Perbaikan Sistem Pengaman Petir Tersebar di UPT Madiun - Percepatan Program Abo
Issued by PT PLN (Persero) — UPT MADIUN · via Indonesia — PLN e-Procurement (PT PLN (Persero))
- Published
- 16 Nov 2026
- Closes
- 1 Dec 2026, 07:00 UTC
- Value
- IDR 1,521,943,651
- Reference
- EPROC-2430-20261113-2430-00001
- Location
- Indonesia
- Sector
- Energy & Power
- Type
- works
At a glance
PT PLN (Persero) — UPT MADIUN in Indonesia has published a tender in energy & power: “Perbaikan Sistem Pengaman Petir Tersebar di UPT Madiun - Percepatan Program Abo”. Submissions close on 1 December 2026, 16 days from today. The stated value is IDR 1,521,943,651. Quote reference EPROC-2430-20261113-2430-00001 in any correspondence with the buyer. FreeTender has recorded 5 notices from this buyer since 2026, 3 of them currently open. There are 88 open energy & power notices in Indonesia on FreeTender. Bids are submitted to the buyer through Indonesia — PLN e-Procurement (PT PLN (Persero)), not through FreeTender.
Details
Construction works procurement by PT PLN (Persero), UPT MADIUN.
Items / scope:
- Jasa Pemasangan Grounding system: 1 SET
Procurement type: TENDER TERBUKA. Method: Terbuka Pascakualifikasi 1 Tahap 2 Sampul. Contract type: KONTRAK LUMPSUM. Qualification: PASCA KUALIFIKASI. Bid submission: SATU TAHAP DUA SAMPUL. Evaluation: SISTEM GUGUR. Price offer: BIDDING. Eligible supplier classes: Besar, Kecil, Menengah. Owner's estimate (HPS): IDR 1,521,943,651. Tender document (RKS) no.: 038.DOK/DAN.01.03/F34020000/AI/2026.
Business fields (bidang / sub-bidang):
- Jasa Pembangunan dan Pemasangan Bidang Transmisi Tenaga Listrik / Jaringan Transmisi Tenaga Listrik Tegangan Tinggi dan/atau Ekstra Tinggi - Jasa Pembangunan dan Pemasangan Bidang Transmisi Tenaga Listrik / Saluran Udara Tenaga Listrik Tegangan Tinggi - Jasa Pembangunan dan Pemasangan Bidang Transmisi Tenaga Listrik / Saluran Udara Tenaga Listrik Tegangan Ekstra Tinggi
Administrative requirements:
- Formulir Isian Dokumen Kualifikasi - Fotokopi Akta Pendirian Perusahaan beserta perubahan terakhir dilengkapi pengesahan dari Menteri Hukum dan HAM - Nomor Induk Berusaha (NIB) dengan lampiran nomor Klasifikasi Baku Lapangan Usaha Indonesia (KBLI) terkait Pembangkit Tenaga Listrik: Dikeluarkan oleh Lembaga OSS
- Izin Lokasi / PKKPR: Dikeluarkan oleh Lembaga OSS (Bisa menggunakan SITU/SKD)
- Surat Ketetapan Nomor Pokok Wajib Pajak (NPWP) dan Surat Pengukuhan Menjadi Pengusaha Kena Pajak (PKP)
- Sertifikat ISO 9001: 2015
- ISO 14001 - Izin Usaha Jasa Penunjang Tenaga Listrik (IUJPTL): Dikeluarkan oleh Lembaga OSS - Peraturan Pencegahan Korupsi Perusahaan: Sudah disahkan oleh Kementrian Ketenagakerjaan RI (Bisa menggunakan Surat Pernyataan Komitmen Anti Gratifikasi) - Bukti Tanda terima penyampaian Surat Pajak Tahunan (SPT) Pajak Penghasilan (PPh) tahun terakhir serta bukti setoran pajak (SSP) PPh pasa 29 atau PPN sekurang-kurangnya 3 bulan terakhir: tahun 2025 dan PPh minimal bulan Juli Agustus September 2026 - Sertifikat Badan Usaha Jasa Penunjang Tenaga Listrik (SBUJPTL): Bidang Pembangunan & Pemasangan Instalasi Tenaga Listrik Su Bidang Gardu Induk Minimal Kecil
Financial requirements:
- Laporan Keuangan Perusahaan yang telah diaudit oleh Kantor Akuntan Publik yang berizin dari Kementerian Keuangan atau otoritas Jasa Keuangan atau Badan Pemeriksa Keuangan: 3 Tahun Terakhir
- Surat Dukungan Bank: Minimal Sebesar Rp. 170.000.000,-
- Sertifikat Pemeringkat Keuangan dari Lembaga Pemeringkat Keuangan yang Kredibel (PT D&B Indonesia atau yang setara): Minimal 1A3/1AA3
Technical requirements:
- Pengalaman Pekerjaan di bidang sejenis dalam jangka waktu 5 (lima) Tahun terakhir yang dibuktikan dengan copy kontrak/perjanjian dan copy BASTP akhir.
- Daftar personil inti: Sesuai RKS
- Daftar Tenaga Kerja Teknik, Serkom, KTP Tenaga Kerja - Menyampaikan Bagan Organisasi Proyek - Daftar Alat Kerja - Daftar Alat Pelindung Diri - Sertifikat Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3): Bisa menggunakan ISO 45001 - Sertifikat Contractor Safety Management System (CSMS) PLN: Tingkat Resiko EKSTREM
- Sertifikat Ahli K3: AK3U dilengkapi (Serifikat Pembinaan, Surat Keputusan, & Kartu Kewenangan)
- Nilai Pengalaman Tertinggi (NPt): Minimal Rp. 1.350.000.000 pada pekerjaan sesuai Sub Bidang dalam kurun waktu 5 Tahun
Schedule (Jakarta time)
- Pengumuman Pengadaan: 16 Nov 2026 08:00 to 19 Nov 2026 08:00 WIB
- Pendaftaran dan Download Dokumen Tender / RKS: 16 Nov 2026 08:01 to 30 Nov 2026 08:00 WIB
- Pemberian Penjelasan: 19 Nov 2026 08:00 to 19 Nov 2026 16:00 WIB
- Upload Dokumen Penawaran: 20 Nov 2026 08:00 to 01 Dec 2026 14:00 WIB
Registration and bid submission are electronic through the PLN e-Procurement portal, which requires vendor registration.
Context for bidders
We hold 5 notices from PT PLN (Persero) — UPT MADIUN, going back to October 2026 — 3 of them still open. They buy mostly in Energy & Power and Construction & Infrastructure. There are 88 open Energy & Power tenders in Indonesia. This one closes in 16 days.
More from this buyer
Similar Energy & Power tenders
- Penggantian PMT GITET Suralaya (GIS)· closes 1 Dec
- Penggantian Kabel Power Tersebar di Wilayah UPT Madiun· closes 27 Nov
- Pengadaan Jasa Penyusua Dokumen Lingkungan DELH (Dokumen Evaluasi Lingkungan Hidup) PLTD Tolonuo· closes 20 Nov
- Jasa Penggantian Pmt GITET Cilegon (Ais)· closes 2 Dec
- Pembangunan Retaining Wall Tower SUTT Tahap II· closes 26 Nov
Explore Indonesia
Before you bid on this tender
A quick checklist to help you decide whether to bid and prepare a compliant submission for this energy & power opportunity. Always verify the details on the official source.
- Confirm the exact closing date and time (and time zone) on the official portal — deadlines are strict and can be revised by a corrigendum.
- Read the full notice and every attached document, including the scope, specifications and any bill of quantities or terms of reference.
- Check the eligibility criteria — prior similar experience, annual turnover, certifications and registrations — and make sure you qualify before investing effort.
- Prepare any earnest-money deposit (EMD) or bid security and the required formats early; missing or wrongly-formatted documents are a common cause of rejection.
- Note how bids must be submitted (online or physical), in what format, and whether a digital signature or portal registration is required.
- Watch for corrigenda and clarifications right up to the deadline — requirements and dates can change.
Who won similar contracts
Recent contract awards in Indonesia, from published award notices.
- Preparation of Technical Materials for Detailed Spatial Planning Plans Ready for OSS (RDTR) Package-2 (7 Lots : Southeast Sulawesi(SES)-1, SES-2, SES-3, SES-4, SES-5, North Sulawesi (NS)-1, and NS-2)Won by Plano Engineering Consultant (Indonesia) · IDR 3,449,560,000.00 · 8 Oct 2026
- Project Supervision Consultant for Bendung River SystemWon by PT. Ciriajasa Engineering Consultant (Indonesia) · IDR 7,475,803,400.00 · 29 Sept 2026
More Energy & Power tenders
- Repair and Overhauling Service - Diesel Generators- Dg Sets (DFM)Department of Military Affairs · India
- Repair and Overhauling Service - Uninterruptible Power Supply (Ups) (DFM)Department of Military Affairs · India
- BMC for Deployment of Senior Foreman for Supervision during Generator Overhauling as Per Electrical OS IOM for NTPC North Karanpura Super ThermalMinistry of Power · India
- CMC for High Frequency X-ray Generator at OFH, Avadi for a period of 1 year on PAC basisDepartment of Defence Production · India
- Solar powered Avian defender bird scarerDepartment of Military Affairs · India
FreeTender mirrors this notice for reference. Verify the details and bid on the official portal.
Verify & apply on the official portal →