estimate (HPS): IDR 420,372,152. Tender document (RKS) no.: 0005.RKS/DAN.01.01/F23000000/2026.
Business fields (bidang / sub-bidang):
- Bidang Bangunan Gedung / Jasa Pelaksana Konstruksi Bangunan Kesehatan - Pengadaan Sipil / Jasa Konstruksi Sipil - Pengadaan Konstruksi / Sipil / Perawatan Gedung/ Bangunan - Bidang Bangunan Gedung / Jasa Pelaksana Konstruksi Bangunan Gedung Lainnya - Pengadaan Konstruksi / Arsitektur - Bidang Bangunan Gedung / Jasa Pelaksanaan Konstruksi Gedung Perkantoran - Bidang Bangunan Gedung / Jasa Pelaksana Konstruksi Bangunan Pendidikan - Jasa Konstruksi Sipil / Jasa Konstruksi Sipil - Pengadaan Konstruksi / Sipil
Administrative requirements:
- Fotocopy Tanda daftar perusahaan/Nomor induk berusaha (NIB): Nomor Induk Berusaha (NIB) yang masih berlaku dengan memilih sekurang-kurangnya salah satu dari KBLI sebagai berikut : 1. Konstruksi Gedung Lainnya : 41019 2. Konstruksi Gedung Perkantoran : 41012 3. Konstruksi Gedung Kesehatan : 41015 4. Konstruksi Gedung Pendidikan : 41016
- Formulir Isian Dokumen Kualifikasi: Formulir isian kualifikasi (sesuai lampiran v – ix)
- Surat Ketetapan Nomor Pokok Wajib Pajak (NPWP) dan Surat Pengukuhan Menjadi Pengusaha Kena Pajak (PKP): Surat penetapan pengusaha kena pajak (SPPKP), dan nomor pokok wajib pajak (NPWP) - Akta pendirian Badan Usaha berserta perubahan terakhir: Akta pendirian Perusahaan beserta perubahannya - Bukti pelunasan kewajiban pajak Tahun terakhir (SPT/PPh): Telah memenuhi kewajiban perpajakan tahun terakhir, dibuktikan dengan melampirkan fotokopi bukti tanda terima penyampaian SPT Tahun 2025 dan salinan bukti setoran pajak PPh atau PPN bulan Juni, Juli dan/atau Agustus 2026
Financial requirements:
- Surat Dukungan Bank: Surat keterangan dukungan keuangan dari bank.
- Laporan keuangan yang telah diaudit atau dapat berupa hasil rating atau pemeringkatan dari lembaga pemeringkat keuangan yang kredibel: Mempunyai kemampuan keuangan yang memadai yang didukung dengan laporan keuangan minimal tahun 2024 atau 2025 yang telah diaudit akuntan publik atau dapat berupa hasil rating atau pemeringkatan keuangan dari lembaga pemeringkat keuangan yang kredibel
- Referensi Bank: Surat referensi Bank yang tidak sedang menjalani sanksi blacklist dari PT PLN (Persero)
Technical requirements:
- Sertifikat Ahli K3: Melampirkan sertifikat keahlian K3 (Ahli K3 Umum) dari Depnaker RI
- Sertifikat Contractor Safety Management System (CSMS) PLN: Salinan sertifikat CSMS dengan level tingkat risiko sekurang-kurangnya Moderat.
Schedule (Jakarta time)
- Pengumuman Pengadaan: 16 Nov 2026 10:00 to 19 Nov 2026 10:00 WIB
- Pendaftaran dan Download Dokumen Tender / RKS: 16 Nov 2026 11:00 to 24 Nov 2026 23:00 WIB
- Pemberian Penjelasan: 17 Nov 2026 09:00 to 17 Nov 2026 12:00 WIB
- Upload Dokumen Penawaran: 18 Nov 2026 00:00 to 25 Nov 2026 23:59 WIB
Registration and bid submission are electronic through the PLN e-Procurement portal, which requires vendor registration.
Context for bidders
There are 22 open Construction & Infrastructure tenders in Indonesia. This one closes in 8 days.
Similar Construction & Infrastructure tenders
- Pekerjaan Volume Based Building Management System PT PLN (Persero) UP2B Sistem Makassar, UPT Makassar dan UPT Kendari Selama 5 (Lima) tahun 2026-2031· closes 29 Nov
- Flooring Utility Room Heritage & New Building· closes 23 Nov
- Pengadaan dan Pemasangan Baterai 110 Vdc dan Rectifier 110 Vdc· closes 25 Nov
- Pekerjaan Pemantauan/Pengukuran Lingkungan Hidup Operasional Kantor Peridoe Semeseter II 2026 dan Semester I 2027, Lokasi : PT PLN (Persero) UIW PPB - UP3 Tersebar· closes 20 Nov
- Pengadaan dan Pemasangan Tla di UPT Madiun - Percepatan Program Abo· closes 26 Nov
Explore Indonesia
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this construction & infrastructure opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
Who won similar contracts
Recent contract awards in Indonesia, from published award notices.
- Preparation of Technical Materials for Detailed Spatial Planning Plans Ready for OSS (RDTR) Package-2 (7 Lots : Southeast Sulawesi(SES)-1, SES-2, SES-3, SES-4, SES-5, North Sulawesi (NS)-1, and NS-2)Won by Plano Engineering Consultant (Indonesia) · IDR 3,449,560,000.00 · 8 Oct 2026
- Project Supervision Consultant for Bendung River SystemWon by PT. Ciriajasa Engineering Consultant (Indonesia) · IDR 7,475,803,400.00 · 29 Sept 2026
More Construction & Infrastructure tenders
- اعمال نزح مياه الصرف الصحي لمباني الادارة العامة للدفاع المدني بمحافظة جدةادارة الشؤون الفنية المركزية بمنطقة مكة المكرمة · Saudi Arabia
- عملية استبدال أرضية الملعب الرئيسي لكرة القدم من عشب صناعي الى عشب طبيعي بنادي الدرع الرياضي بالدوادميوزارة الرياضة · Saudi Arabia
- تأمين المقابل المالي للاعمال الرقابية لرخصة ممارس إشعاعية لزوم مستشفى الأمير سلمان بن محمد بالدلمتجمع الرياض الصحي الأول · Saudi Arabia
- المقايل المالي السنوي لعام 2026م للرخصة رقم ( 31287RY-03)تجمع الرياض الصحي الأول · Saudi Arabia
- تحديد معدلات الاستهلاك لعينة من المباني والأنشطة المختلفة (المرحلة الثانية)المركز الوطني لكفاءه وترشيد المياه · Saudi Arabia
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →