FreeTender
Accepting bidstenderIndonesia

Perkuatan Tower SUTT 150 kV Batang - Pekalongan

Issued by PT PLN (Persero) — UPT PURWOKERTO · via Indonesia — PLN e-Procurement (PT PLN (Persero))

Published
4 Nov 2026
Closes
23 Nov 2026, 05:00 UTC
Value
IDR 614,521,000
Reference
EPROC-2350-20261103-2350-00001
Location
Indonesia
Sector
Energy & Power
Type
works

At a glance

PT PLN (Persero) — UPT PURWOKERTO in Indonesia has published a tender in energy & power: “Perkuatan Tower SUTT 150 kV Batang - Pekalongan”. Submissions close on 23 November 2026, 19 days from today. The stated value is IDR 614,521,000. Quote reference EPROC-2350-20261103-2350-00001 in any correspondence with the buyer. FreeTender has recorded 3 notices from this buyer since 2026, 3 of them currently open. There are 140 open energy & power notices in Indonesia on FreeTender. Bids are submitted to the buyer through Indonesia — PLN e-Procurement (PT PLN (Persero)), not through FreeTender.

Details

Construction works procurement by PT PLN (Persero), UPT PURWOKERTO.

Items / scope:

- Pekerjaan Jasa Transmisi: 1 LOT

Procurement type: TENDER TERBUKA. Method: Terbuka Pascakualifikasi 1 Tahap 2 Sampul. Contract type: KONTRAK GABUNGAN LUMPSUM DAN HARGA SATUAN. Qualification: PASCA KUALIFIKASI. Bid submission: SATU TAHAP DUA SAMPUL. Evaluation: SISTEM GUGUR. Price offer: BIDDING. Eligible supplier classes: Besar, Menengah. Owner's estimate (HPS): IDR 614,521,000. Tender document (RKS) no.: 019.DOK/DAN.01.03/UPT PWT/2026.

Business fields (bidang / sub-bidang):

- Jasa Pembangunan dan Pemasangan Bidang Transmisi Tenaga Listrik / Jaringan Transmisi Tenaga Listrik Tegangan Tinggi dan/atau Ekstra Tinggi

Administrative requirements:

- Pakta Integritas: KA1

- Izin Usaha Jasa Penunjang Tenaga Listrik (IUJPTL): KA5

- Izin Lokasi / PKKPR: KA4

- Sertifikat Badan Usaha Jasa Penunjang Tenaga Listrik (SBUJPTL): KA6 - Fotokopi Akta Pendirian Perusahaan beserta perubahan terakhir dilengkapi pengesahan dari Menteri Hukum dan HAM: KA2 - Fotocopy Tanda daftar perusahaan/Nomor induk berusaha (NIB): KA3 - Surat Pernyataan tidak dalam Pengawasan Pengadilan,tidak bangkrut,kegiatan usaha tidak dihentikan dan atau Direksi yang bertindak untuk dan atas nama perusahaan tidak sedang menjalani sanksi pidana: KA9 - Surat Pernyataan memiliki kapasitas menandatangani kontrak: KA10 - Direksi/Pengurus yang bertindak untuk dan atas nama perusahaan tidak masuk dalam daftar penyedia Barang/Jasa yang terkena daftar hitam (blacklist): KA11 - Surat Pernyataan Tidak Pernah mendapatkan Surat Teguran / Surat Peringatan dari PLN UIT-JBT (Termasuk UPT dibawahnya) dalam kurun waktu 1 (Satu) tahun terakhir: KA12 - Bukti Tanda terima penyampaian Surat Pajak Tahunan (SPT) Pajak Penghasilan (PPh) tahun terakhir serta bukti setoran pajak (SSP) PPh pasa 29 atau PPN sekurang-kurangnya 3 bulan terakhir: KA13

- Surat Perjanjian Konsorsium: KA8 (Bila berbentuk Kerjasama Operasi/ KSO)

- Sertifikat Badan Usaha Jasa Konstruksi (SBUJK): KA7

Financial requirements:

- Surat Dukungan Bank: KC1

- Perhitungan Sisa Kemampuan Keuangan (SKK): KC2 SKK DAN SKP

- Referensi Bank: KC3

- Laporan Keuangan Perusahaan: KC4

Technical requirements:

- Sertifikat Contractor Safety Management System (CSMS) PLN: KD2 - Sertifikat Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3): KD1 - atau ISO 45001 - Surat Pernyataan Penggunaan Produk Dalam Negeri: KB1 - Daftar Peralatan Kerja / Perlengkapan Kerja, Umur dan Status Kepemilikan: KB3

- Menyampaikan Bagan Organisasi Proyek: KB4

- Daftar Pengalaman Perusahaan: KB2 (Pekerjaan Perkuatan Tower SUTT/SUTET)

Schedule (Jakarta time)

- Pengumuman Pengadaan: 04 Nov 2026 11:00 to 09 Nov 2026 11:00 WIB

- Pendaftaran dan Download Dokumen Tender / RKS: 04 Nov 2026 11:00 to 09 Nov 2026 14:00 WIB

- Pemberian Penjelasan: 10 Nov 2026 09:00 to 11 Nov 2026 12:00 WIB

- Upload Dokumen Penawaran: 12 Nov 2026 09:00 to 23 Nov 2026 12:00 WIB

Registration and bid submission are electronic through the PLN e-Procurement portal, which requires vendor registration.

Context for bidders

We hold 3 notices from PT PLN (Persero) — UPT PURWOKERTO, going back to October 2026 — 3 of them still open. There are 140 open Energy & Power tenders in Indonesia. This one closes in 19 days.

Before you bid on this tender

A quick checklist to help you decide whether to bid and prepare a compliant submission for this energy & power opportunity. Always verify the details on the official source.

  • Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
  • Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
  • Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
  • Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
  • Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
  • Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.

More Energy & Power tenders

All Energy & Power tenders →

FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.

Verify & apply on the official portal →